ML20154M106
| ML20154M106 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 05/23/1988 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Miltenberger S Public Service Enterprise Group |
| Shared Package | |
| ML20154M110 | List: |
| References | |
| NUDOCS 8806010175 | |
| Download: ML20154M106 (2) | |
See also: IR 05000354/1988009
Text
.
.
.
.
,
'
.
.
23 MAY B88
Public Service Electric and Gas Company
ATTN:
Mr. S. E. Miltenberger
Vice President and Chief Nuclear Officer
P. O. Box 236
Hancocks Bridge, NJ 08038
Gentlemen:
Subject:
Inspection No. 50-354/88-09
The letter transmits the findings of the routine, resident safety inspection
by Mr. G. Meyer, Mr. D. Allsopp, and other NRC personnel conducted from March 22,
1988 to April 25, 1988 at the Hope Creek Nuclear Generating Station. The findings
were discussed with Mr. S. LaBruna of your staff.
Within the scope of this inspection, the inspectors did not find any violations
and :oncluded that the reactor startup following the first refueling outage was
performed acceptably.
No reply to this letter is required. We appreciate your
cooperation.
Sincerely,
b
Signed Dyl
Edward C. Wenzinger, Chief
Projects Branch No. 2
Division of Reactor Projects
Enclosure:
NRC Inspection Report No. 50-354/88-09
cc w/ encl:
S. LaBruna, General Manager, Hope Creek Operations
B. A. Preston, Manager, Licensing and Regulation
M. J. Wetterhahn, Esquire
R. Fryling, Esquire
W. H. Hirst, Manager, Joint Generation Projects Department, Atlantic
Electric
Rebecca A. Green, Bureau of Radiation Protection
Public Document Room (PDR)
local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
0FFICIAL RECORD COPY
IR HC 88-09 - 0001.0.0
05/24/88
8806010175 880523
ADOCK 05000354
Q
Ql
g
"~.
-
..
...
.
,
i..
.
-
.
..
Public Service Electric-
2
'
and Gas Company
28 MAY 1988
.
bec w/ enc 1:
. Region I Docket' Room (with concurrences)
Management Assistant, DRMA (w/o encl)
DRP Section Chief'
Robert J. Bores, DRSS~
TI Coordinator; DRP
Operational Programs Section Chief, DRS
Plant Systems Section Chief, DRS
George Rivenbark, NRR Project Manager
B. Clayton, EDO
l
i
!
l
RI
L
Swetland/rbl
Wenzinger
5/ff88
Sf/88
0FFICIAL RECORD COPY
IR HC 88-09 - 0002.0.0
05/24/88
!