Log # TXX-88462 l===l' =
File # 10068 r9 10010 clo
=
Ref. # 10CfR50.9(a)
.r r
1UELECTRIC May 20, 1988
%illiam G. Counsil Execuans Voce hesMent U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C.
20553
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL 0F PROJECT STATUS REPORT ERRATA Gentlemen:
Enclosed are fifteen (15) copies of the errata prepared for the following Project Status Reports (PSR):
- 1. Instrumentation and Controls
- 2. Heating, Ventilation arid Air Conditioning (HVAC)
Please place the errata tab and enclosure at the end of the appropriate PSR.
The Project Status Reports were previously transmitted via TXX-88247 dated February 18, 1988, respectively.
The Atomic Safety and Licensing Board will be notified of this transmittal by a separate letter from our attorneys.
Very truly yours, flV5%
W. G. Counsil JDS/bc Enclosures c - iir. R. O. Martin, Region IV Resident Inspectors, CPSES (3)
O lk l
8805310102 ee0520 i
PDR ADOCK 05000445
~
DCD 400 North Olive Dreet LB81 Dallas, Texas 73YI
Errata f)/
Heating, Ventilation and-Air Conditioning (HVAC) s PSR t
PSR Pacre Line/Ttem No.
Mrectic,n 5-16 19 Change "73" to "81" 24 Change "126" to "li'8" Table 5-3, ATP-87-02 Change "May 28, 1987" to page i "April 15, 1987" ATP-87-23 Change "Aug 5, 1987" to "July 31, 1987" ATP-87-31 Change "Sept 4, 1987" to "Aug 28, 1987" ATP-87-51 Change "Nov 23," to f
"Nov 17,"
i ATP-87-538 Change "Jan 15, 1988" to "Feb 2, 1988" Table 5-3, ATP-87-541 Change "Dec 16, 1987" to Page 2 "Dec 15, 1987" ATP-88-90 Change "Jan 25-29, 1987" to "Jan 25-29, 1988" TCP-87-45 Change "Jan 5, 1988" to "Dec 23, 1987" and "In c
Progress" to "Feb 15, 1988" New Add: "ATP-87-515, TU Elec TAP, Aug 10-28, 1987, Site, Sept 14, 1987, Oct 1, 1987" O _ _ _
. ~ - -.
j.
Errata p
Heating, Ventilation and Air Conditioning (HVAC)
%S PSR PSR Pace Line/ Item No.
Correct 19.D 6-2 18 Change "February 19" to "March 18" 6-3 32 Change "February 4" Al-2 4.6 to "February 2" A19-3 4.6 6-3 38 Change "February 12" to Al-3 4.12 "February 5" A19-3 4.12 A2-3 4.12 Change "Qualitative Walkdown A10-3 4.12 of HVAC Supports and Ducts A16-4 4.13 (Unit J. and Common Areas)"
A18-5 4.12 to "Qualitative Validation of HVAC Systems (Unit 1 and Common Areas)"
l 0 _.
_.... _.., _. _. _. _ _ _ _ _ _, _ _..... _, _, ~,.. _..,.. _ _ _,. _ _. _ _. _, _ _
-l Errata Instrumentation and Controls PSR i
l PSR Pace Line/ Item No.
Correction Table 5-4 Shie 3 Change "Stie 3" to "Site 3" Table 5-5 TUG 87-10 Change "05/15/87" to "07/06/87" ATP-87-17 Change "SWTU-2485" to "SWTU-2845" TCP-87-24 Change "08/14/87" to "10/30/87" O
TCP-87-27 Change "7291" to "7298" 6-4 65 Change "Reactor Control and Protection System" to "Reactor Protection and NSSS Related i
Control Systems" A4-3 4.6 Add "Instrument and Control B4-2 4.2 Manual," after "CPSES" BG-2 6
Change "TXX 88170" to "TXX 88013" O _
Errata h
Instrumentation and Controls PSR PSR Pace Line/ Item No.
Correction B10-2 4.2 Change "CPSES-I-1018" to l
"CPES-I-1018" B10-2 4.4 Change "Quality Control" to "NEO Quality Assurance Department" O
O 2
t
-