ML20154R520
| ML20154R520 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 05/27/1988 |
| From: | Bettenhausen L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20154R524 | List: |
| References | |
| NUDOCS 8806080001 | |
| Download: ML20154R520 (6) | |
See also: IR 05000336/1988007
Text
_ - - _ - _ _ _ _ _ - - _ _ -
. r,'.4 3
N
.
s
g
.,
Docket No:
50-336
MAY 2 71998
Northeast Nuclear Energy Company
-
ATTN: Mr. Edward J. Mroczka
Senior Vice President - Nuclear
Engineering"and Operations Group
P.O.' Box 270
-Hartford, Connecticut
06101-0270
Gentlemen:
Subject: Routine Resident Inspection 50-336/88-07 (3/22/88 - 5/2/88)
This transmits the report of the above subject inspection of Millstone 2.
The in-
.spection findings have been discussed with Messrs. S. Scace and J. Keenan of your
staff.
A violation was identified for improper calibration of the Control Room Ventilation
Radiation Monitors. Also, a deviation (Appendix B) was identified on calibration
of these radiation monitors.
Please respond to the violation and deviation in
accordance with Appendices A and B.
We consider it significant that the enclosed violation and deviation were identi-
fied by NRC follow-up on an allegation by one of your employees.
Further, as is
stated in Detail 8.2.5 (Page 25) of the enclosed report, daficiencies in radiation
monitor calibrations have been repeatedly noted by the NRC.
These circumstances
indicate deficiencies in the content and/or management of your programs to elicit
and address employee concerns and to address NRC findings.
Therefore, with your
reply to the enclosed violation, please specifically include your actions to im-
prove the effectiveness of addressal of employee concerns and NRC findings.
We also wish to note the effective implementation of identified and preventive
maintenance programs on various safety systems (Report Detail 3.1).
Good oversight
and management of the programs was found.
Your cooperation with us is appreciated.
Sincerely,
>&;;1ral Sigued J;4
I L
E1C
/
fee
. Bettenhausen, Chief
2/ Pr@ects Branch No.1
/
Division of Reactor Projects
Enclosures:
1.
Appendix A, Notice of Violation
2.
Appendix B, Notice of Deviation
3.
NRC Region I Inspection Report 50-336/88-07
0FFICIAL RECORD COPY
DL50-336/88-07 - 0001.0.0
t ((
05/20/88
M O/.
8806080001 880527
ADOCK 05000336
_o
DCD.
- _________
- ,
r, ' . '
-
, .
-
s
a
' Northeast Nuclear Energy Company
2
ccc w/encls:
W. D. Romberg, Vice President,. Nuclear Operations
R. M. Kacich, Manager, Generation Facilities Licensing
D. O. Nordquist, Director of Quality Services.
'S. E. Scace, Station Superintendent
Public Docket Room
Local ~Public Document Room (LPDR)-
Nuclear Safety.Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
bec w/encls:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enclosures)
DRP Section Chief
W. Raymond, SRI, Millstone 1,2&3
J. Shedlosky, SRI, Haddam Neck
D. Jaffe, LPM, NRR
'R. Bores, DRSS
M. Conner, DRP
A. Shropshire, RI
'
.
i
RI RP
RI:
P
R: R
g
Ra .ond/meo
McCab'e
Bettenhausen
5/26/88
c /27
0FFICIAL RECORD COPY
DL50-336/88-07 - 0002.0.0
05/20/88
. _ _ _ _ _ _ _