Text
.
October 14,_1998 Mr. Dougins R. Gipson Srnior Vice Presidtnt i
Nuclear Generation -
Detroit Edison Company l
6400 North Dixie Highway Newport, MI 48166
SUBJECT:
RESPONSE TO NRC BULLETIN 95-02," UNEXPECTED CLOGGING OF A RESIDUAL HEAT REMOVAL (RHR) PUMP STRAINER WHILE OPERATING IN SUPPRESSION POOL COOLING MODE," FERMI 2 (TAC NO. M93893)
Dear Mr. Gipson By letters dated November 16,1995, and November 15,1996, Detroit Edison Company (DECO
' or the licensee) submitted its response to NRC Bulletin 95-02, " Unexpected Clogging of a Residual Heat Removal (RHR) Pump Strainer While Operating in Suppression Pool Cooling Mode," for Fermi 2. The enclosure provides the staff's evaluation of DECO's response.
NRC Bulletin 95-02 requested each licensee to review the operability of its emergency core cooling system and other pumps which draw suction from the suppression pool while performing their safety function. The staff requested that the licensee's evaluation be based on suppression pool cleanliness, suction strainer cleanliness, and the effectiveness of its foreign material exclusion practices. In addition, licensees were requested to implement appropriate procedural modifications and other actions (e.g., suppression pool cleaning) as necessary to minimize foreign material in the suppression pool, drywell, and containment. Licensees were also requested to verify their operability evaluation through appropriate testing and inspection.
In its response to the bulletin, by letters dated November 16,1995, and November 15,1996,
- DECO agreed to comply with all of the requested actions. The staff has concluded that DECO's response is acceptable.
Sincerely, ORIGINAL SIGNED BY
/
Andrew J. Kugler, Project Manager j
9810190141 981014 Project Directorate 111-1 ADOCK 0500 1
gDR Office of Nuclear Reactor Regulation Division of Reactor Projects - lil/IV g/
Docket No. 50 341
,,., g, q g.
m%e m E, -a L 6
wt g
^
Enclosure:
Safety Evaluation cc w/ encl: See next page DISTRIBUTION Docket File
- PUBLIC PD#3-1 Reading EAdensam(EGA1)
SEDB (TLH3)
OGC ACRS BBoger l-DOCUMENT NAME: G:\\WPDOCS\\ FERMI \\FE-93893.SE To receive a copy of this document, ind6cate in the box: 'C's Copy without attachment / enclosure "E"
- Copy with attachment / enclosure "N" = No copy OFFICE PM:PD31 lE LA:PD31 E
LPM:PD32 l2 D:PD31 lE l
NAME AKugler:db(W CJamerson @/
JHickman 9227 CACarpente@
DATE 10/ (o 198 - U 10/ (p /98
[]
10/ 8 /96 10/ 9 /98 f.
'TC]
OFFICIAL RECORD COPY Y
i, i
V j
Mr. Douglas R. Gipson Fermi 2 Detroit Edison Company 1
cc:
I John Flynn, Esquire 1
SeniorAttorney Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 i
Drinking Water and Radiological Protection Division Michigan Department of Environmental Quality l
3423 N. Martin Luther King Jr Blvd P. O. Box 30630 CPH Mailroom Lansing, Michigan 48909-8130 U.S. Nuclear Regulatory Commission i
Resident inspector's Office 6450 W. Dixie Highway Newport, Michigan 48166 Monroe County Emergency Management Division 963 South Raisinville i
Monroe, Michigan 48161 Regional Administrator, Region lll 1
U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351 i
Norman K. Peterson Director, Nuclear Licensing Detroit Edison Company Fermi 2 - 280 TAC l.
6400 North Dixie Highway Newport, Michigan 48166 l
l l
)
i August 1997 i