Monthly Operating Rept for Aug 1988 for Davis-Besse Nuclear Power Station
ML20154K869
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/31/1988
From: Cipriani J, Storz L
TOLEDO EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
KB88-00275, KB88-275, NUDOCS 8809260032
Download: ML20154K869 (6)


Text

_ _ _ _ _ _ _

REFUELING INFORMATION Date:

August 1988 1.

Name of facility:

Davis-Besse Unit 1 2.

Scheduled date for next refueling outage?

February 1990 3.

Scheduled date for restart from current refueling:

October 1988 4.

Vill refueling or resumption of operation thereafter require a technical specification change or other license amendment? If answer is yes, what in general vill these be? If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CTR Section 50.59)?

Ans: The Reload Report requires standard reload fuel design Technical 5pecifications changes (2. Safety Limits and Limiting Safety System Settings, 3/4.1 Reactivity Control Systems, 3/4.2 Pover_ Distribution Limits and 3/4.4 Reactor Coolant System.)

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

Submitted May 18, 1988 6.

Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

The highly absorbing silver-indium-cadmium axial power shaping a.

rods vill be replaced with reduced absorbing inconel rods.

b.

The discrete neutron sources vill be removed from the core and not

replaced, c.

The physics testing has been reduced in scope.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool, and (c) the new fuel storage areas.

l (a) 0 (b) 445 (e) 0 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

Present:

735 Increased size by: 0 (zero) 9.

The projected date of the last refueling that can be discharged to the j

spent fuel pool assuming the present licensed capacity.

1 I

Date:

1995 - assuming ability to unload the entire core into the spent fuel pool is maintained SSMunon gggg3 3

-Q. b gUR ADOCK 05000344 FDC y//

,e l

OPERATING DATA REPORT 50-346 DOCKET NO.

DATE -. sept. o. 1988 COMPLETED BY

a. vipnani TELEPHONE x4460 OPERATING STATUS g, y,gg g,

Davis-Besse. Unit No. 1 Not'S

^"""' 1900

2. Reporting Period.

I 2.772

3. Licensed Thennal Power (MWt):

925

4. Namepiste Rating (Grom MWe):

906

5. Dnign Electrksi Rating (Wt MWe):

904

6. Masimum Dependable Capecky (Gross MWe):

860 l

7. Masimum Dependable Capacity (%t MWe):
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since let Report, Gise Reasons:

l i

{

9. Power Level To Which Restricted.lf Any (Net MWe):
10. Reasons For Restrictions.lf Any:

i I

I f

f This Month Yr..toDete Cumulatise l

i 74' 5.855 88.511

11. Hours in Reporting Period 1
12. Number Of Hours Reactor Was Criticaj O.O 1.661.3 45,142.I 0.0 0.0 5.nso.1 t

)

13. Reactor Reserve Sheldown Hour, 1
14. Hours Generetor On Line 0.0 1.580 43,381 l

l$. Unit Reserve Shutdown Hou,,

0.0 0.0 1.732.5 i

j

16. Geom Thennal tnergy Generated (MWHI 0.0 3.306.442 101.268.641 l

0.0 33.448.288

]

17. Groes tlectrical Energy Generated (MWHI 1,072,485 0.0 99g,7g7 3g,yqq,434

{

18. Net Electrksi Energy Generated (M%H) 00 27.0 49.0 l
19. Unit Service Factor 0.0 27.0 51.o i
20. Unit Asailability Factor j
21. Unit Capacity Fatter (Using MDC Nt1 0. 0,,,,,,

i9,p 4i.t 0.0 18.8 39.0 l

22. Unit Capacity Factor (Using DER Net) 0.0 0.0 32.5*

[

]

23. Unit Forced Outage Rate

.4. Shutdowns Scheduled Over Nu 6 Months tType.Dete.and Duration of EachL f

Refueline 4 Started on March 10 1988 - 31 weeks - Ends on October 12. 198S

i l
25. If Shut Down At End Of Reprt P etod, Estimated Date of Startep:

cetober 12. 1988 1

16. Units la Test Stata IPnor to Commercial Operationi:

Forecast Achksed I

a

)

INITIA L CRITICA LITY j

t INITIAL ELECTRICITY l

f COMMERCIA L OPER ATION I

r

[

4 i

=

~

AVERAGE DAILY UNIT POWER LEVEL 50-346 DOCKET NO.

LHIT Davis Besse. Unit 1 Septeriber 15, 1988 DATE COMPLETED AY J. Cipriani TELEPHONE.X4460 MONTH August 1988 DAY AVER AGE D AILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL' (M%e Net) t yw,.3,g y I

17 O

o 18 0

0 3

19 0

0 4

20 0

o 5

)i 6

22 7

0 o

73 0

0 5

24 0

9 gg 0

10 26 0

0 o

ll

~

0 12

s 13 0

o

),

0 0

14 30 0

0 15 3

16 0

INSTRUCTIONS On this formai,ltst the aserage du!> unti n,#cr inet in Atwe. Net for each da) in the reputing m, oth. C.unrute to the nearest whtde rnegswatt.

i i

tutt ? )

i l

)

47m77 SMUTDO6MS AND PowtB mEDUCTIOceS ImC3ET sul.

50-146 SfMIT SEAME Deute-Seeee 1 0

1mTE Sept. 15. 1988 August 1988 camrta ED av J. caprs :

strosi vem 7tttemwt (u g) 2 W 5566 o=

3 f.i T.

c

e. a c.a = = 1-.

53

'e

]y3

~ g

.1r e.,

,,r.

E5 g

e3

.. t g

  • r 1-t o 2
a. pere a g-re

.e sw.rs==e y

2 88-03-10 S

744 C

1 N/A N/A N/A 1he unit outage which began on March 10. 1988 was still in progress through the end of August 1988.

See operational summary for further details.

'F:

Forced seeeee:

3Method:

'Enh1 bit C - Imotractione for Preparetten of Date

$2 Scheduled A-Equipment Fettere (Espleta) 1.Monuel Entry Sheets for Licemeee Eweet Report (LER) 8-N intemence er feet 2 h at Scram File (NUREC-Olet)

C-Refueltag 3-4. cometic Scree D-sagelstery teetriction 4-Continuettee from E-Operater freintag & t.tceae. Eme=1 met ten Frewtees 9 tooth Embibit I - Same Searco F-Adotalet tet two S-8,eed seduction esepert challenges to Feuer Operated Se11ef Velves C-Operettenal Frrer (Empleta) 9-Other (Esplein)

(F0 eve) med Pressuriser Code Safety Telwoo (FC$ve) se-Other (Esplein)

7

[

(

i l

OPERATI00tAL

SUMMARY

August 1988 Major Events Completed During Augusti Auxiliary feed pump turbine overspeed trip testing and pump to motor coupling and alignment Cooling tower maintenance Motor operated valve maintenance program Inservice inspections completed High pressure injection thermal sleeve repairs Condenser vacuum established Reactor coolant pump seals changed out The fifth refueling outage is scheduled to be complete on October 12, 1988.

The new end date is a result of two major plant modification durations being extended. The first mod, SFRCS, has been impacted by emergent items discovered during the post modification test process which requires engineering evaluation and disposition.

Second, thermal sleeve repairs have taken longer than anticipated due to difficulties experienced in velding the safe ends to piping nossles.

/

--~

TOLEDO

%em EDISON E DISON PLAZA 200 VAD 50N A/f NUE TOL L OO CH'0 43EG 0001 September 15, 1988 KB88-00275 Docket No. 50-346 1.icense No. NPF-3 Document Control Desk U. S. Nuclear Regulatory Commission Veshi.ngton, D. C.

20555 Gentlemen:

Monthly Operating Report, August 1988 Davis-Besse Nuclear Power Station Unit 1 Enclosed are ten copies of the Monthly Operating Report fot Davis-Besse Nuclear Power Station Unit No I for the month of August 1988.

If you have any questions, please contact Bilal Sarsour at (419) 249-5000, extension 7384.

Very truly yours, Qf '

// J,

//

,/

/ (j '{; g/ / g,f,s t' -

AM) c'f Louis F. Storz Plant Manager Davis-Besse Nuclear Power Station BHS/JEC/plg Enclosures cc:

Mr. A. Bert Davis Regional Administrator, Region III Hr. Paul Byron NRC Resident Inspector Mr. A. V. DeAgazio NRC Pr oject Har,ager fh I