Forwards Safety Insp Repts 50-266/86-02 & 50-301/86-02 on 860203-04.No Violations Noted
ML20154L022
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/04/1986
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20154L024 List:
References
NUDOCS 8603110374
Download: ML20154L022 (2)


See also: IR 05000266/1986002

Text

-.. .

MAR .4 1986

Docket No. 50-266

Docket No. 50-301

Wisconsin Electric Power Company

ATTN: Mr. C. W. Fay

Vice Prcsident

Nuclear Power Department

231 West Michigan, Room 308

Milwaukee, WI 53201

Gentlemen:

This refers to the special safety inspection conducted by Messrs. R. Smeenge

and A. Gautam of this office on February 3 and 4,1986, of activities

at Point Beach Nuclear Power Station, Units 1 and 2, authorized by NRC

Operating Licenses No. DPR-24 and No. DPR-27 and to the discussion of our

.

findings with Mr. W. Herrman and others of your staff at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records,. observations, and

interviews with personnel .

No violations of NRC requirements were identified during the course of this

inspection; however, some unresolved items were identified that require

further NRC evaluation. -

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of

this letter and the enclosed inspection report will be placed 'in the NRC

Public Document Room.

We will ~ gladly discuss any questions you have concerning this inspection.

Sincerely.

. . . q. p;;; 57 J,~1 Drrion

..

J. J. Harrison, Chief

Engineering Branch

Enclosure: Inspection Reports

No. 50-266/86002(DRS);

86

No. 50-301/86002(DRS) j

631go

See Attached Distribution

( f\ W

S enge/kst Muffett

m

Gautam Jacki

ep+ nise Ha4r ison y

ao/< f

e ..

Wisconsin Electric Power Comany 2

g4

Distribution -

cc w/ enclosure:

J. J. Zach, Plant Manager ,

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

John J. Duffy, Chief

Boiler'Section

Ness Flores, Chairperson

Wisconsin Public Service

Comission