Forwards SER Re Util 831108 & 850625 Responses to Generic Ltr 83-28,Items 4.2.1 & 4.2.2,respectively Re Maint & Surveillance Program for Reactor Trip Breakers.Response Acceptable If Listed Conditions Met
ML20154M755
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/07/1986
From: Thadani A
Office of Nuclear Reactor Regulation
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20154M758 List:
References
GL-83-28, TAC-53133, NUDOCS 8603140461
Download: ML20154M755 (2)


Text

_ _ _ _.

l March 7, 1986 Docket No. 50-336 DISTRIBUTION:

6 ACRS (10)

NRC POR Local PDR I

PDf8 Rdg.

Mr. John F. Opeka, Senior Vice President ACThadani Nuclear Engineering and Operations OELD Northeast Nuclear Energy Company EJordan P. O. Box 270 BGrimes Hartford, Connecticut 06141-0270 JPartlow D0sborne l

Dear Mr. Opeka:

PMKreutzer

SUBJECT:

PREVENTIVE MAINTENANCE AND SURVEILLANCE PROGRAM FOR REACTOR l

TRIP BREAKERS FOR MILLSTONE-2 (ITEMS 4.2.1 AND 4.2.2 0F GENERIC LETTER 83-28)

I By letters dated November 8, 1983 and June 25, 1985 you provided responses to Items 4.2.1 and 4.2.2 of Generic Letter 83-28 concerning your preventive l

maintenance and surveillance programs for reactor trip breakers at Millstone Unit 2.

We find your programs acceptable provided that the following l

conditions are met.

1.

Measurement of the UVT device roller rivet armature clearance is done with the UVT armature in the energized position.

2.

Inspection and adjustment of the trip latch engagement is performed in accordance with the applicable GE instruction l

manual.

t We request that you confirm within 30 days that the above conditions will i

be met, i

Enclosed is our Safety Evaluation which used technical input from Idaho l

National Engineering Laboratory.

Sincerely, l

i l

Ashok C. Thadani, Project Director Division of PWR Licensing-B

Enclosure:

f As stated i

cc:

See next page l

I

~

l PD#8-POO:

PD#8:

PMgrkutzer 00Mrne:dd ACThadani jf/y786 p /86

,3/ /86 l

lM MA 8488l'g*

Mr. John F. Opeka Millstone Nuclear Power Station l

Northeast Nuclear Energy Company Unit No. 2 cc:

Gerald Garfield, Esq.

Mr. Wayne D. Romberg l

Day, Berry & Howard Superintendent l

Counselors at Law Millstone Nuclear Power Station City Place P. O. Box 128 I

Hartford, Connecticut 06103-3499 Waterford, Connecticut 06385 Regional Administrator, Region I Mr. Edward J. Mroczka U.S. Nuclear Regulatory Commission Vice President, Nuclear Operations Office of Executive Director for Northeast Nuclear Energy Company Operations P. O. Box 270 631 Park Avenue Hartford, Connecticut 06141-0270 King of Prussia, Pennsylvania 19406 Mr. Charles Brinkman, Manager Washington Nuclear Operations C-E Power Systems Combustion Engineering, Inc.

7910 Woodmont Avenue Bethesda, Maryland 20814 l

Mr. Lawrence Bettencourt, First Selectman Town of Waterford Hall of Records - 200 Boston Post Road Waterford, Connecticut 06385 Northeast Utilities Service Company ATTN: Mr. Richard R. Laudenat Manager I

GenerationFacilitiesLIcensing Post Office Box 270 Hartford, Connecticut 06141-0270 Kevin McCarthy, Director Radiation Control Unit Department of Envitonmental Protection State Office Building Hartford, Connecticut 06106 Mr. John Shediosky/ Millstone Resident Inspector l

Box 811 Niantic, Connecticut 06357 Office of Policy & Management ATTN:

Under Secretary Energy Division 80 Washington Street Hartford, Connecticut 06106 l

l

-