ML20154P840

From kanterella
Jump to navigation Jump to search
Advises of Revised Date for Compliance to Notice of Violation Item B.Reinstruction of Engineering Personnel to Be Completed by 880718
ML20154P840
Person / Time
Site: Comanche Peak  
Issue date: 05/20/1988
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
TXX-88470, NUDOCS 8806060094
Download: ML20154P840 (1)


Text

____________ ____ -__.

~sa e

summmmmme

==

F7 Log # TXX-88470

=-

-]

File # 10130 IR 87-31 Ref. #

C 2 01

$$"$ dei, May 20, 1988 U. S. Nuclear Regulatory Comission Attn: Document Control Desk Washington, D.C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 REVISED DATE OF FULL COMPLIANCE FCR NOTICE OF VIOLATION (N0V)

ITEM B (445/8731-V-02; 446/8723-V-01)

REF:

TV Electric letter TXX-88324 from W. G. Counsil to NRC dated March 18, 1988 Gentlemen:

The referenced letter provided our revised date of compliance to Notice of Violation Item B (445/8731-V-02;446/8723-V-01).

In that letter we stated that reinstruction to NE0 3.06 of engineering personnel responsible for NCR dispositions, and that closure of DRs C-88-00040, C-88-00041, and P-88-00054 would be completed by May 20, 1988. The subject DRs have been closed.

Reinstruction of engineering personnel has not been completed. Our date for completion of the reinstruction of engineering personnel is hereby revised to be no later than July 18, 1988.

Very truly yours, KMnd W. G. Counsil RDD/grr c-Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3)

U

= =.

Q DCD

- - _ _ _ _ _