ML20154N041
| ML20154N041 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 09/20/1988 |
| From: | Tucker H DUKE POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8809290172 | |
| Download: ML20154N041 (4) | |
Text
Il I
1%ke herr Company Ha B h an l
PO Bcx 33193 nce hesiJett l
' Charlotte, N C 2A242 Nuclear hvJuctin (704A1?]-1111 DUKE POWER Septerter 20, 1988 i
U.S. Nuclear Degulatory Otminission l
Attention: DooJmsnt Control Desk l
Mashington, D. C.
20555 subject: Catawba Nuclear Station, thits 1 and 2 Docket Nos. 50-413 and 50-414 Priority Listing of Operating License Muen&ments Attached is a listing of pig :1 Operating License and Technical Specificaticm amen &nents Weh should be given a priority status over all other gvge.d anen&nents. Na priority listing contains a brief description of the requested anen&nent, the subnittal date, the date of any followup correspondance, a required issuance date, and the reascn for ti.3 required issuance date. The amen &ents are not listed in any particular order and should be pursued based upon '.he required issuanos date.
This listing is intended as guidance to be used in allocating resources for the review and issuance of pr h ammaments. This list is not interded to w
l preclude the pursuit of other Operating License or Techrtical specification anentnents which may need to be given a higher priority. This list will be updated periodically, as naadai.
I If p2 have any questions or otmaants concerning this list or any anendments adiressai herein, please advise.
l l
l Very Truly Yours, p,
,a W. l AMU Hal B. Ecker PG/N40/NENDS.PGL Attactinent NYDO
[
- \\
P l
l m
l U.S. Nuclear Regulatory Otusnission j
Septanter 20, 1988 l
Page m xc: Dr. J. Nelson Grace, Regicmal A&ninistrator U. S. Nuclear Regulatory Otmenission Regicn II 101 m rietta Street, NW, Suite 2900 Atlanta, m 30323 Mr. Heyward !ticaly, Chief Bureas of Radiological Health South Carolina Department of Health &
l l
Environmar.tal control 260' Bull Street I
J 031unbia, South Carolina 29201 i
l American Nuclear Insurers c/o Dottie Sherman, ANI Library I
'!he Exchange, atite 245 270 Farmington Avenue Farmington, CT 06032 i
M&M Nuclear Consultants 1221 Avenue of the Americas I
New York, N.Y.
10020 l
INFO Records Center Suite 1500 1100 circle 75 Parkway
[
Atlanta, a 30339 l
t Mr. W. T. Orders NRC Resident Inspector l
Catawba Nuclear Station l
l t
6 l
- PCg3 NJ.
1 01/01/80 Attcchm:nt 1 Duke Power Company Catawba Nuclear Station Priority Operating License Amendments Daccription Submittal Required Need For Date(s)
Issuance Issuance Date
=====.......................
Approval of use of Direct 02/24/88 11/01/88 Needed to support Cinoration Response Spectra 07/05/88 modification of RHR fer Snubber reduction.
09/16/88 system prior to refueling outage that starts 11/23/88 Carrcctions to the ESFAS Table 05/27/88 11/15/88 These changes are and specification concerning 07/28/88 needed to more tho containment Pressure accurately reflect Centrol System.
the as-built plant.
Corrections to Table 3.3-10 7/11/88 11/15/88 This change is concerning Accident Monitoring followup to Instrumentation, emergency change on June 1, 1988 PAM table.
Num rous changes to the 08/16/87 11/15/88 This amendment is Nucloar Service Water System 07/12/88 needed to more j
T ch Specs. Reference LER accurately reflect 414/86-31, IE Report 413/86-30 the Nuclear Service Enf. Conf. held on 2-23-88 Water System design.
l Fivo changes to the Snubber 12/15/87 11/23/88 The two changes T;ch Spec (two of which have 04/15/88 noticed (at least) b On noticed in Federal are needed to R:gister) support the next refueling outage.
Extcnsion of time to resolve 8/15/88 12/01/88 The next refueling Cold Leg Accumulator discharge outage for Unit 1 instrumentation (reference currently is Lic nse Conditions U1-12(a) scheduled to start U2-8 (a) ).
Nov. 21, 1988 Corrcetions to specification 07/26/88 01/01/89 These changes are 3.7.6 concerning two unit needed to more operction of the Control Room accurately reflect V:ntilation System. Reference the as-built plant.
Chonges to surveillance 02/15/88 01/01/89 Changes are needed requirements for Auxiliary
'10/01/88 to avoid disabling Fccdrater system for position CA syctem too of valves.
frequently.
l 1
l
- P;g7 No.
2 G1/01/80 Attcchm:nt 1 Duke Power Company Catawba Nuclear Station Priority Operating License Amendments Doccription Submittal Required Need For Date (s)
Isst'nce Issuance Date
==
........................v.
Dolotion of several CA and
'10/14/88 01/01/89 Needed to reflect CF valves from Table 3.6-2.
valves which need i
not be included In Table 3.6-2 Chcnges to Table 3.3-3 to 08/09/88 01/02/89 This change is codify the Nuclear Service
~10/01/88 needed to modify the Watcr System swapover logic.
RN System to add a third instrument
- channel,
(
Grant exemption for complete
~10/09/88 02/01/89 Eliminates D/G overhaul to resero number unnecessary testing of failures resulting from of D/G 1A.
This fculty prassure sensors, would reduce wear and tear on D/G.
D31otion of inspection of 05/24/88 03/02/89 The next inspection Unit 2 Diesel Generator 97 would have to be booring (reference license done at Unit 2 condition (11), Attachment 1, outuge scheduled for
(
it03 6)
March 3, 1989.
j
?
Unit 2 D-5 Steam Generator 09/19/88 03/02/89 The modification to levol tap relocation.
the S/G taps is scheduled for the Unit 2 outage starting 3-2-89 j
Extension of time to implement 09/14/88 03/02/89 The Unit 2 next upgrade to Unit 2 SPDS.
refuleing cutage
'roference License Condition currently is 8(b))
scheduled to start March 3, 1989.
l