Forwards Errata for Project Status Repts Re Instrumentation & Controls & Hvac.Project Status Repts Transmitted Via TXX-88247
ML20154K969
Person / Time
Site: Comanche Peak  
Issue date: 05/20/1988
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
TXX-88462, NUDOCS 8805310102
Download: ML20154K969 (7)


Text

.

Log # TXX-88462 l===l' =

File # 10068 r9 10010 clo

=

Ref. # 10CfR50.9(a)

.r r

1UELECTRIC May 20, 1988

%illiam G. Counsil Execuans Voce hesMent U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.C.

20553

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL 0F PROJECT STATUS REPORT ERRATA Gentlemen:

Enclosed are fifteen (15) copies of the errata prepared for the following Project Status Reports (PSR):

1. Instrumentation and Controls
2. Heating, Ventilation arid Air Conditioning (HVAC)

Please place the errata tab and enclosure at the end of the appropriate PSR.

The Project Status Reports were previously transmitted via TXX-88247 dated February 18, 1988, respectively.

The Atomic Safety and Licensing Board will be notified of this transmittal by a separate letter from our attorneys.

Very truly yours, flV5%

W. G. Counsil JDS/bc Enclosures c - iir. R. O. Martin, Region IV Resident Inspectors, CPSES (3)

O lk l

8805310102 ee0520 i

PDR ADOCK 05000445

~

DCD 400 North Olive Dreet LB81 Dallas, Texas 73YI

Errata f)/

Heating, Ventilation and-Air Conditioning (HVAC) s PSR t

PSR Pacre Line/Ttem No.

Mrectic,n 5-16 19 Change "73" to "81" 24 Change "126" to "li'8" Table 5-3, ATP-87-02 Change "May 28, 1987" to page i "April 15, 1987" ATP-87-23 Change "Aug 5, 1987" to "July 31, 1987" ATP-87-31 Change "Sept 4, 1987" to "Aug 28, 1987" ATP-87-51 Change "Nov 23," to f

"Nov 17,"

i ATP-87-538 Change "Jan 15, 1988" to "Feb 2, 1988" Table 5-3, ATP-87-541 Change "Dec 16, 1987" to Page 2 "Dec 15, 1987" ATP-88-90 Change "Jan 25-29, 1987" to "Jan 25-29, 1988" TCP-87-45 Change "Jan 5, 1988" to "Dec 23, 1987" and "In c

Progress" to "Feb 15, 1988" New Add: "ATP-87-515, TU Elec TAP, Aug 10-28, 1987, Site, Sept 14, 1987, Oct 1, 1987" O _ _ _

. ~ - -.

j.

Errata p

Heating, Ventilation and Air Conditioning (HVAC)

%S PSR PSR Pace Line/ Item No.

Correct 19.D 6-2 18 Change "February 19" to "March 18" 6-3 32 Change "February 4" Al-2 4.6 to "February 2" A19-3 4.6 6-3 38 Change "February 12" to Al-3 4.12 "February 5" A19-3 4.12 A2-3 4.12 Change "Qualitative Walkdown A10-3 4.12 of HVAC Supports and Ducts A16-4 4.13 (Unit J. and Common Areas)"

A18-5 4.12 to "Qualitative Validation of HVAC Systems (Unit 1 and Common Areas)"

l 0 _.

_.... _.., _. _. _. _ _ _ _ _ _, _ _..... _, _, ~,.. _..,.. _ _ _,. _ _. _ _. _, _ _

-l Errata Instrumentation and Controls PSR i

l PSR Pace Line/ Item No.

Correction Table 5-4 Shie 3 Change "Stie 3" to "Site 3" Table 5-5 TUG 87-10 Change "05/15/87" to "07/06/87" ATP-87-17 Change "SWTU-2485" to "SWTU-2845" TCP-87-24 Change "08/14/87" to "10/30/87" O

TCP-87-27 Change "7291" to "7298" 6-4 65 Change "Reactor Control and Protection System" to "Reactor Protection and NSSS Related i

Control Systems" A4-3 4.6 Add "Instrument and Control B4-2 4.2 Manual," after "CPSES" BG-2 6

Change "TXX 88170" to "TXX 88013" O _

Errata h

Instrumentation and Controls PSR PSR Pace Line/ Item No.

Correction B10-2 4.2 Change "CPSES-I-1018" to l