Informs That Based on Review,Tech Spec Section 5.2.1.1 Re Type a Containment Integrated Leak Rate Testing Conforms to App J Requirements for Min Allowable Leakage Rate
ML20154L907
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 03/06/1986
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: Taylor J
DAIRYLAND POWER COOPERATIVE
References
TAC-48681, NUDOCS 8603130168
Download: ML20154L907 (2)


Text

-

March 6, 1986 Docket No. 50-409 DISTRIBUTION Docket File RGrimes NRC PDR JPartlow local PDR RRuck PD#1 Reading JStang Mr. James W. Taylor la Crosse File CJamerson General Manager RBernero JZwolinski Dairyland Power Cooperative OELD ACRS (10) 2615 East Avenue South EJordan JLane La Crosse, Wisconsin 54601

Dear Mr. Taylor:

SUBJECT:

EVALUATION OF DAIRYLAND POWER COOPERATIVE'S TECHNICAL SPECIFICATIONS CONCERNING TYPE A CONTAINMENT INTEGRATED LEAK TESTING (TAC 48681)

Re: La Crosse Boiling Water Reactor By letter dated Cooperative August (the 5,)1975, licensce the NRC determine requested that if containment Dairyland testing Power was being conducted pursuant to 10 CFR Part 50, Appendix J. The licensee's resonnse, by letter dated September 9, 1975, described the areas in which the LACRWR program differed from Appendix J. In a subsequent letter dated May 13, 1982, the licensee identified one additional difference from Appendix J, pertaining to the maximum allowable leakage rate. Also contained in the 1982 letter was the licensee's justification for maintaining the previously established LAC 8WR leak rate testing program, and a request for the staff to review the La Crosse Technical Specifications section regarding Type A containment integrated leak testing.

The staff has reviewed Section 5.2.1.1 of the LACBWR Technical Specifications in comparison with Appendix J of 10 CFR Part 50. The requirements, in part, state that prior to resumption of plant operation following a shutdown involving a Type A test, the containment leakane rate shall be less than or equal to 75 percent of the leakage measured during the 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> test period at a pressure of 52 psig. The staff agrees with the licensee in that this section of the Technical Specifications conforms to Appendix J requirements.

No further action is required by Dairyland on this issue. This letter closes out the staff's sction on this item.

Sincerely.

Original si9ned by John A. Zwolinski, Director RWR Pro.iect Directorate 81 Division of BWR Licensing cc: See next page i

DBL:PD#1gh'DEtfj$1*, 0R1  : .

PD81 CJamerson RR6cY:rg JS' Zwolinski 3/ 9/86 d 7-/M/86 3

/86 - 3/3/86 lbi28&M % --

.o o

Mr. James W. Taylor Dairyland Power Cooperative La Crosse Boiling Water Reactor cc:

Fritz Schubert, Esquire Clarence Riederer, Chief Encineer Staff Attorney Wisconsin Public Service i Dairyland Power Cooperative Commission i 2615 East Avenue South Post Office Box 7854  ;

La Crosse, Wisconsin 54601 Madison, Wisconsin 53707  !

Roy P. Lessv Jr.

O. S. Heistand Morgan, Lewis & Bockius 1800 M Street, N.W. i 7th Floor North Receptionist Washington, D.C. 20036 Mr. John Parkyn, Plant Manager '

La Crosse Boiling Water Reactor Dair.vland Power Cooperative P. O. Box 275 Genoa, Wisconsin 54632 t

U.S. Nuclear Reaulatory Commission Resident Inspectors Office i

Rural Route #1, Box 276 Genoa, Wisconsin 5463?

Town Chairman Town of Genoa Route 1 Genoa, Wisconsin 54632 Chairman, Public Service Commission t of Wisconsin '

Hill Farms State Office Building Madison, Wisconsin 53702 Regional Administrator, Region !!!  !

U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen E11yn, Illinois 60137 i l

r i

'