Forwards Rev 0 to ASME Section XI Preservice Insp Plan. Plan Complete W/Exception of Any Addl Relief Requests Discovered During Performance of Insp Activity
ML20154Q733
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 06/02/1988
From: Counsil W, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20154Q737 List:
References
TXX-88464, NUDOCS 8806070107
Download: ML20154Q733 (2)


Text

_ - .

=lll" =llllll F9 Log # TXX-88464 File # 10010 Z 905.4 7UELECTR/C Ref. # 10CFR50.55a(g)

June 2, 1988 wmi..c.coumu Esenative Vwe Pressder,I V. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 PRESERVICE INSPECTION PLAN Gentlemen:

To meet the requirements of 10CFR50.55a(g), we have enclosed two (2) copies of the CPSES Unit 2 Preservice Inspection (PSI) Plan, Rev. O. A copy of the PSI Plan has also been sent to the Region IV office, CPSES NRR Resident inspector, Texas Department of Labor and Standards, and Hartford Steam Boiler.

The PSI Plan is complete with the exception of any additional relief requests discovered during the performance of the inspection activity.

Very truly yours, hb W. G. Counsil By:

D. R. Woodlan l Docket Licensing Manager i DAR/amb Enclosures c - Mr. R. D. Martin, Region IV Resident inspectors, CPSES (1) l Texas Department of Labor and Standards Boiler Division E. O. Thompson State Office Building i P. O. Box 12157, Capitol Station Austin, Texas 78701 h00l Attn: Steve Matthews Hartford Steam Boiler $

l 11104 West Airport Blvd., Suite 200 Stafford, Texas 77477 Attn: Tom Barbara 8806070107 880602 400 North Ohve Street LB8I Danas. Texas M01 PDR ADOCK 05000446

@ @CD

, ,e

"'1UELECTRIC OFFICEMEMORANDUM

... ,oj

,r . . ..

EPA- 880113 To: USNRC March 18, 1988 COMANCHE PEAK STEAM ELECTRIC STATION-UNIT 2 PRESERVICE INSPECTION PLAN MANUAL NO. 408 Comanche Peak Engineering (CPE) has assumed. the responsibility of controlled distribution of the Unit 2 Preservice Inspection Plan.

Attached please find your new Controlled Unit 2 Preservice Inspection Plan, Rev. O. Please destroy any previous drafts currently in your possession.

Please sign the acknowledgment below showing receipt of your Manual, and return to Susan Roberts, Engineering Correspondence Control (E06), by '

April 1, 1988.

wW L . G, Yeager SKR:sr Attachment cc: ARMS OL ACKNOWLEDCMENT UPDATED BY: MANUAL NO: DATE:

SIGNATURE: EXT:

t'

,.,--,-e% - . - - - - - -