ML20151A485

From kanterella
Jump to navigation Jump to search
Advises That GO-EIP-121 Being Voided.All Items in Procedure Incorporated Into Rev 5 of GO-EIP-118, Ccd Corporate Activation & Notification Procedures
ML20151A485
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/24/1988
From: Harris R
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8804070039
Download: ML20151A485 (1)


Text

6 Alatcma Power Company l

600 North 18th Street Post Offge Box 2641 1

Birmmgham, Alabama 35291 i

TeteWne 205 250-1000 k

[

l h

i l

13 !M 30 /U0 : 3 4 Alabama Pbwer l

enwa,<u tre som March 24,1988 Docket No. 50-348 Docket No. 50-364 i

U. S. Nuclear Regulatory Commission Region II SnN 3100 1

101.Marietta Street, N. W.

8-Atlar.ca, GA 30303

Dear Sir:

4 This is to advise that G0-EIP-121 is being voided. All items in this procedure have been incorporated into Revision 5 of G0-EIP-118 CCD l

Corporate Activation and Notification Procedures. This change incorporated all CCD activation activities into one procedure.

}

Please verify that you have deleted G0-EIP-121 by signing and i

returning this memo in the self-addressed envelope.

l i

If you have any questions, please contact me at (205) 250-1877.

l I

l 8

Ro 1 Harris l

i I

{

Date l

Signature t

i RH:maf P

l 0804070039 000324 i

i PDR ADOCK 05000340 i

i F

PDR gS ',

yo%

Y ngiff 0

l 4

1

=

-