ML20154R447

From kanterella
Jump to navigation Jump to search
Forwards Request for Addl Info Re 820211 Application for Amends to Licenses DPR-44 & DPR-56 Re Overtime Work Limits. Response Requested No Later than 30 Days from Receipt of Ltr
ML20154R447
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/25/1986
From: Gears G
Office of Nuclear Reactor Regulation
To: Bauer E
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 8603280363
Download: ML20154R447 (3)


Text

_ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ - _ --

DISTRIBUTION Docket 111e, BGrimes Docket Nos. 50-277/278 NRC'PDR' '~ JPartlow Local PDR ACRS(10)

RBernero OELD h 2 5 B86 SNorris Gray File Mr. E. G. Bauer, Jr. GGears Edordan Vice President and General Counsel 2301 Market. Street P..O. Box 8699 Philadelphia, PA 19101 I

)

Dear Mr. Bauer:

SUBJECT:

REQUEST FOR ADDITI0NAL INFORMATION CONCERNING THE FACILITY STAFF OVERTIME WORK AMENDMENT REQUEST Re: Peach Bottom Atuic Power Station, Units 2 and 3 I

We are in the process of reviewing your amendment request dated February 11, l 1982, as amended on August 24, 1983 and November 1, 1985. In order for us to complete our review, we require responses to the enclosed request for additional information.

Please review the enclosed request and provide responses no later than 30 days

! from the~ receipt of this letter.

! The reporting and/or recordkeeping requirements of this letter affect fewer

.than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

I Sincerely, Original cipedby Gerald E. Gears, Project Manager l BWR Project Directorate #2

[ Division of BWR Licensing

Enclosure:

As stated I

cc w/ enclosure:

See next page DBL:PD#2 PD#2 DBL:P 2

'SNo s D 3//7/86 L3 86 3 2'/86 0603280363 060326 27 DR ADOCK 050

o Mr. E. G. Bauer, Jr. Peach Bottom Atomic Power Station, Philadelphia Electric Company. Units 2 and 3 cc:

Mr. Eugene J. Bradley Mr. R. A. Heiss, Coordinator Assistant General Counsel Pennsylvania State Clearinghouse Philadel'hia p Electric Company Governor's Office of State Planning 2301 Market Street and Development Philadelphia, Pennsylvania 19101 P.O. Box 1323 Harrisburg, Pennsylvania 17120 Troy B. Conner, Jr. , Esq.

1747 Pennsylvania Avenue, N.W. , Mr. Thomas M. Gerusky, Director Washington, D.C. 20006 Bureau of Radiation Protection Pennsylvania Department of Thomas A. Deming, Esq. Environmental Resources Assistant Attorney General

~

P.O. Bo'x 2063 Department of Natural Resources Harrisburg, Pennsylvania 17120 Annapolis, Maryland 21401 ,

Mr. Albert R. Steel, Chairman Philadelphia Electric Company Board of Supervisors ATTN: Mr. R. Fleishmann Peach Bottom Township Peach Bottom Atomic R. D. #1 Power-Station Delta, Pennsylvania 17314 Delta, Pennsylvania 17314 Mr. M. J. Cooney, Superintendent Generation Division - Nuclear Philadelphia Electric Company 2301 Market Street Philadelphia, Pennsylvania 19101 Mr. Anthony J. Pietrofitta, General Manager Power Production Engineering Atlantic Electric P. O. Box 1500 1199 Black Horse Pike Pleasantville, New Jersey 08232 Resident Inscector U.S. Nuclear Regniatory Commission Peach Bottor-

  • a ac Power Station

~

P.O. Box 399 Delta, Pennsylvania 17314 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue-King of Prussia, Pennsylvania 19406 e

v- -

REQUEST FOR ADDITIONAL INFORMATION PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 DOCKET NOS. 50-277/278 FACILITY STAFF OVERTIME WORK LIMITS

1. Technical Specification (TS) Item 6.19.2 -

Please explain omission of the words "for refueling, major maintenance, or major unit modification, on a temporary basis" following the existing words " extended periods of shutdcwn." The omitted words are included in Generic Letter (GL) No. 82-12 and NUREG-0737, Item I.A.I.3.

2. TS Item 6.19.3 -

Please explain the following:

Use of the words " individual's employing officer, his designated alternate, a senior staff member" instead of " plant superintendent or his deputy, or higher levels of management" which are included in GL 82-12 and NUREG-0737, Item I.A.1.3. Specifically, ple0se explain what is meant by " employing officer."

Omission of the words used in GL 82-12 and NUREG-0737, Item I.A.1.3

" controls shall be included in the procedures such that individual overtime shall be reviewed monthly by the Plant Superintendent or his designee to assure that excessive hours have not been assigted" and replaced with "the employing officer or .his designee shall review, at an average of once a month, the number of deviations to assure that excessive deviations are not being authorized."

l l

1 I

i

.. - , . , - . - - - . - , , - . -. . . - - . . . - .-. .~

.- ,-