Responds to NRC Re Chemical & Mechanical Test Results for Samples of Fasteners Obtained During Procurement Insp on 870511-22
ML20154L814
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 05/23/1988
From: Mcdonald R
ALABAMA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8806010075
Download: ML20154L814 (4)


Text

_ _ _ _ _..

Alabama Power Company 600 North 18th strest Post office Box 2641 Birmingham Alabama 35291-0400 Telephone 205 2501835 m

R. P. Mc Donald Alabama Power Senior Vice President Docket Nos. 50-348 the Southem eMnc system 50-364 10CFR50.54 May 23, 1988 U. S. Nuclear Regulatory Comission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:

Joseph M. Farley Nuclear Plant - Units 1 & 2 Bolt Samples obtained During

,. Procurement Inspection Conducted May 11-22, 1987 In response to NRC letter dated April 21, 1988 concerning the chemical and mechanical test results for the samples of fasteners obtained during the procurement inspection conducted May 11-22, 1987 at Farley Nuclear Plant, the following information is provided for the actions requested:

1.

NRC Item The results of your review of the test data with respect to the use of the fasteners in your plant and any corrective actions deemed necessary:

APCo Response According to the NRC letter, bolt Nos. SO-18 through SO-21 were not within the chemical specification requirements and bolt No. S0-23 exceeded the maximum hardness limit. A review of the Brookhaven reports and the procurement records resulted in the following sumary of the individual bolt samples:

S0-18 This bolt was purchased as non-safety related, QA review code A from the Johnston Pump Company.

It was purchased as a part for the River Water Pumps which are non-safety related. According to the Brookhaven report, the chromium value of 1.55% exceeded the specification requirement of 1.20% and the carbon content of 0.34% was 0.01% below the minimum.

However,.the "Certificate of Compliance" furnished by the supplier documents that the bolt meets the required chemical specifications.

/N jdd: M/ W AfNAO 1

8806010075 880523 l,od og /Adislw3 o

a\\s PDR ADOCK 05000348 Q

DCD

a U. S. Nuclear Regulatory Commission Page 2 May 23, 1988 S0-19 This bolt was purchased as safety-related, Qa review Code A from the Westinghouse Electric Corporation.

It was purchased as a part for the inspection handhole covers for the steam generators. According to the Brookhaven report, the chromium value of 1.80% exceeds the specif3 cation requirement of 1.20%. However, according to the mill analysis and a certified test report furnished by Westinghouse, the bolt meets the required chemistry specifications.

So-20 This bolt was purchased as non-safety related, QA review code D from Energy Steel and Supply. According to the Brookhaven report, the chromium value of 1.51% exceeds the specification requirement of 1.20%.

Ilowever, the "Certificate of Compliance" furnished by the supplier documents that the bolt meets the required chemical specifications.

S0-21 This bolt was purchased as non-safety related QA review code D from Energy Steel and Supply. According to the Brookhaven report the chromium value of 1.46% exceeds the specification requirement of 1.20%.

However, the "Certificate of Compliance" furnished by the supplier documents that the bolt neets the required chemical specifications.

So-23 This bolt was purchased as safety-related, QA review code A from Power and Engineered Products. According to the Brookhaven report the hardness was out of specification; however, on retest as prescribed by ASTM it was concluded that the bolt met specification requirements.

Prior to determining corrective actions, the chemistry of these bolts will be confirmed.

Duplicate bolts of these particular identification numbers have been obtained for analysis by an independent laboratory.

Identification numbers and the elements to be checked include:

S0-18 R/N 30603 chromium, carbon so-19 R/N 36255 chromium S0-20 R/N 35108 chromium S0-21 R/N 35106 chromium 1

Since it was concluded by the Brookhaven lab that sample S0-23 met the specifications, another analysis of this bolt will not be made.

1 According to the Brookhaven National Laboratory's "Metallurgical Evaluation" included in the NRC letter of April 21, 1988, the discrepancies in the chemistry of these bolts may be beneficial and/or would not have a significant effect on mechanical properties.

It was also concluded in this l

evaluation that bolts SO-18 through So-21 are considered "suitable for l

se rvice. " In addition, Alabama Power Company requested a design engineering review of the deviations described in this report. This review resulted in a conclusion that these fasteners are acceptable for service.

l l

l

=

U. S. Nuclear Regulatory Cormtission Page 3 May 23, 1988 2.

NRC Item A description of the steps that have been or will be taken to prevent a reoccurrence, i.e. assure that fasteners purchased meet specifications.

APCo Response once it has been confirmed that a fastener does not meet specifications, a plan of action will be developed and appropriate actions taken.

3.

NRC Item The dates your corrective action and preventive measures were or will be completed.

APCo Response A report including review and evaluaticn of additional test results, corrective actions, and preventive measures, if any, will be subntitted to the NRC by July 22, 1988.

If there are any questions, please advise.

Respectfully submitted, ALABAMA POWER COMPANY W. (YMY5 R. P. Mcdonald F

cc:

Mr. L. B. Long l

Dr. J. N. Grace Mr. E. A. Reeves Mr. W. H. Bradford l

l l

'f.

- bc:

Mr. Bill M. Guthrie Mr. W. G. Hairston, III Mr. J.~D. Woodard i -

Mr. J. W. McGowan Mr. C. D. Nesbitt Mr. R. G. Berryhill Mr. D. E. Mansfield Mr. J. E. Gerlington-Mr. K. W. McCracken Mr. J. A. Ripple Mr. Scott Fulmer Mr. J. T. Brantley Mr. D. B. Hartline Mr. D. E. Dutton Mr. J. R. Crane Mr. T. N. Epps Mr. K. C. Gandhi Commitment Tracking System (2)