ML20154R520

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-336/88-07 on 880322-0502 & Notices of Violation & Deviation.Circumstances Indicate Deficiencies in Content &/Or Mgt of Util Programs to Elicit & Address Employee Concerns & to Address NRC Findings
ML20154R520
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/27/1988
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20154R524 List:
References
NUDOCS 8806080001
Download: ML20154R520 (6)


See also: IR 05000336/1988007

Text

_ - - _ - _ _ _ _ _ - - _ _ -

. r,'.4 3

N

.

s

g

.,

Docket No:

50-336

MAY 2 71998

Northeast Nuclear Energy Company

-

ATTN: Mr. Edward J. Mroczka

Senior Vice President - Nuclear

Engineering"and Operations Group

P.O.' Box 270

-Hartford, Connecticut

06101-0270

Gentlemen:

Subject: Routine Resident Inspection 50-336/88-07 (3/22/88 - 5/2/88)

This transmits the report of the above subject inspection of Millstone 2.

The in-

.spection findings have been discussed with Messrs. S. Scace and J. Keenan of your

staff.

A violation was identified for improper calibration of the Control Room Ventilation

Radiation Monitors. Also, a deviation (Appendix B) was identified on calibration

of these radiation monitors.

Please respond to the violation and deviation in

accordance with Appendices A and B.

We consider it significant that the enclosed violation and deviation were identi-

fied by NRC follow-up on an allegation by one of your employees.

Further, as is

stated in Detail 8.2.5 (Page 25) of the enclosed report, daficiencies in radiation

monitor calibrations have been repeatedly noted by the NRC.

These circumstances

indicate deficiencies in the content and/or management of your programs to elicit

and address employee concerns and to address NRC findings.

Therefore, with your

reply to the enclosed violation, please specifically include your actions to im-

prove the effectiveness of addressal of employee concerns and NRC findings.

We also wish to note the effective implementation of identified and preventive

maintenance programs on various safety systems (Report Detail 3.1).

Good oversight

and management of the programs was found.

Your cooperation with us is appreciated.

Sincerely,

>&;;1ral Sigued J;4

I L

E1C

/

fee

. Bettenhausen, Chief

2/ Pr@ects Branch No.1

/

Division of Reactor Projects

Enclosures:

1.

Appendix A, Notice of Violation

2.

Appendix B, Notice of Deviation

3.

NRC Region I Inspection Report 50-336/88-07

0FFICIAL RECORD COPY

DL50-336/88-07 - 0001.0.0

t ((

05/20/88

M O/.

8806080001 880527

PDR

ADOCK 05000336

_o

DCD.

- _________

,

r, ' . '

-

, .

-

s

a

' Northeast Nuclear Energy Company

2

ccc w/encls:

W. D. Romberg, Vice President,. Nuclear Operations

R. M. Kacich, Manager, Generation Facilities Licensing

D. O. Nordquist, Director of Quality Services.

'S. E. Scace, Station Superintendent

Public Docket Room

Local ~Public Document Room (LPDR)-

Nuclear Safety.Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bec w/encls:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enclosures)

DRP Section Chief

W. Raymond, SRI, Millstone 1,2&3

J. Shedlosky, SRI, Haddam Neck

D. Jaffe, LPM, NRR

'R. Bores, DRSS

M. Conner, DRP

A. Shropshire, RI

'

.

i

RI RP

RI:

P

R: R

g

Ra .ond/meo

McCab'e

Bettenhausen

5/26/88

c /27

0FFICIAL RECORD COPY

DL50-336/88-07 - 0002.0.0

05/20/88

. _ _ _ _ _ _ _