ML20154N758
| ML20154N758 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 09/21/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20154N763 | List: |
| References | |
| NUDOCS 8809290394 | |
| Download: ML20154N758 (2) | |
See also: IR 05000498/1988051
Text
_ _ _ _ - - - - - - - - _ - - - - - - - - - .
_- _ -
,
{
.
.
SEP 21193
.
-
-
In Reply Refer To:
Dockets: 50-498/88-51
50-499/88-51
I
,
Houston Lighting & Power Company
ATTN:
J. H. Goldberg, Group Vice
President, Nuclear
P.O. Box 1700
Houston, Texas 77001
Gentlemen:
This refers to the inspection conducted by Messrs. R. B. Vickrey and
P. C. Wagner of this office during the period July 25-29, August 8-12, and
August 29 through September 1,1988, of activities authorized by NRC Operating
License NPF-76 and Construction Permit CPPR-129 for the South Texas Project,
Units 1 and 2 and to the discussion of our findings with Mr. J. T. Westermeier
and other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included records review, procedures review,
instrumentation components and systems, work observations, as-built
verification, and heat shrinkable tubing. Within these areas, the inspection
consisted of selective examination of procedures and representative records,
interviews with personnel, and observations by the NRC inspectors. The
inspection findings are documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely.
Origlaal Signed By
L J. Callan
L. J. Callan, Director
Division of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
50-498/88-51
50-499/88-51
cc w/ enclosure:
(seenextpage)
- RIV:RI
- C:0PS
- RI
- C:PSS
- D:DRS
D:
P,
RBVickrey/tw
JEGag11ardo
PCWagner
TFStetka
JLMilhoan
LJCallan
/ /88
/ /88
/ /88
/ /88
/ /88
/2f/88
- Previously concurred
8809290394 880921
ADOCK 05000498
l {
0
PNV
- - _ _ _ _
__
____ - _ __
_ _ _ _ - _ _ _ _ _ _ _ _ _ . _
_ - .
_ _ _ _
. _ _ _
.
.
1
.
.
.
Houston Lighting & Power Company
-2-
,
cc w/ enclosure:
y
Houston Lighting & Power Company
Newman & Holtzinger, P.C.
ATTN:
M. A. McBurnett, Manager
ATTN:
J. R. Newman, Esquire
t
Operations Support Licensing
161S L Street, N.W.
P.O. Box 289
Washington, D.C.
20036
l
Wadsworth, Texas 77483
Houston Lighting & Power Company
Houston Lighting & Power Company
i
ATTN:
Gerald E. Vaughn, Vice President
ATTN:
S. L. Rosen
l
Nuclear Operations
P.O. Box 289
!
P.O. Box 289
Wadsworti Texas 77483
!
Wadsworth, Texas 77483
j
Houston Lighting & Power Company
Houston Lighting & Power Company
i
ATTN:
J. T. Westenneier, General Manager
ATTN:
R. W. Chewning, Chairman
l
South Texas Project
Nuclear Safety Review Board
-
P.O. Box 289
P.O. Box 289
[
Wadsworth, Texas 77483
Wadsworth. Texas 77483
[
!
Central Power & Light Company
City Public Service Board
'
ATTN:
R. L. Range /R. P. Varret
AT1N:
R. J. Costello/M. T. Hardt
P.O. Box 2121
P.O. Box 1771
i
Corpus Christi, Texas 78403
San Antonio, Texas- 78296
(
City of Austin Electric Utility
Houston Lighting & Power Company
!
ATTN:
R. J. Miner, Chief Operating
ATTN:
Licensing Representative
Officer
Suite 610
{
721 Barton Springs Road
Three Metro Center
Bethesda, Maryland 20814
t
Texas Radiation Control Program Director
!
bec to DMB (IE01)
$
bec distrib by RIV:
I
- DRP
- RRI-OPS
f
- R. D. Martin, RA
- DRS
- SectionChief(DRP/D)
- RPB-DRSS
j
- MIS System
- RIV File
Lisa Shea, RM/ALF
- RSTS Operator
i
!
R. Bachmann OGC
I
- G. Dick, NRR Project Manager
- Project Engineer, DRP/D
- RRI-CONST
- R. B. Vickrey
l
- P. C. Wagner
- J. E. Gagliardo
l
- T. F. Stetka
[
!
- w/766
!
!
!
!
!
'
-
.
-
-
- -
-
--