ML20154M111

From kanterella
Jump to navigation Jump to search
Forwards State of AL to Util Re Two Minor Changes in Operational Procedure at Plant,Per Tech Spec Section 3.2
ML20154M111
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 05/25/1988
From: Mcdonald R
ALABAMA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NT-88-0267, NT-88-267, NUDOCS 8806010176
Download: ML20154M111 (3)


Text

-

NT 88-0267 Alcbama Power Company

. 6C0 North 18th Street Post offi e Box 2641 Birming,'iam, Alabama 35291-0400 Telepione 205 250-1835 h

"s#fle"*1mn, Alabama Power Executive tre soaren eewc system May 25, 1988 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Comission Attention: Document Control Desk Washington, D. C. 20555

Subject:

Joseph M. Farley Nuclear Plant NPDES Permit Gentlemen:

A copy of the attached correspondence is provided in accordance with the Joseph M. Farley Nuclear Plant Technical Specifications, Appendix B, Section 3.2.

Should you have questions or comments, please advise.

Yours very truly, tJ.) N O W R. P. Mcdonald RPWJAM:emb Attachment cc: Mr. L. B. Long (w/ attachment)

Dr. J. N. Grace (w/ attachment)

Mr. E. A. Reeves-(w/attichment)

Mr. W. H. Bradford (w/r.:tachment) 9904.01G'76 880525 1DR AD:.!CK 0S00 8

j i\\

bc: Mr. W. G. Ifairston, III Mr. J. D. Woodard (A4.05 and A6.17)

Commitment Tracking System (2 copies)

File A45.3.5 i

l 1

l 1

l t

.A g

M

(*$g f ;M;1.,

ALABAMA g

4

{r

/

DEPARTMENT OF ENVIRONMENTAL MANAGEMENT Guy Hunt Governor LSegh Pegues. Directo' May 5, 1988 i

1751 Federal Drive Montgomery. AL 36130 205/271 7700 Mr. John D. Grogan, Manager Environmental Compliance Alabama Power Company

,;g gg,,;

P.O.

Box 2641 Unit 806. Buikiing 8 Birmingham, Al 35291 225 Onmoor C6rcle Birmingham. AL

Dear Mr. Grogan:

35209 206/942 6168 Re:

Farley Nuclear Plant NPDES No. ALOO24619 P.O. Bra 953 Dacitur. AL 35602 This is in response to your March 24, 1988, letter regarding two minor 2o5/353 1713 changes in operational procedures at the Parley Nuclear Facility.

1 As discussed with Mike Godfrey during our March inspection, we see no 22o4 Perimeter Road Mobile. AL problems with measuring flow below the chlorine contact chambers as this 36615 should provide a more accurate measuremen+. from the parallel treatment 205/479 2336 systems.

We also concur with the use of the portable oil water separator for use in managing water from the turbine building oil sumps and the discharge from the separator to either DSN024 and/or DSN025. The criteria and monitoring frequency for these discharge points should be sufficient to adequately monitor the discharge from the oil water separator.

Please let me know if you have any question regarding the above changes.

Since ely, Jem N M.

Moore III Environmental Engineer l

Industrial Branch l

Water Division l

JMM/mh 1

_ _ _ _ _ _ _ _ _