Forwards Safety Insp Rept 50-278/86-09 on 860318-21.No Violations Noted.Enforcement Conference Scheduled on 860327 at Region I Ofc Re out-of-sequence Control Rod Withdrawal During Startup on 860317-18
ML20154R716
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 03/25/1986
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20154R720 List:
References
NUDOCS 8603310157
Download: ML20154R716 (2)


See also: IR 05000278/1986009

Text

W

.

.

2 5 MAR 1986

Docket Nos. 50-278/DPR-56

Philadelphia Electric Company

ATTN: Mr. S. L. Daltrof f

Vice President

Electric Production

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject: Inspection 50-278/86-09

This transmits the findings of a special safety inspection conducted by the

NRC Resident Inspectors on March 18 - 21, 1986, at the Peach Bottom Atomic

Power Station, Delta, Pennsylvania. The inspection consisted of a review of

the causes for the occurrence of an out-of-sequence control rod withdrawal

during the Unit 3 startup on March 17 - 18, 1986. These findings were based

on observation of activities, interviews, document reviews, and were discussed

with W. T. Ullrich and R. S. Fleischmann and of your staff on March 21, 1986.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter.

Based on the results of our inspection, we are concerned about the operation of

Peach Bottom Unit 3 with the rod worth minimizer out of service, concurrent

with the bypassing of the rod sequence control system function by Shift

Supervision and the failure of the two licensed operators to adequately verify

the control rod withdrawal sequence. The details of these concerns are

delineated in the enclosed special inspection report. An enforcement confer-

ence has been scheduled for March 27,1986, in the Region I office to further

discuss these concerns. At this conference you should be prepared to discuss

your review of the concerns identified in the inspection report and corrective

actions taken or planned.

The need for and nature of appropriate enforcement action relative. to the

issues identified in the enclosed report will be considered'after this confer-

ence and will be the subject of separate correspondence at a later time.

No response to this letter is required.

Your cooperation with us is appreciated.

Sincerely,

Richard W. Starostecki, Director

Division of Reactor Projects

0FFICIAL RECORD COPY CIR PB 86-09 - 0001.0.0

03/25/86

8603310157 860325

gDR ADOCK 0 % 2 8

E

g hol \

L

.

Philadelphia Electric Company 2

'

Enclosures:

1. NRC Region I Inspection Report No. 50-278/86-09

cc w/encls:

-R. S. Fleischmann, Manager (Receives All 2.790 Information)

- John S. Kemper, Vice President, Engineering and Research

-Troy B. Conner, Jr. , Esquire

- W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric

-Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

~ Raymond L. Hovis, Esquire

Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)

-W. M. Alden, Engineer in Charge, Licensing Section

Public Document Room (POR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

J RC Resident Inspector

-Commonwealth of Pennsylvania

bec w/encls:

etRegion I Docket Room (with concurrences)

-Management Assistant, DRMA (w/o encl)

o Section Chief, DRP

- L. Bettenhausen, DRS

A G. Gears, NRR

- D. Holody, RI

.

- J. Gutierrez, RI

- E. Weiss, IE

R

R C@ RI:DRP RP :DRP

Wi ams/mjd J son Gallo b ins (Starostecki

3 86 3/'J, 86 3 86 3/%/86 3M/86

0FFICIAL RECORD COPY CIR PB 86-09 - 0002.0.0

03/25/86