ML20154M648

From kanterella
Jump to navigation Jump to search
Forwards Summary of FSAR Amend 71 Detailed Description.Amend Provides Updates,Revs,Additions,Clarifications & Editorial Changes
ML20154M648
Person / Time
Site: Comanche Peak  
Issue date: 05/27/1988
From: Beck J
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
TXX-88445, NUDOCS 8806020029
Download: ML20154M648 (25)


Text

"

l

]

==

Log # TXX-88445 7

File # 10010 2.

=

Ref.#10CFR50.34(b) 4 IUELECTRIC

[$ iC%,"di, May 27, 1988 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 FSAR AMENDMENT 71 DESCRIPTION Gentlemen:

Amendment 71 of the CPSES FSAR was transmitted to you under a separate cover letter, TXX-88446, dated May 27, 1988.

Amendment 71 provides updates, revisions, additions, clarifications and editorial changes.

The following is a summary of the detailed description of this amendment:

1) Adds the "CPSES recreational facility" to Section 2.1.2.2, Control of Plant Activities Unrelated to Plant Operation.

~

3 2)

Identifies ANSI /ANS Standard 58.2 Working Draft 7, dated August 1987, as 4

j the basis for jet impingement analyses.

3)

Includes the feedwater split flow bypass valves as active valves to assure operability during applicable plant conditions.

(AFWinitiation)

4) Clarifies the use of Fire Hazards Analysis Evaluations.

5) includes exceptions to BTP APCSB 9.5-1, Appendix A not previously noted in the FSAR.

6)

Replaces feedwater line thermocouples located outside Containment with resistance temperature detectors, i

7) Corrects locetion of perimeter patrol road and adds discussion of 1

alternate access point.

8) Clarifies that Brown & Root provides the Viality Assurance Program for ASME Section 111 code work only.

l

9) Corrects the Regulatory Guides referenced in Section 17.2 to reflect the requirements applicable to plant operation, i
10) Revises text to reflect consolidation of various QA documents in the QA Manual and updates Chapter 17 descriptions.

)g

\\

9806020029 680527

  • h" "" 5 "'

N""

I' M

1 PDR ADOCK 05000445 t

iP DCD A

7 Tix-88445

, May 27, 19d8 Page 2 of 2 j

A page-by-page description of the changes is attached.

The number in j

parenthesis following each de3cription (e.g., (88-369)) is the identification number for the FSAR Change Request (if any) that was used to process that portion of this amendment.

The group number after each FSAR Change Request identification number assigns a level of significance (Group 1 being the most significant) for each change made to the FSAR.

Pages which do not have changes but are included in the amendment (either because they are on the opposite side of the sheet from a page that was changed or because a change shifted the existing material to another page) are not discussed in the attachment.

Very truly yours, l

W. G. Counsil By b d. b J@n W. Beck Vice President, Nuclear Engineering JOS/amb Attachment c - Mr. R. D. Martin, Region IV Resident inspectors, CPSES (3) s

)

i

Attachment to TXX-884.45

~

Hay 27, 19,88

~

Pagi 1 of 23 CPSES FSAR AMENDMENT 71 L

DETAILED DESCRIPTION i

FSAR Page (as amended)

Description 2.1-7 Update:

Adds the "CPSES recreational facility" to 4

Section 2.1.2.2, Control of Activities Unrelated to Plant Operation.

This Facilit recreational activities y will be used for public within the Exclusion Area l

Boundary.

1 (88-333) Group 3.

3.68-29 Clarification:

In order to be consistent with the terminology utilized in subsequent sections, the steady state thrust coefficient previously shown as Kt IS identified as C -

t (88-438.4) Group 4 3.6B-30 Clarification:

The full name of the post processor program to RELAP, CALPLOTF-III, is provided.

(88-438.4) Group 4 l

Revision: Deletes reference to Moody's critical flow model.

This flow model was used in earlier versions of j

the RELAP program however an improved model was incorporated in RELAP-5.

(88-438.3) Group 3 3.68-31 Revision: Deletes path inertias as an initial input 1

condition.

Refinements in RELAP-5 over earlier RELAP versions have eliminated the need to include path inertias as initial inputs.

(88-438.3) Group 3 Clarification:

To be consistent with the proceding i

sentence the singular nouns and pronouns are made plural to indicate that all three programs are included in the i

description.

)

(88-438.4) Group 4 2

Clarification:

References acoustic disturbance flow i

phenomena as an additional factor in the determination of forces from fluid jet thrust at the break location.

1 (88-438.4) Group 4 1

Clarification:

Rewords sentence discussing how piping restraints are modeled to clarify that an initial gap is i

i utilized in all three computer codes.

]

(88-438.4) Group 4 i

1 4

j l

~'

Attachment to TXX-88445 May,27, 19,88 j

Page 2 of 23 t

o

  • FSAR Page (as amended)

Description i

3.68-32 Clarification: _ Rewords sentence discussing step-by-step integration to clarify that all three computer programs utilize the integration method.

l (88-438.4) Group 4 Revision: Deletes reference to Neur. ark's method for the evaluation of the incremental equation of motion.

The i

SHPLAST and ABAQVS programs use different methods.

(88-438.3) Group 3 3.68-33 thru Revision: Describes the new methodology used to 3.6B-44 determine jet impingement loads.

The basis of this methodology is American National Standard ANS!/ANS 58.2 "Design Basis for Protection of Light Water Nuclear Power t

Plants Against Effects of Pipe Rupture", (Working Draft Rev.7,1987).

The primary differences between this method and the previous method are in; 1) the utilization

.i of the multidimensional flow analysis methodology i

demonstrated in NVREG/CR-2913 (an alternate methodology endorsed by ANSI /ANS 58.2) and the primary methodology described in ANSI /ANS 58.2, and 2) the jet expansion geometry and jet attenuation used for the above models i

(and consequently the number of targets within the jet zoneofinfluence).

The previous FSAR method assumed that steam and flashing 1

I water jets were unattenuated. ANSI 58.2 allows the l

utilization of the multidimensional flow analysis demonstrated in NUREG/CR-2913 for the detennination of e

j jet forces from high energy steam and two phase jets i

j (i.e., jets with initial fluid conditions of 870 psia to l

2466 psia and with subcooling of 0 degrees F to 126 degrees F).

This multidimensional analysis considers the l

supersonic velocities downstream of the break and the t

ensuing shock wave in the determination of the pressure field and lead on the target.

The multidimensional analysis more realistically evaluates the thennodynamic j

properties of these jets and yields significant jet load

,i attenuation downstream of the shock wave.

Thus for high i

]

energy steam and two phase jets analyzed using the NUREG 2913 methodolooy, the effective target distance is taken as ten times the inside diameter of the ruptured pipe.

This effective target distance is based on data from the extensive testing performed at Sandia f.aboratories which l

are provided in the NUREG.

l Also based on NUREG data, the jet is assumed to expand radially at a 45 degree angle. Within the effective target distance, the zone of influence of the 45 degree expansion jet envelopes the zone of influence of the previously used 10 degree half angle expansion model, j

i

\\

i J

8

'At'tachment to TXX-88445 May 27,1988 Page 3 of 23-

'FSAR Page (as amended)

Description 3.68-33 thru For all other high energy line breaks (steam and 3.68-44 two phase jets which do not-meet the pressure and l

subcooling requirements discussed above, and water jets)_,

the jet loads are calculated using the primary methodology described in ANSI /ANS 58.2 Working Oraft 7.

As in the previous FSAR model, these jets are assumed to travel unattenuated until impact with a target or

barrier, f

I For steam and two phase flow (flashing water). the previous model assumed a single region.with a uniform jet i

expansion at a half-and e not exceeding 10 degrees.

The ANS!/ANS 58.2 method r n. ides for a more realistic three region expansion modo 3 can be seen from Figures 1

3.68-96A and 3.68-961, te zone of influence of the three region model e N A pes the zone of influence of the previous single region model.

In the regions of the Nghest jet loads (Lc and la) the three region model

[

has a larger zone of influence (and thus encompasses more -

targets) than the single region model.

For wam jets, the previous model assursed a cylindrical non-e s@ng i

jet with a cylinder diameter equal to the diam W

'f the ruptured pipe.

The ANSI /ANS 58.2 model also assu,o a cylindrical non-expanding jet with a cylinder diameter I

equal to the diameter of the rupture pipe. However, CPSES conservatively assumes a cylindrical non-expanding i

jet mdel equal to twice the diameter of the ruptured pipe.

Therefore, the CPSES model has a larger zone of influence and thus encompasses more targets.

L The material revised in this FSAR section was 3reviously i

reviewed (thru Amendment 45) and accepted by tie NRC in SSER 6.

(88-438.1) Group 1 3.68-79 Revision: References ANSI /ANS 58.2 Working Draft Rev.7, August 1987 as the version utilized in the determination

-l of jet impingement loads.

Also see description at 3.68-33 thru 3.68-44.

(88-438.3) Group 3 I

Addition:

Provides reference to NUREG/CR-2913 which is utilized to calculate two-phase jet loads. Also se description at 3.68-33 thru 3.68-44.

(88-438.3) Group 3 i

Addition:

Provides reference to Biggs handbook for Structural Design for Structural Loads which is utilized l

in the determination of Dynamic Load Factors.

l (88-438.3) Group 3 i

5

7 At'tachment.to TXX-884'45 May 27, 1988 o

Page 4 of 23

'FSAR Page (as amended)

Description Figure 3.68-96A Addition:

Provides a new figure to illustrate the three

. region jet cone model for determination of jet impingement affects of a circumferential break with full separation.

This figure is used in conjunction with the ANSI /ANS 58.2 primary methodology.

Also see description-at 3.68-33 thru 3.6B-44.

(88-438.3) Group 3 Figure 3.68-968 Addition: -Provides a new figure to illustrate the three region jet cone model for determination of jet impingement affects of a longitudinal break. This figure is used in conjunction with the ANSI /ANS 58.2 prime.ry methodology.

See description at 3.68-33 thru 3.68-44.

(88-438.3) Group 3 Figure 3.6B-96C Addition:

Provides a new figure to illustrate the jet cone geometry for a ;ircumferential break with full separation.

This figure is used in conjunction with the ANSI /ANS 58.2 primary methodology. Also see description at 3.68-33 thru 3.68-44.

(88-438.3) Group 3 Figure 3.6B-96D Addition:

Provides a new figure which can be utilized to relate stagnation subcooling at the break plane to stagnation conditions in the vessel supplying the jet flow, accounting for irreversible losses in the blowdown line.

This figs re _is used in conjunction with the ANSI /ANS 58.2 primary methodology.

(88-438.2) Group 2 Figure 3.6B-96E Addition: Provides a new figure which can be utilized to calculate the Asymptotic Area Ratio which may be used in place of FSAR Section 3.68.2,3.2 equation (3).

This figure is used in conjunction with the ANSI /ANS 58.2 primary methodology.

(88-438.2) Grcup 2 3.9B-27 Clarification:

Reflects the reformatting of Table 3.98-8.

Table n: longer list inactive pumps and valves. (88-278) Group 4 3.9B-28 Clarification:

Identifies the appropriate Table, 3.9B-10, which lists active valves for Code Class 2 and 3.

This change reflects the reformatting of Table 3.98-8.

(88-278) Group 4 i

II

Attachmentito TXX-88445 May 27, 1988 Page 5 of 23

'FSAR Page (as amended)

Description 3.98-47 Editorial:

Deletes this page in its entirety.

This page was a partial list of references which were inadvertently duplicated from page 3.9B-46. All references are listed on page 3.9B-46.

(88-306) Group 4 Table 3.98-8 Clarification:

The table has been reformatted to_only list active pumps.

Information deleted from the table pertains to active valves, inactive pumps and valves.

The revised table provides the pump tag number, system designation, ASME code class, nonnal and accident mode and the pump's active function. The revision of the table is an improvement since more useful information is now contained by the table.

Listing of active valves is provided by Table 3.9B-10 and also provides corresponding detailed information similar to the new active pump table.

(88-151) Group 4 Table 3.98-10 Editorial: Corrects typographical error for three Sheet 5 valves prefix from "HV" to "FV".

(88-222.2) Group 4 Table 3.9B-10 Addition: Adds four valves to active valve list.

Sheet 6 The four valves are feedwater air operated butterfly valves.

The four Feedwater Bypass Valves (FSBVs) are added to the active valve list to reflect a commitment to qualify these valves to assure that they will close for the feedline break discussed in FSAR Section 15.2.8.

(88-222.1) Group 1 Figure 5.1-1 Editorial:

Deletes a sheet which provided notes to this (Notes) figure.

The notes required for this figure have been incorporated as part of the figure.

The deletion of this sheet was inadvertently not included in Amendment 66.

(88-289) Group 4 6.2-54 Correction:

Corrects a typographical error for the size of the steam line break split rupture at 70 percent power, from 6.0908-ft2 2

to 0.908-ft, to make it consistent with the value specified in Table 6.2.1-4 and Figures 6.2.1-15 thru -17.

This typographical error was inadvertently made in Amendment 69.

(88-487? Group 4 6.4-4 Correction:

Corrects the description of the control room pressure envelope rooms and areas.

(88-328.1) Group 2

Attachment,to TXX-88445 May 27, 1988 Page 6 of 23 FSAR Page (as ainended)

Description 7.3-91 Editorial:

Inserts missing sentence for the Section 7.3.2.2.7 which was omitted due to the repagination.

(88-344.2) Group 4 7.8-2 Editorial:

It was previously implied that AMSAC would automatically perform its intended function when the "plant is above" a preselected power level.

This phrase is added for clarity.

(88-470.1) Group 4 7.8-6 Editorial: The word "cualified" is replaced by the words "Class 1E" to be more cescriptive about the isolation relays.

(88-470.1) Group 4 7.8-13 Editorial:

The word "completed" is replaced with the word "initiated" to clarify that the AMSAC mitigative actions start after the time delay and are not completed at the end of the time delay.

(88-470.1) Group 4 Table 9.1-3 Editorial: Corrects the typographical error for the Sheet I design heat transfer parameter.

(88-296) Group 4 Figure 9.1-13 Correction: Corrects the figure to reflect the as-built Sheets 1 thru 4 condition, splits the figure, and adds the safety class changes, line numbers, and reducers to the Spent Fuel pool cooling and Purification System.

(88-291,351) Group 4 9.4-2 Correction: Corrects the description of the areas located on floor elevation 840 ft 6 in.

(88-328.2) Group 2 9.5-1, 2, 9, Clarification:

Changes reference from FHA to FPR 10, 61, 89, 91, because the FHA Report is part of the FPR.

Also and 106 replaces the term train with the more precise less ambiguous concept of redundant fire safe shutdown equipment and components.

(88-402.1) Group 4 9.5-4 Editorial:

Provides a title for MPFL for consistency.

(88-402.9) Group 4

Attachment.to TXX-88445 May'27, 1988 Page 7 of 23 l

FSAR Page (as amended)

Description 9.5-5 Correction:

Establishes the definition of FHA Naluations which describes a method used to demonstrate compliance with the guideline.

(88-402.5) Group 2 Correction:

Deletes inconsistent information since FHA Evaluation demonstrates compliance instead of "meeting intent of guideline".

(88-402.4) Group 4 Clarification: Adds pertinent information as to where the demonstrated compliance is documented (in the FPR).

(88-402.1) Group 4 9.5-6 Clarification: Changes "safety train" to "fire safe shutdown component" to better describe the redundant system for fire protection.

(88-402.1) Group 4 Correction:

Adds reference to FPR for MPFL where isolated areas follow burning characteristic curves other than the standard time-temperature curve.

(88-402.5) Group 2 9.5-8 Clarification:

Clarifies the description of automatic suppression system coverage.

(88-402.1) Group 4 9.5-8 and Clarification:

Clarifies combustibles for 20' separation 9.5-30 as being negligible.

(88-402.1) Group 4 9.5-11 Correction:

Deletes reference to FHA figure for detailed detector coverage information.

Detector coverage information is included in the Fire Protection Report.

(88-402.3) Group 3 9.5-12 Clarification:

Deletes reference to ANI criteria and retains reference to NFPA 13 and BTP APCSB 9.5-1.

(88-402.1) Group 4 Clarification: Clarifies the description of design criteria used for siting water storage capacity and for hydraulic analysis of suppression systems.

(88-402.1) Group 4

Attachment.to TXX-88445 May'27, 1988 Page 8 of 23

~

.FSAR Page (as amended)

Description 9.5-15 and Correction:

Deletes discussion of suppression systems 9.5-23 for large oil filled transformers.

These systems are beyond the scope of the fire protection analysis addressed in the FSAR.

Transformers-located within 50 inches of Unit 1 and Common Buildings containing fire safe shutdown equipment are described in the Fire Protection Report.

A transformer has been added to the site.

It is located more than fifty feet from the west end of the Turbine Building.

This transformer while not protected by automatic suppression does not represent a hazard to buildings containing fire safe shutdown equipment, and meets the requirements of BTP APCSB 9.5-1, Appendix A.

(88-402.5) Group 2 9.5-16 Editorial:

Changes "not be available" to "be unavailable".

(88-402.9) Group 4 Clarification:

Clarifies the description of the pipe system that is supplied Fire Protection water.

(88-402.1) Group 4 9.5-20 Addition: Adds reference in FPR for NFPA 14 code deviations.

(88-402.8) Group 2 9.5-27 Clarification: Adds reference to Section 9.5.1.6.2 to describe protection provided by steel hatches.

(88-402.1) Group 4 9.5-28 Correction:

Deletes reference to FHA Drawings for door swing pattern and fire door ratings.

Fire door rating compliance is described in FSAP. Section 9.5.1.6.1 (D.1.j).

(88-402.5) Group 2 9.5-30 Clarification: Changes "generally arranged to provide area coverage" to "provide coverage adequate for the hazards in the area" to be more descriptive of the coverage provided.

(88-402.1) Group 4 9.5-53 Correction:

Adds discussion of FHA Evaluations to demonstrate compliance for separation criteria.

(88-402.5) Group 2

--,r r-n

,e- - -y w

n

=

Attachment.to TXX-88445 May'27, 1988 Page 9 of 23 FSAR Page (as amended)

Description 9.5-54 Clarification:

References Fire Protection Report, (Reference 19) for docketed deviations.

Deviations are included as Appendix C to the Fire Protection Report.

(88-402.1) Group 4

~

Clarification:

Clarifies combustibles for 20' separation as being negligible.

(88-402.1) Group 4 Clarification:

Provides clarification of descriptions of separation.

This change is made to more clearly state equipment (vice' trains) g redundant fire safe shutdown the methods of separatin and protecting them from a single fire hazard.

(88-402.1) Group 4 9.5-65 Revision:

Provides correction to CPSES Fire Protection Program for internal conduit seals.

(88-402.2) Group 2 9.5-72 Clarification:

This addition clarifies that fixed Emergency Lighting is provided in areas necessary to achieve hot standby, (88-402.1) Group 4 9.5-73 Clarification:

Deletes portion of the statement for 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> batteries since the statement is redundant within this section as clarified.

(88-402.1) Group 4 Correction:

Inserts reference to battery powered portable hand lights.

(88-402.5) Group 2 9.5-82 Correction: Corrects the section of the FSAR which is being referred to.

(88-402.4) Group 4 9.5-84 and Clarification:

Clarifies NFPA status as a standard not 9.5-85 guideline and clarifies how and where differences with NFPA standards is documented.

(88-402.1) Group 4 9.5-88, 93, 102, Correction:

Deletes reference to engineering 106, and 114 evaluations justifying noncompliances.

Noncompliances to BTP APCSB 9.5-1, Appendix A are documented in deviations, Appendix C to the Fire Protection Report.

(88-402.5) Group 2

Attachment to TXX-88'445 May'27, 1988 Page 10 of 23 FSAR Page (as amended)

Description 9.5-103 Clarification: Clarifies that Safety Related Battery Rooms are separated in accordance with BTP APCSB 9.5-1, Appendix A.

(88-402.1) Group 4 Revision:

Inserts information pertaining to exception as discussed in FSAR Section 9.5.1.6.

(88-402.2) Group 2 9.5-112 Correction:

Corrects the fire area and unit that are being referred to.

(88-402.3) Group 3 9.5-113 Update: Adds referral to refererce [19], Fire Protection Report, for additional deviations to BTP APCSB 9.5-1 Appendix A.

(88-402.6) Group 2 9.5-114 Revision:

Deletes reference to Engineering Evaluations.

Descriptions of Metal Hatch Covers and Penetration Seals installed in bus duct penetrations are included in this section as exceptions.

(88-402.2) Group 2 9.5-114 and Revision:

Descriptions of Metal Hatch Covers and 9.5-115 Penetration Seals installed in bus duct penetrations are included in this section as exceptions.

(88-402.2) Group 2 9.5-116 Revision:

Includes description of Tornado / Vent fire dampers and door frames as exceptions.

(88-402.2) Group 2 9.5-117 Revision:

Deletes reference to engineering evaluation and included description of flexible conduit penetrations as exceptions.

i (88-402.2) Group 2 9.5-119 Correction:

Deletes reference to NEL-PIA because NEL-PIA criteria is beyond the scope of the fire protection analysis addressed in the FSAR.

(88-402.3) Group 3 Clarification:

Clarifies plant shutdown as being due to fire inside Containment.

(88-402.1) Group 4

Attachment to TXX-88445 Hay.27, 1988 Page 11 of 23 FSAR Page Jasamended)

Description 9.5-133 Clarification: Makes addition as shown for clarity.

This addition clarifies that fixed Emergency Lighting is.

provided in areas necessary to achieve hot standby.

(88-402.1) Group 4 Clarification: Adds "at least" ahead of "4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> rated battery packs" for the Turbine Building emergency lighting to establish agreement with FSAR Section 9.5.1.6.1.

(88-402.1) Group 4 9.5-165 Update: U (88-402.7)pdates the document referenced for deviations.

Group 3 10.4-61 Addition:

Adds the feedwater split flow bypass valves as was advertently left out in the previous FSAR amendment.

(88-358) Group 4 10.4-69 Revision:

Thermocouples located on the feedwater lines outside containment are replaced by the RTD's.

RTD's provide an accurate temperature differential of feedwater temperature inside and outside the containment.

(88-253) Group 3 10.4-70 Addition:

Adds the description for the feedwater split flow bypass valve during AFW initiation.

(88-358) Group 4 13.2-2 Revision:

Changes word following "Section 13.2.2.3.1" from "will" to "may" to permit changes in operator qualifications e.g. allowing an operator to License on only one unit.

(88-174) Group 3 Table 13.5-2 Correction:

Relocates procedure reference to the "Boron Sheet 1 Recycle System" from System Operating Procedures (Table 13.5-2 to the Radwaste Systems Procedures (Table 13.5-5.

(88-171) Group 4 Table 13.5-5 See Table 13.5-2 13.6-1 Update:

Changes discussion regarding security program guidance to reference Section 1A(B) - R.G. 1.17.

(88-395.1) Group 4 13.6-1 and Update:

The position of "Supervisor, Station Security" 13.6-2 does not exist.

Responsibilities as described are addressed by the Plant Security and Industrial Security Supervisors.

(88-334) Group 4

Attachment to TXX-88445

-May.27, 1988 Page 12 of 23 FSAR Page (as amended)

Description 13.6-4 Revision: Changes description regarding the location of the perimeter patrol road with respect to the isolation zone vs the protected area.

(88-396) Group 2 13.6-5 Addition: Adds the alternate access point for personnel and vehicles to enter the protected area from the Unit 2 side of the plant.

(88-397) Group 2 Editorial: Changes "industrial" to "radiological" for consistency with the regulation.

(88-395) Group 4 Clarification:

Redefines reporting requirements to be in accordance with facility procedures. These procedures meet regulatory requirements and are maintained considering appropriate regulatory guidance.

Organization changes have made the previous text incorrect and attempting to keep these specifics in the FSAR and up-to-date is unnecessary.

(88-335) Group 2 14-i, 14-iv, Editorial: Corrects the Table of Contents to provide and 14-v consistency with changes made in Amendment 68.

(88-336) Group 4 14.2-12 Editorial:

Deletes "described in Section 14.2.2.5.2" fromSection14.2.2.5JointTestGroup(JTG1toprovide consistency with the diletion of Section f4.2.2.5.2 in Amendment 68.

(88-394) Group 4 Table 14.2-2 Correction:

Deletes "smoke detectors" from Test Method, Sheet 28 Item 4.

The demonstration of these smoke detectors is provided under the Fire Protection System Test Sunnary on Table 14.2-2, Sheet 8.

(88-371) Group 4 15.0-15 Clarification:

Implements a change presented in TXX-4431 which responded to a staff question concerning Reactor Trip System Instrumentation Response Times listed in Table 3.3-2 of the then existing version of the technical specifications.

The change remains consistent with the Rev. 8 Technical Specifications submitted with TXX-6905 on October 30, 1987.

(88-429) Group 4 Clarification:

Deletes the sentence immediately preceeding the one in which the change presented in TXX-4431 was made in order to avoid the potential for confusion.

(88-429) Group 4

=

~

Attachment to TXX-88445 i

May'27, 1988 Page 13 of 23 FSAR Page (as amended)

Description 15.2-28 and Editorial: Restores text that was inadvertently deleted 15.2-29 when processing Amendment 66. No Amendment 71 change bars were included in order to maintain historical amendment numbers.

(88-419) Group 4 15.2-31 Editorial:

Restores text that was inadvertently deleted in Amendment 57 (some of which was restored in Amendment 66).

(88-419) Group 4 15.4-33 Correction: Adds valve ICS-8455 to the list of valves that are administratively controlled during refueling operations in order to isolate the RCS from potential sources of unborated water.

This brings the FSAR into conformance with the valve list in Rev. B of the i

Technical Specifications.

(88-372.1) Group 3 15.4-33 Clarification:

Provides proper alpha-numeric identifiers for three valves previously identified only by their numerical designators which have not changed.

(88-372.2) Group 4 j

Clarification: Adds the word significant to indicate that although there may be other sources of unborated water, the amounts that could reach the RCS would be small.

(88-372.2) Group 4 15.4-53 Correction: Deletes a sentence indicating that ejected rod worths and power distributions are measured in the zero and full power configuration, with the results being compared with values used in the analysis.

The sentence was overlooked in preparing Amendment 66 that deleted the pseudo rod ejection test which was to make the referenced measurements.

(It should be understood that the "power distributions" referred to in the sentence being deleted are those associated with this test and are not the power distribution measurements to be performed at each power escalation plateau.)

(88-175.1) Group 3 15.4-61 Editorial:

Adds the word "remaining" to indicate that the activity available for leakage is that which remains, given that 50 percent of the iodine is assumed to immediately plate out, as stated in the previous sentence.

(88-419) Group 4 Table 15.6-11 Editorial:

Indicates that this table has not been deleted, but rather has been revised and renumbered as Table 15.6-10.

(88-419) Group 4

Attachment to TXX-88445 May'27, 1988 Page 14 of 23 FSAR Page (as amended)

Description Sections 17.1 These sections have been revised to' reflect the and 17.2 consolidation of the existing Quality Assurance documents into the TV Electric Comanche Peak Steam Electric Station Quality Assurance Manual (QA Manual).

This QA Manual has been reviewed by the Quality Assurance Department and the changes have been determined not to constitute a reduction in commitments made in the Quality Assurance Program previously accepted by the NRC.

The TV Electric Comanche Peak Steam Electric Station Quality Assurance Program (QA Program) is defined in FSAR Chapter 17.

The QA Manual has been established and implemented (February -1,1988), to provide references to the written policies, procedures and instructions that are used to implement the QA Program.

Therefore, all references to the Corporate Quality Assurance Program, the CPSES Quality Assurance Plan, the Startup Quality Assurance Plan and the Operations Administrative Control and Quality Assurance Plan have been deleted. As a result of this change only references to the QA Program and QA Manual are necessary.

(88-418.2) Group 2 17.1-1 Clarification:

Clarifies that the QA Program is Chapter 17 of the FSAR.

(88-418.1) Group 4 Revision:

This change reflects the consolidation of the existing Quality Assurance documents into the QA Manual.

This QA manual has been established to provide references to the written policies, procedures and instructions that are used to implement the QA Program. As a result of this change, only references to the QA Program and QA Manual are necessary.

See General discussion Sections 17.1 and 17.2.

(88-418.2) Group 2 17.1-2 Clarification:

Deletes "Gibbs and Hill" as an Architect-Engineer for CPSES which is consistent with Engineering Services Contractors which are assigned specific scopes of work for design engineering activities.

(88-418.1) Group 4 Clarification: Clarifies that Engineering Services Contractors (Architect-Engineers) are assigned work for design engineering in accordance with the requirements of the Nuclear Engineering and Operations organization, i

This work is conducted in accordance with their TV Electric-approved QA Programs.

(88-418.1) Group 4

Attachment.to TXX-88445 May'27, 1988 Page 15 of 23 FSAR Page (as amended)

Description 17.1-2 Clarification:

Clarifies that Brown & Root (B&R) provides the QA Program for ASME Section Ill (ASME NA certificate holder) Code work only.

(88-418.1) Group 4 17.1-4 and See Justification for page 17.1-1, Revision: (QAManual).

17.1-5 (88-418.2) Group 2 17.1-5 Clarification:

Clarifies the implementation of the site QA efforts in construction areas excluding ASME Section 111 Code work.

Section 17.1 pertains to design and construction activities only. Replace "all" with "construction."

(88-418.1) Group 4 17.1-5 and See Justification for (ASME Section 111 Code work)page 17.1-2, Clarification:

17.1-7 (88-418.1) Group 4 17.1-8 Revision:

Deletes "warehousing" from Brown & Root (B&R) activities.

TV Electric performs warehousing activities in accordance with appropriate QA policies, procedures and instructions.

(88-418.3) Group 2 Clarification:

Clarifies the implementation of the site QA efforts in construction areas excluding ASME Sectioi III Code work.

Section 17.1 pertains to design and construction activities only.

(88-418.1) Group 4 See Justification for Section Ill Code work)page 17.1-2, Clarification: (ASME (88-418.1) Group 4 17.1-9 Clarification:

Clarifies that Brown & Root (B&R) technical and administrative supervision is for ASME Section III Code work only.

(88-418.1) Group 4 Clarification:

This change is to cicarly differentiate between ASME and non-ASME construction inspection activities.

(88-418.1) Group 4 17.1-10 Clarification:

Clarifies that Brown & Ruot (B&R) performs periodic audits of their ASME Section 111 Code Program which are required to maintain their Certificate of Authorization.

(88-418.1) Group 4

Attachment t.-

?XX-88'445 May'27, 1988 Page 16 of 23 FSAR Page (as amended)

Description 17.1-10 and See Justification for page 17.1-2, Clarification: '(ASME 17.1-11 Section III Code work).

(88-418.1) Group 4 See Justification for page 17.1-1, Revision: (QAManual).

(88-418.2) Group 2 17.1-12 See Justification for page 17.1-1, Revision: (QAManual).

(88-418.2) Group 2 17.1-13 Clarification:

Clarifies the control of changes to engineering specifications.

To be consistent with the wording of paragraph 17.1.3.1, delete the statement "written procedures also document resolution of."

Procedures describe the method of documenting the resolution and the required documentation of the reviews.

(88-418.1) Group 4 17.1-15 Clarification:

Clarifies that procurement documents are subjected to the reviews and controls described in this Section 17.1.

This change deletes the reference to "17.1.3."

(88-418.1) Group 4 17.1-16 Clarification: Clarifies that TV Electric or B&R Quality Assurance programs also review purchase orders or contracts to assure that all required quality assurance and quality control information of the procurement document, including requirements for control, maintenance, and submittal of quality records, is reflected in the purchase order and contract.

This is by adding the following wording at the beginning of the paragraph "TV Electric or Brown & Root (ASME Section III Code purchases)."

(88-418.1) Group 4 Clarification:

This change is to make clear that the l

requirements (e.g. utilization of procedures, establishment and implementation of QA programs, division of authority) pertain to both TV Electric and its contractors / vendors.

(88-418.1) Group 4 17.1-17 and See Justification for page 17.1-1, Revision: (QA Manual).

l 17.1-18 (88-418.2) Group 2

1 Attachment-to TXX-88445 May 27, 1988 Page 17 of 23 FSAR Page (as amended)

Description 17.1-21 See Justification, for page 17.1-16, Clarification:

(requirements pertain to both TV Electric and its contractors / vendors).

(88-418.2) Group 2 Clarification: A change to clarify that provisions are made for the conditional release of the status of nonconforming items under certain conditions. Replace "temporary waiver" with "conditional release."

(88-418.1) Group 4 17.1-22 thru See Justification for page 17.1-16, 17.1-27 Clarification:

(requirements pertain to both TV Electric and its contractors / vendors).

(88-418.1) Group 4 17.1-31 Revision:

Required inspections and signoffs, for systems that are transferred to TV Electric, will be obtained not only from startup and test personnel, but also from quality control personnel.

(88-418.3) Group 2 l

17.1-32 See Justification for page 17.1-16, Clarification:

(requirements pertain to both TV Electric and its contractors / vendors).

(88-418.1) Group 4 Clarification:

Clarifies that departures from design specification and drawing requirements that are not dispositioned as "rework" or "scrap" require dispositioning by Engineering or its contractors.

Replace '"use as is" and "repair"' with '"rework" or "scrap".'

(88-418.1) Group 4 17.1-33 and Revision:

The qualifying statement that NCR's are 17.1-34 evaluated by Engineering for disposition (... ", and.

which Engineering evaluates for disposition.") has been deleted since not all NCR's require Engineering evaluation. An NCR initiated by other than Engineering can be dispositioned "rework" or "scra)" without an Engineering evaluation.

Those NCR's w1ich do require Engineering evaluation / disposition are described elsewhere in Section 17.1.15 (page 17.1-32).

(88-418.3) Group 2 Revision:

Deletes "engineering / construction" because other disciplii, s can also provide disposition for quality items identified on IR's, OR's, or NCR's.

(88-418.3) Group 2 i

Attachment to TXX-88'445 May 27, 1988 Page 18 of 23 i

FSAR Page l

(as amended)

Description 17.1-35 and See Justification for page 17.1.1, Revision: (QA 17.1-36 Manual).

(88-418.2) Group'2 See Justification for page 17.1-16, Clarification:

(requirements pertain to both TV Electric and its contractors / vendors).

(88-418.1) Group 4 17.1-36 Clarification:

Clarifies that it is not always possible to inspect an item to the original criteria.

if an alternative inspection criteria is justified by Engineering the alternative inspection criteria is adequate.

Change the wording from "... as originally inspected..." to "... to specified requirements..."

(88-418.1) Group 4 17.1-38 Revision:

Deletes the description of the "permanent on-si'.e record storage facility" and add general requirements for the storage and control of records.

The facility currently described in the FSAR is the "PPRV" (the construction document storage area located in the Brown & Root Administration building) which is no longer considered a TV pennanent records storage facility.

Records will be stored in facilities inspected and certified by a Fire Protection Engineer as complying with ANSI N45.2.9.

(88-418.3) Group 2 17.1-40 Clarification: To be consistent with Section 17.2.18 the conformance to the regulatory audit requirements is i

verified by ttree methods.

TV Electric performs this verification.

(88-418.1) Group 4 Table 17.1-2 See Justification for page 17.1-1, Revision: (QA Manual).

(88-418.2) Group 2 Figure 17.1-1 Update:

This change reflects the current TUEC organization. Replace "Company" with "Division."

(88-418.4) Group 4 l

__.-_____---A.

.'-- - - - - - - - - - - - - - - - - - - ^ ' " - - - - - - ' - - - - - - - - - - - ' - - - - - - - - - - - '

y Attachment to TXX-88'445 i

May 27, 1988 Page 19 of 23 FSAR Page (as amended)-

Description Figure 17.1-6 Revision: Revises to be consistent with figure 17.1-2 and to incorporate title / responsibility changes for the-Manager, Startup and Test.

(88-418.3) Group 2

-See Justification for page 17.1-1, Revision:

(QA Manual).

(88-418.2) Group 2 17.2-2 Revision:

The Vice-President, Nuclear Engineering is responsible for development of the CPSES QA Program, which addresses operation phase activities. The Vice-President, Nuclear Operations is responsible for implementation of, and compliance with, the CPSES QA Program within the Nuclear Operations function.

(88-418.3) Group 2 Revision: The CPSES 0AC/QAP has been retired.

The 1

concurrence and approvals required for the CPSES QA Manual are addressed in Section 17.2.1.1.4 of the FSAR.

See Justification for page 17.1-1, Revision:

(88-418.3) Group 2 Revision:

This change is for consistency with current organizational responsibilities.

Revised to incorporate title / responsibility changes for the Manager, Startup and Test.

(88-418.3) Group 2 17.2-3 and Revision:

The overall responsibility for the 17.2-4 Initial Startup Test Program rests with the Vice-President, Nuclear Operations.

(88-418.3) Group 2 17.2-4 Revision:

For consistency with current reorganization of responsibilities.

The Manager, Plant Operations has relinquished chairmanship of the Joint Test Group to the Manager, Startup and Test.

(88-418.3) Group 2 See Justification for page 17.1-1, Revision:

(QA Manual).

(88-418.2) Group 2 l

17.2-7 Revision:

Effective im11ementation of the QA Program is the responsibility of t1e Director, Quality Assurance.

The Manager, Operations QA reports directly to the Director, Quality Assurance.

(88-418.3) Group 2 See Justification for page 17.1-1, Revision:

(QA Manual).

(88-418.2) Group 2 i

1

l Attachment to TXX-88445 May 27,' 1988 Page 20 of 23 FSAR Page (as amended)

Description 17.2-9 Revision: Qualification criteria for inspection personnel are reviewed by the Manager, Operations QA as part of the HQA procedures approval process, not part of the_ Station Operations Review Committee (SORC).

(88-418.3) Group 2 17.2-10 Editorial:

This statement is being moved to Section 1.7.2.11.1, "Test Program" (page 17.2-29),

(88-418.5) Group 4 17.2-10 and See Justification for page 17.1-1, Revision:

(QA 17.2-11 Manual).

(88-418.2) Group 2 17.2-12 Revision:

The Director, Quality Assurance has responsibility for the control and distribution of the QA Manual and revisions thereto.

(88-418.3) Group 2 See Justification for page 17.1-1, Revision:

(QA Manual).

(88-418.2) Group 2 Revision: Overall responsibility for the identification, scheduling, assignment, conduct and reporting of the station QA activities assigned to the QA Department is a function of the Director, Quality Assurance.

(88-418.3) Group 2 17.2-13 See Justification for page 17.1-1, Revision:

(QA Manual).

(88-418.2) Group 2 17.2-14 Revision:

Preoperational and Startup testing is accomplished in accordance with FSAR, Section 14.2 "Initial Test Program." The QA requirements assure that implementing procedures are prepared prior to coninencement of the activities which they are intended to control.

(88-418.3) Group 2 See Justification for page 17.1-1, Revision:

(OA Manual).

(88-418.2) Group 2 Clarification:

Clarifies that final approval of all i

station modifications is the responsibility of the 50RC, not just the design portion.

(88-418.1) Group 4 n-

?

Attachment to TXX-88'445 May 27, 1988 Page 21 of 23 FSAR Page (as amended)

Description 17.2-15 Clarification: Clarifies that design modifications will.

be done by engineering or approved engineering services contractors in all areas except reactor engineering.

The Reactor Engineering Department will be responsible for-design modifications in the area of reactor engineering.-

(88-418.1) Group 4 17.2-16 and See Justification for page 17.1-1, Revision:

(QA 17.2-17 Manual).

(88-418.2) Group 2 17.2-17 Revision:

To be consistent with Regulatory Guides and Standards, reference to Regulatory Guide 1.33 is added and reference to Regulatory Guide 1.28 is deleted to reflect only the requirements applicable to the operations phase.

(88-418.2) Group 2 17.2-18 and See Justification for page 17.1-1, Revision:

(QA 17.2-19 Manual).

(88-418.2) Group 2 17.2-19 See Justification for page 17.2-17, Revision:

(Regulatory Guides 1.33 and 1.28).

(88-418.2) Group 2 17.2-20 See Justification for page 17.1-1, Revision:

(QA Manual).

(88-418.2) Group 2 17.2-21 See Justification for page 17.2-17, Revision:

(RegulatoryGuides1.33and1.28).

(88-418.2) Group 2 Clarification:

Clarifies obsolete or superseded documents are destroyed or identified to prevent their inadvertent use.

Delete '...as "SUPERSEDED"...' because documents also may be marked "void."

(88-418.1) Group 4 See Justification for page 17.1-1, Revisi (QA t

Manual).

(88-418.2) Group 2 j

17.2-22 thru See Justification for page 17.2-17, Revision:

17.2-26 (Regulatory Guides 1.33 and 1.28).

(88-418.2) Group 2 17.2-28 See Justification for page 17.2-17, Revision:

(Regulatory Guides 1.33 and 1.28).

(88-418.2) Group 2

Attachment to TXX-88445 May 27, 1988 Page 22 of 23 FSAR Page (as amended)

Description 17.2 See Justification for page 17.2-10, Editorial.

(88-418.5) Group 4 17.2-30 thru See Justification for page 17.2-17, Revision:

17.2-32 (Regulatory Guides 1.33 and 1.28).

(88-418.2) Group 2 See Justification for page 17.1-1, Revision:

(QA Manual).

(88-418.2) Group 2 17.2-33 Revision: Surveillance activities are performed by Quality Assurance personnel.

Operations.QA does not perfonn all surveillances.

(88-418.3) Group 2 17.2-33 and See Justification for page 17.2-17, Revision:

17.2-35 (Regulatory Guides 1.33 and 1.28).

(88-418.2)-Group 2 See Justification for page 17.1-1, Revision:

(QA Manual).

(88-418.2) Group 2 17.2-36 Revision:

Records Management responsibilities (for development of procedures and instructions to implement management requirements related to QA records) have been transferred to the Vice-President, Administration.

(88-418.3) Group 2 See Justification for page 17.2-17, Revision:

(Regulatory Guides 1.33 and 1.28).

(88-418.2) Group 2 See Justification for page 17.1-1, Revision:

(QA Manual).

(88-418.2) Group 2 17.2-38 and Clarification: Clarifies that contractors and 17.2-39 vendors are both subject to audit.

(88-418.1) Group 4 Table 17.2-1 Revision:

This table is revised to be' consistent with Table 17.1-2 "CPSES QA MAtlVAL COMPLIAllCE MATRIX."

The information contained within the two tables is the same but the format was different.

See Justification for page 17.1-1, Revision:

(QA Manual).

(88-418.2) Group 2

Attachment to TXX-88445' May 27, 1988 Page 23 of 23 FSAR Page -

(as amended)

Description Table 17.2-2 See Justification for page 17.2-17, Revision:

(Regulatory Guides 1.33 and 1.28).

(88-418.2) Group 2 Figure 17.2-1 and See Justification for Figure 17.1-6, Revision:

Figure 17.2-2 (Responsibility changes for the Manager, Startup and Test).

(88-418.3) Group 2 Q&R 040-60 Editorial:

Corrects the typographical error for the tag no. of the containment isolation valve V52600-5297-7.

(88-344.1) (Group 4)

Q&R 040-72c thru Editorial:

Deletes three pages which should have been 040-72e removed previously.

The deletion of these sheets were inadvertently not included in Amendment 66.

(87-291) Group 4 Q&R 423-45 Editorial:

Lists the correct reference to Section 14.2 with identifies the test program requirements for AMSAC.

(88-470.2) Group 4 1

I 1

4 l.