Forwards Rev 0 to Station Svc Water Sys Coating Removal Project Evaluation, Addressing Corrosion Concerns
ML20154M619
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/23/1988
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20154M624 List:
References
NUDOCS 8809290046
Download: ML20154M619 (2)


Text

_

'e MFE Log 4 TXX-88699 Fi1e # 10110 i

.r C

909.2 1UELECTRIC September 23, 1988 i

?. NiuSYrien.,

U. S. Nuclear Regulatory Commission r

Attn: DocurJent Control Desk Wr.shington, D.C.

20555 i

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) i DOCKET NO. 50-445 i

C0ATING REMOVAL FROM STATION SERVICE WATER l

SYSTEM DIPING Gentlemen:

[

TV Electric has been involved in a program to address corrosion concerns relating to the Station Service Water System (SSWS) at the Comanche Peak Steam Electric Station (CPSES).

A portion of that program involved removing the internal coating from specific sections of the SSWS piping.

The coating removal activities were discussed in Inspection Reports 50-445/88-34; 50-446/88-30 dated June 17, 1988: 50-445/88-40; 50-446/88-36 dated July 15, 1988: 50-445/88-47 and 50-446/88-42 dated September ?, 1988,

[

dnd in d managemenc meeting on September 13, 1988.

In the meeting, TV Electric discussed coating removal activities including various concerns enc ontered, both administrative and technical.

The TV Electric presentation

[

was based upon reviews which have been on-going and an engineering report which was under development.

[

During the meeting, TV Electric committed to complete and submit this l

engineering report by September 23, 1988.

Subsequent to the meeting, an NRC representative requested a chronology of the events related to the coating t

removal effort.

This chronology has been prepared and incorporated into the i

engineering report.

The engineering report is enclosed with this letter.

[

I s

j 8809290046 800923 PDR ADOCK 05000445 i

A PNV

'}l

}

K4 kerk Oine surret i8 8I ikilen. *enss ?)MI

(

i TXX-88699 September 23, 1988 Page 2 of 2 As a result of this review, TV Electric has identified several actions which are being impicme'ted.

These actions inclu1e corrective actions as well as enhancement

  • < assure that concerns are corrected and that similar concerns do not tur.

These actions are described in the enclosed

~ report and actions are scheduled to be comp 1"+ed on cr before December 1, 1988.

J Since TV Electric recognizes that identification of root causes and contributing J

facters can be a subjective process, there are two points that it believes

[

should be emphasized.

First, labeling one concern as a root cause and r

others as contributing factors did not lead to the latter receiving any l

less attention.

Such con: erns were carefully evaluated for po*ential generic implications, and corrective and preventive :ctions were developed i

to preclude recurrence.

Secondly, TV Electric scrutinized the corcerns i

that were identified in the entire coating removal project, from the problem characterization phase to the evaluatton of dage to the pipe.

Consequently, l

all concerns have been fully and appropriately addressed.

Very truly yours.

I b?lJ{' '

j W.

Counsil t

MCP/grr i

Enclosure c - Mr. R. D. Martin, Region IV 1

Resident Inspectors, CPSES '3)

I I

Texas 04partment of L6bor and Standards l

Boiler !ivision f

i E. O. Tlempson State Offict Building I

P. O. Bcx 12157 Capitol Station i

Austin, Texas 78701 Attn: itee Pattt+ws l

i i

i I

t

[

)

i i

t l

i 4

i I

i

.