ML20154P287

From kanterella
Jump to navigation Jump to search
NPDES Noncompliance Notification:On 880711,iron Exceeded 1 mg/1 Limit,Max Measured 2.8 mg/1.Caused by Consequence of Draining Sys 41.Sys 41 No Longer Being Drained.Procedures Will Be Reviewed to Determine Best Course of Action
ML20154P287
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 09/23/1988
From: Fuller C
PUBLIC SERVICE CO. OF COLORADO
To:
Office of Nuclear Reactor Regulation
References
P-88352, NUDOCS 8810030008
Download: ML20154P287 (2)


Text

>_

OsPublic Service ~ rei. .-..

Cosnpany of Colorado 16805 WCR 19 1/2, Platteville, Colorado 80651 September 23, 1988 Fort St. Vrain Unit No. 1 P-SS352 Director, Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Docket No. 50-267

SUBJECT:

NONCOMPLIANCE REPORT PER NPDES PERMIT Dear Sir.

In accordance with Appendix E to the Fort St. Vrain Technical Specifications, Section 3.2(a), Public Service Company is herein tubmitting a copy of the Discharge Noncompliance Report required by our NPDES Permit.

If you have any questions with regards to this report, please contact Mr. M. H. Holmes at (303) 460-6960 ncerely bu awA-C. H. Fuller Manager, Nuclear Production Enclosure CHF/JMS/bjr cc: Regional Administrator, Region IV ATTN: Mr. T. F. Wester-an, Chief Projects Section B Mr. Robert Farrell Senior Resicent Inspector, FSV Cco '

es10030003 ss0923 (

F;DR ADOCKOSOog67 d

j /~N Publia FORT ST. VRAIN NUCLEAR GENERATING STATION

. b3 rvlaco PUBUC SERVICE COMPANY OF COLORADO NPDE5 DISCHARGE PERMIT NONCOMPLIANCE REPORTING FORM Date: July 15, 1988 ~

Applicable Permit No. C0-0001121 01scharge No. O1B

!. GENERAL A. Comptny: PUBLIC SERVICE COMPANY OF COLORADO Mailing Address: 16805 Weld County Road 19 1/2 Plant Name: Fort St. Vrain Plant Location: Platteville, Colorado County Weld II. Noncompliance Report A. Description and Cause of Noncompliance:

Iron exceeded the limit of 1.0 mg/1. The maximum measured was 2.8 mg/1. Violation appears to be a consequence of draining system 41 (cooliq; tcwer) after the station was shut down for several weeks of maintenance.

8. Noncompliance Period:

Started: 0230 A.M. P.M. 7/11/88 DATE Ended: 0230 A.M. P.M. 7/12/88 OATE Estimate of Return to Compliance: N/A C., Action Taken to Rsduce, Eliminate, Prevent:

System 41 is no longer being drained. Procedures will be reviewed to determine best course of action for prevention.

D. Person Initiating Report Henry E. Adamski Signature: s/ Henry E. Adamski Signature of Plant Manager: s/C. H. Fuller Person Authorized to File Report With Regulatory Agencies: Pete Cohlmia/ George Vanesh/ Bob.Pearson E. Water Quality Control Division Notification Requirements:

(WQCD)

Telephone (24 hrs.) y n ufeo Date naMere rwetPerson Notified Written (5 days) 7/20aa Date cist, u_mv_fren Copy: Pete Cohlmia, Belleview S.C./ Bob Pea'rson/ George Vonesh, Room 946 HQB Plant file SUBMIT REPORT TO:

Ms Sandy Marek Regional Administrator Colorado Department of Health U.S. Environmental Protection Agency Water Quality Control Division One Denver Place - Suite iS00 Monitoring & Enforcement Section 999 18th Street shM-c 4210 East lith Avenue Denver, Colorado 80202-2413 Denver, Colorado 80220 Attn: Enforcement - Permit Program i

FSV-234-A FCAWlo)372 22 3H3 y .n. . - - . . . . - - .. .