ML20154R198
| ML20154R198 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 05/25/1988 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20154R201 | List: |
| References | |
| NUDOCS 8806070233 | |
| Download: ML20154R198 (2) | |
See also: IR 05000348/1988015
Text
,,
.-
-
_-
.
-
.
. . . - g ,. .
.
g 2 5 BBB
.- ,
4
-Docket Nos. 50-348, 50-364
Alabama Power Company
ATTN:
Mr. R. P. Mcdonald
Senior Vice President
P. O. Box 2641
Birmingham, AL 35291-0400
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-348/88-15 AND 50-364/88-15
This refers to the Nuclear Regulatory Commission-(NRC) inspection conducted by
W. H..Bradford on' April 11 thru May.10, 1988. The inspection included a review
of activities authorized for your Farley facility. At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were identi-
fied.
Your attention is directed to the unresolved item identified in the inspection
report.
This matter will be pursued during future inspection.
In accordance with Section of the NRC's "Rules of Practice," Part 2, Title 10,
Code of Federal Regulations, a copy of this letter and its enclosures will be
placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
(See page 2)
8806070233 880525
t
ADOCK-05000348
Q
91
- . _ . _ . -, _ . ~ _ _ . _ _ . _ . - _ . _ , - - _ - _ _ _ _ _
. , _ . _ . _ _ _ _ - . . . . _ . _ _
. _.
.
..
.
-
-
-
.
.
-
- .
- .-
.-
.
. ' . '
,E
AIAY 2 51933
-i
'*
'
e
Alabama Power Company
2
Enclosure:
NRC Inspection Report
cc w/ enc 1:
B. M. Guthrie,-Executive Vice President
-
J. D. Woodard, General. Manager -
'
Nuclear Plant
W. G. Hairston, III, Vice President -
Nuclear Support
J. W. McGowan, Manager-Safety Audit
.ind Engineering Review
S. Fulmer, Supervisor-Safety
Audit and Engineering Review
'i
bec w/ enc 1:
NRC Resident Inspector
DRS Technical Assistant
E. Reeves, Project Manager, NRR
D cument Control Desk
State of Alabama
1
,
- !
RII
RII
M lbf
h9
LModeA s:ser
HDance
05/Li/88
05/f'/88
Z
,
l
L
L
- - . .
. -
. . .
. , . . , . , . , , , , , - - , . , . , , . , , . . - . , _ , - . - . , . , , . - .
,,,.-,n,--..-..,,-_.
, .,. _
n,,
. - . . - , , - ~ . , , . . . ,, - . . , . - . , -