ML20154M796
| ML20154M796 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 03/10/1986 |
| From: | Zwolinski J Office of Nuclear Reactor Regulation |
| To: | Taylor J DAIRYLAND POWER COOPERATIVE |
| Shared Package | |
| ML20154M800 | List: |
| References | |
| TAC-56955, NUDOCS 8603140487 | |
| Download: ML20154M796 (3) | |
See also: IR 05000409/1984009
Text
- ---_-- _ ----
March 10, 196
.,
.
Docket No.: 50-409
Mr. James W. Tavlor
General Manager'
'
Dairyland Power Cooperative
2615 East Avenue South
La Crosse, Wisconsin E4601
Dear Mr. Taylor:
SUBJECT: SHUTDOWN CONDENSER SAMPLE LINE (TAC 56955)
Re:
La Crosse Roiling Water Reactor (LACBWR)
During the review of containment isolation provisions at LACRWR, a concern
was identified regarding the shutdown condenser sample line. This issue is
described in Inspection Report 84-09, dated October 5, 1984 (item 409/84-09-17).
By letter dated February 8,1985, you proposed to install two checn valves in
series in this line to improve the capability to isolate the containment atmosphere
from the environment. As discussed in the enciesed safety evaluation, the
staff concludes that the planned modification will provide acceptable
isolation capability for the shutdown condenser sample line.
Sincerely,
9rAsiana sisped by
John A. Zwolinski, Director
BWR Pro.iect Directorate #1
Division of RWR Licensing
Enclosure:
Safety Evaluation
cc: See Next Page
DISTRIBUTION
MDocket File i
Local PDR
JStano
NRC PDR
JPartlow
FMiraglia
PD#1 Readina
EMcKenna
ISAP Reading
PAnderson
8603140487 860310
BRernero
CJamerson
AN O
{M
OELD
ACRS (10)
EJordan
JZwolinski
RGrimes
CGrimes
- SEE PREVIOUS CONCURRENCE
GHolahan
P # kWR
PD#1:BWR
- ISAP:PWR-B
- ISAP:PWR-B
i
JZwolinski
EMcKenna:lt
CGrimbs
J
Ag
. . . 03/Q4M6
03P 7/86
03/P /86
_
- - - _ - - - _ - - - - - - - - _ - - . - _ - - _ _ . - - - - - - _
.
'
,
Docket No.: 50-409
{
Mr. James W. Taylor
"
General Manager
Dairyland Power Cooperative
2615 East Avenue South
La Crosse, Wisconsin 54601
Dear Mr. Taylor:
SUBJECT: LACROSSE BOILING WATER REACTOR (LACBWR) -
SHUTDOWN CONDENSER SAMPLE LINE
During the review of containment isolation pro sions at LACBWR, a concern
was identified regarding the shutdown condenser
mple line, this issue is
described in Inspection Report 84-09, dated 0 ober 5, 1984 (item 409/84-09-17).
By letter dated February 8, 1985, you prop ed to install two check valves in
series in this line to improve the capa lity to isolate the containment atmosphere
from the environment. As discussed i
the enclosed safetiy evaluation report,
the staff concludes that the plan d modification will provide acceptable
isolation capability for the s tdown condenser sample line.
John A. Zwolinski, Director
BWR Project Directorate #1
Division of BWR Licensing
Enclosure:
As Stated
cc: See Nex
age
DISTRIBUTION
Docket File
Local PDR
JStang
NRC PDR
JPartlow
FMiraglia
PD#1 Reading
EMcKenna
ISAP Reading
PAnderson
BBernero
CJamerson
OELD
ACRS (10)
EJordan
JZwolinski
BGrimes
CGrimes
I
4
ISAP:PWR-
PD#1:BWR
PD#1:BWR
EMcKenna:lt
CGrimes
JStang
JZwolinski
03/y/86
03/4/86
03/ /86
03/ /86
.
-
.
.
Mr. James W. Taylor
Dairyland Power Cooperative
La Crosse Boil'ing Water Reactor
cc:
Frit? Schubert, Esquire
Clarence Riederer, Chief Engineer
Staff Attorney
Wisconsin Public Service
Dairyland Power Cooperative
Commission
2615 East Avenue South
Post Office Box 7854
La Crosse, Wisconsin 54601
Madison, Wisconsin 53707
0. S. Heistand, Jr., Esquire
1800 M Street, N.W.
Washington, D.C.
20036
Mr. John Parkyn, Plant Manager
La Crosse Boiling Water Reactor
Dairyland Power Cooperative
P. O. Box 275
-
Genoa, Wisconsin 54632
.
U.S. Nuclear Regulatory Commission
Resident Inspectors Office
Rural Route #1, Box 276
Genoa, Wisconsin 54632
Town Chairman
Town of Genoa
Route 1
Genoa, Wisconsin 54632
Chairman, Public Service Commission
of Wisconsin
Hill Farus State Office Building
Madison, Wisconsin 53702
Regional Administrator, Region III
U.S. Nuclear Regulatory Commission
799 Roosevelt Road
Glen Ellyn, Illinois 60137
.
l
l
'
r
i
L