ML20154P840
| ML20154P840 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 05/20/1988 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| TXX-88470, NUDOCS 8806060094 | |
| Download: ML20154P840 (1) | |
Text
____________ ____ -__.
~sa e
summmmmme
==
F7 Log # TXX-88470
=-
-]
File # 10130 IR 87-31 Ref. #
C 2 01
$$"$ dei, May 20, 1988 U. S. Nuclear Regulatory Comission Attn: Document Control Desk Washington, D.C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 REVISED DATE OF FULL COMPLIANCE FCR NOTICE OF VIOLATION (N0V)
ITEM B (445/8731-V-02; 446/8723-V-01)
REF:
TV Electric letter TXX-88324 from W. G. Counsil to NRC dated March 18, 1988 Gentlemen:
The referenced letter provided our revised date of compliance to Notice of Violation Item B (445/8731-V-02;446/8723-V-01).
In that letter we stated that reinstruction to NE0 3.06 of engineering personnel responsible for NCR dispositions, and that closure of DRs C-88-00040, C-88-00041, and P-88-00054 would be completed by May 20, 1988. The subject DRs have been closed.
Reinstruction of engineering personnel has not been completed. Our date for completion of the reinstruction of engineering personnel is hereby revised to be no later than July 18, 1988.
Very truly yours, KMnd W. G. Counsil RDD/grr c-Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3)
U
= =.
Q DCD
- - _ _ _ _ _