Text
_
..
.
g
,
..
s
Ir, Reply Refer To:
MAY 2 6 W
Docket: 50-458/88-12
Gulf States Utilities
ATTN: Mr. James C. Deddens
Senior Vice President, (RBNG)
P. O. Box 220
St. Francisville, Louisiana 70775
Gentlemen:
l
'This refers to the inspection conducted by Messrs. W. B. Jones and G. L. Madsen
of this office dur'ag the period April 1-30, 1988, of activities authorized by
NRC Operating License NPF-47 for River Bend Station, and to the dircussion of
our findings with you and other members of your staff at the conclusion of the
inspection.
Areas examined during the inspection included review of licensee event reports,
10 CFR Par 21 reports, surveillance test observation, maintenance observation,
and operational safety verification. Within these areas, the inspection
consisted of selective examination of procedures and representative records,
interviews with personnel, and observations by the NRC inspectors. The
inspection findings are documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 2 of the enclosed rer' t.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Unsiaal Cisned By
i
L,a .c .
L. J. Callan, Director
Division of Reactor Projects
}
Enclosure:
(seenextpage)
fW
W _DRP/C @
DRP/C
P
RIV:DRP/R1
WBJones
GLMadsen
EHoller
Efaljen
f g /88
(/g/88
f/a788
7 /44/88
8806070030 880526
PD3
ADOCK 05000458
\\ \\
0
- _ _ _ _ _ _ - _ _ _ _ _ _
. , .
..
--
.f
Jy'
1
'
- ' i
,
,
,;
'
~ ~
.
.
' Gulf States Utilities
-2-
<
Enclosure:
Appendix - NRC Inspection Report-
50-458/88-12
.
cc w/ enclosure:
Gulf States. Utilities
ATTN:
J. E. Booker,
Manager, River Bend Oversight
P. O. Box 2951
Beaumont, Texas 77704
Gulf States UtilitiesL
ATTN: Les England, Director,
Nuclear Licensing - RBNG
P. O. Box 220
St. Francisville, Louisiana 70775
Louisiana State University,
Government Documents Department
i
Louisiana Radiation Control Program Director
bec to DMB (IE01)
bec distrib, by RIV:
- DRP
- Resident Inspector
,
R. D. Martin, RA
- SectionChief(DRP/C)
- Lisa Shea, RM/ALF
- MIS System
RPSB-DRSS
- RSTS Operator
- Project Engineer, DRP/C
- RIV: File
- W. Paulson, NRR Project Manager
- R. Hall
- DRS
- TSS
- w/766
,
-e-
y,
=w,-
-
1----ar--
i-rer2
-- , _.. -.-,-- . . -+_
w
.
-,