Forwards Insp Repts 50-327/88-09 & 50-328/88-09 on 880125- 0317 & Notice of Violation.Expresses Concern That Util Consider Acceptable to Improperly Store Documents Important to Safety for Periods in Excess of 6 Months
ML20154P987
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/17/1988
From: Barr K
NRC OFFICE OF SPECIAL PROJECTS
To: White S
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20154P990 List:
References
NUDOCS 8806060149
Download: ML20154P987 (3)


See also: IR 05000327/1988009

Text

-

_ - _ _ _ _

M M yttggg

.

.

Docket Nos. 50-327, 50-328

License Nos. OPR-77, DPR-79

- Tjnnessee Valley Authority

vATTN: Mr. S. A. White

Manager of Nuclear Power

6N 38A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-327/88-09 AND 50-328/88-09)

This refers to the Nuclear Regulatory Comission (NRC) inspection conducted by

J. J. Lenahan on January 25 - March 17, 1988.

The inspection included a review

of activities authorized for your Sequoyah facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

l

identified in the enclosed inspection report.

1

!

Areas examined during the inspection are identified in the report.

Within

I

these areas, the inspection consisted of selective examinations of procedures

I

and representative records, interviews with personnel, and observation of

'

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements.

The violations, references to pertinent requirements, and

elements to be included in your response are described in the enclosed Notice

of Violation.

Violation A involves installation of the improper type of

structural steel bolts during the seal table modification.

Violation B

involves storage of quality assurance records in a facility which does not

comply with the requirements of your QA program.

<

With respect to Violation B, we have concerns that members of your staff

consider it acceptable to improperly store documents important to safety for

periods in excess of six months, solely on the basis that a final approval

signature for those documents remain outstanding, and therefore, the documents

are not yet classified as "quality assurance records".

Th mere fact that the

final authorized signature had not been affixed to the wori plan cover sheet to

indicate completion of the total work plan, does not negate tne importance of

preservation of the individual documents (quality assurance records) within the

work plan packages.

Additionally, we have concerns that internal disagreements within your

organization have prevented timely resolution of this problem through your own

resources.

\\\\

8806060149 880517

PDR

ADOCK 05000327

g

DCD

ZEc/

_ _ _ _ _

MAY 171988

-

.

.,

.

,

.

Tennessee Valley Authority

2

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be placed in the NRC Public Document Room.

The responses directed by this letter and its enclosures are not subject to the

l

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, Pub. L. No.96-511.

Should you have any questions concerning this letter, please contact us.

La

IN

1

,o t qsh

(L%

bw

KennethP.Barr,Act]ing',ssistant

Director for Inspection Programs

TVA Projects Division

Office of Special Projects

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

cc w/encis:

  1. L. Abercrombie, Site Director

Sequoyah Nuclear Plant

(A.Kirkebo, Director,

Nuclear Engineering

  1. L. Gridley, Director

JuclearSafetyandLicensing

(M. R. Harding, Site Licensing

)lenager

TVA Representative, Rockville Office

M. R. Harding, Site Licensing

Manager

TVA Representative, Rockville Office

bec:

(See page 2)

f

!

____ ______ ___.

MAY 171ggg

.

.

_

Tennessee Valley Authority

3

bec w/encls:

J. N. Grace, RII

t&: D. Ebneter, OSP

W 0. Richardson, OSP

(W.G.Zech,OSP

D. Liaw, OSP

W

S. Little, OSP/RII

F. R. McCoy, OSP/RII

R. E. Carroll, OSP/RII

J. 8. Brady, OSP/RII

pV Rutberg, 0GC

NRC Resident Inspector

ORS Technical Assistant

NRC Document Control Desk

State of Tennessee

II ll

-

$

Ih

f

II

I

II

.7,y

,

,

JJLnahan:es

F ape

ARHerdt

GAB'elisle

FRMcCoy

f/f/88

f/9/88

f/v/88

f/ /88

37B/88

i

E)(C'%bl

Ht