ML20154K858

From kanterella
Jump to navigation Jump to search
Informs of Change in Characterization of Issue Discussed in NRC Insp Repts 50-313/98-15 & 50-368/98-15,dtd 980902.Repts Identified Exercise Weakness for Failure to Complete Initial Accountability within 30 Minutes of Site Area
ML20154K858
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 10/09/1998
From: Murray B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hutchinson C
ENTERGY OPERATIONS, INC.
References
50-313-98-15, 50-368-98-15, NUDOCS 9810190046
Download: ML20154K858 (4)


See also: IR 05000313/1998015

Text

'

a

e

'*

.

[g1ba nas ,k

_ ft

ut

UNITED STATES

c

NUCLEAR REGULATORY COMMISSION

-, , , .

o,

}

g g

REGION IV

%

%, * s . e * /[

. 611 RYAN PLAZA DRIVE, SulTE 400

AR LINGTON, TEXAS 760114064

OF - 9 bk

C. Randy Hutchinson, Vice President

Operations

Arkansas Nuclear One

Entergy Operations, Inc.

~1448 S.R. 333

Russellville, Arkansas 72801-0967

SUBJECT:

RESPONSE TO NRC INSPECTION REPORT 50-313; 368/98-15

Dear Mr. Hutchinson:

The purpose of this letter is to inform you of a change in the characterization of an issue

discussed in NRC Inspection Report 50-313; 368/98-15, dated September 2,1998. The report

identified an exercise weakness for failure to complete initial accountability within 30 minutes of

  • *

u

the site area emergency declaration (50-313; 368/9815-01). During a September 22,1998,

L

- conference call, your staff provided additional information concerning this issue. - As a result, we '

. have decided to refer the issue to the Office of Nuclear Reactor Regulation (NRR) for -

resolutior Accordingly, the issue will be tracked as an unresolved item, rather than an

inspection followup item, pending completion of NRR's review.

On September 24,1998, an extension to the response time for both exercise weaknesses was

. granted so that we could review the additional information concerning the accountability issue.

!

g

Since characterization of that issue has changed, a response to 50-313; 368/9815-01 is not

\\,j

necessary at this time. We will be in contact with you later regarding the dispositioning of this

matter.

-

i

Please proceed with the response to the exercise weakness concerning the failure to

i

l

implement proper radiological protection practices. We request a response within 14 oajs of

[;

. the date of this letter.

i

l

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter will be

i -

placed in the NRC Public Document Room.

l?.

i4

t k

p

4

V

f:

'-9910190046 981

?

_/

PDR :ADOCK Or ., ,13

-

, , l.

G

  1. 7

3.

< .

2 my-

,

.

Entergy Operations, Inc.

-2-

Should you have any questions concerning this letter or the inspection, we will be pleased to

discuss them with you.

-

Sincerely,

-

Blaine Murray, Chief

Plant Support Branch

Division of Reactor Safety

Docket Nos.: 50-313

50-368

License Nos.: DPR-51

NPF-6

cc:

Executive Vice President

.

& Chief Operating Officer

Entergy Open ons,Inc.

,

P.O. Box 3199t.

' Jackson, Mississippi 39286-1995

Vice President

Operations Support

Entergy Operations. Inc.

P.O. Box 31995

Jackson, Mississippi 39286

Manager, Washington Nuclear Operations

ABB Combustion Engineering Nuclear

Power

12300 Twinbrook Parkway, Suite 330

Rockville, Maryland 20852

County Judge of Pope County

Pope County Courthouse

Russellville, Arkansas 72801

Winston & Strawn

1400 L Street, N.W.

Washington, D.C. 20005-3502

.

.

-

7

  • ..; . . .:

. I

.-

-.;-

. j

_

- i

'

l

,

!<

Entergy Operations,' inc.

-3-

,

1

0~

JDavid D.1Snellings, Jr., Director

Division of Radiation Control and

~

,

' Emergency Management.

.

'

- Arkansas Department of Health-

" ' "

- 4815 West Markham Street, Mail Slot 30

Little Rock, Arkansas 72205-3867

l,

""- - Manager-

1

Rockville Nuclear Licensing

i

.Framatome Technologies

1700 Rockville Pike, Suite 525

'-

' Rockville, Maryland 20852

-

-

'

,

j

i

,

-}

I

4

.a

l

!

l

l

l

l .x

f

^

t

!-

\\

w

,.

,

.

.

a

!

.

.

>

,

?!

<

...

'

'7.--

_

, ,

w

_

y

y

- - - ~ .

.

.

..

_.

_-

.

_ . _ - - . _ _ _

._

_ _ .

-_ . . - _

.

.

.

. _ ,

'i

Entergy Operations, Inc.

-3-

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

f bcc to DCD (iE18I8*

b3[

P

bec distrib. by RIV:

4

Regional Administrator

Resident inspector

DRP Director

MIS System

'

Branch Chief (DRP/C)

RIV File

Project Engineer (DRP/C)

DRS-PSB

Branch Chief (DRP/TSS)

i

4

DOCUMENT NAME: R:\\_ANO\\AN815LR.GMG

To receive copy of document, Indicete in bor: "C" = copy without enclosures *E* = Copy with enclosures "N" = No copy

SEPA.

E.

C:PSB

.

E-

GMGood

foY4r

BMyrray 9

109d98

10E/98

\\

OFFICIAL RECORD COPY

100009

i