Forwards SALP Repts 50-313/87-41 & 50-368/87-41 for Jan 1987 - June 1988.Overall Performance Continued on Improving Trend.Specific Areas Deserving Merit Listed.Mgt Meeting Scheduled for 881021
ML20154J742
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 09/16/1988
From: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20154J747 List:
References
NUDOCS 8809230125
Download: ML20154J742 (3)


See also: IR 05000313/1987041

Text

-- -

-

.

<.

. Jn Reply Refer To:

Dockets: 50-313/87-41

50-5 3/87-41

SEP I 6 9B

Arkansas Power & Light Company

ATTN: Mr. Gene Campbell

Vice President, Nuclear

Operations

P.O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This forwards the report of the Systematic Assessment of Licensee Perfonnance

(SALP) for hkansas Nuclear One, Units 1 and 2. The SALP Board met on

August 16, 1988, to evaluate ANO performance for the seriod of January 1,1987,

'through Jure 30, 1988. The perfonnance analyses and resulting evaluations are

documented in the enclosed SALP Board Report.

In accordance with NRC policy, I have reviewed the SALP Board Assessment and

concur with their ratings. Since this assessment was conducted in accordance

with the recently revised NRC Manual Chapter 0516 with restructured functional

areas, direct comparison of some of the performance ratings in this report

with those in past SALP reports is not appropriate. However, while some

apparent weaknesses were identified, it is my view that the overall

performance at ANO has continued on an improving trend. Tiie following

ipecific areas merit highlighting:

1. The ratings in the functional areas of Plant Operations and Radiological

Controls continued the Category 1 performance from the previous SALP

'

period. This indicates strong individual performance as well as

effective management involvement in these areas.

2. The rating in the functional area of Emergency Preparedness improved to a

Category 1 from a previous Category 2 rating. Increased management

involvement has been effective in this area.

3. The rating in the functional area of security improved to a Category 2

from a previous Category 3 rating. Management attention, initiatives,

and involvement with security matters has improved, and I encourage

l

continued emphasis on this area.

4. The remaining three functional areas of Maintenance / Surveillance,

Engineering / Technical Support, and Sofety Assessment / Quality Verification

all received a Category 2 rating. A coninon theme through these areas was

weaknesses in root cause evaluations, narrow corrective actions, and

ineffective communications between maintenance and engineering. During

$bh

RIV:PSA

WM

SRI r

Ob $

C:PSA RR D: ( NRR

p

ATHowell WDJohnson DDChamberlain JCalvo RL ffart CHarbuck

//6/88 1 // b /88 ')//6 /88 9 //6 88 l9///, /88 1 //6/88 ,

\ 0:DRPc

R*.(h_in

Reconcur

DDChqmberlain

ilhoan RDMart .

L

//p/88 (,JCallan/g/88 '[ //p/88 9 //LV88

080923010S 000916 y I\

PDR ADOCK 05000313

G PNU

_

. - _ _ _ _ __ __ _ _

,+ . .

. - _- . .-

-

.

. Arkansas Power & Light Company 2

the SALP period, program changes were implemented in these areas and you

are encouraged to monitor and assess the effectiveness of these changes

during the present SALP period.

5. A decline in the timeliness and quality of licensee submittals in

response to NRC initiatives and for license amendments was noted during

this SALP period. Significant improverrant is needed in this area.

A management meeting is scheduled with you and your staff on October 21, 1988,

to rev' sew the results of this SALP report. Within 30 days of this management

meeting, you are requested to coment, in writing, to this office for all  ;

areas which received a SALP Category 2 rating.

Coments which you submit are not subject to the clearance )rocedures of the

Office of Management and Budget as required by the Paperwor( Reduction Act of

1980, PL 96-511.

'

A copy of your written coments will be included in the final distribution of  ;

the SALP report.

Sincerely. -

) Y k* 5

Robert D. Martin

Regional Administrator ,

Enclosure:

SALP Board Report 50-313/87-41

50-368/87-41 ,

cc w/ enclosure: Arkansas Nuclear One

ATTN: J. M. Levine, Director

Site Nuclear Operations

P.O. Box 608

Russellville, Arkansas 72801  ;

Arkansas Radiation Control Program Director

bectoDMB(IE40)

bec distrib. by RIV:

  • RRI *R. D. Martin, RA
  • RP8-DRSS *SectionChief(DRP/A)

Lisa Shea, RM/ALF *RIV File

  • DRP(3) * MIS System
  • RSTS Operator * Project Engineer DRP/A
  • C. Ilarbuck, NRR Project Manager *DRS

R. Bangart

all RRis (t all sites -J. Taylor, D/IE ,

'

Chairman L. W. Zech MS: 16-H-3

Com. T. M. Roberts MS: 16-H-3

'

,

I

. - - _ , = . . _ _ _ _ _ _ . . . , _ _ _ _ _ - - , , .

_

, _ _ _ _ . . . ._..-._,,._..__,,_._,_,.__.__._=._.,~,.,__m.,.~~_-.,_- _ . . - _ _ _

_ .. . _ - _-_ - ____--_ _ _ _-_______-_-_____-__ --_ - _____

,

'

.,  ;

\ :, *;

- Arkansas Power & Light Company -3-

Conn. F. H. Bernthal (MS: 16-H-3)

- Conn. - K. M. Carr. (rtS
16-H-3)

Comm. K. C. Rogers (MS: 16-H-3)

PAO, Region IV

G. Sanborn, E0, Region IV

Records Center, INP0

1100 Circle 75 Parkway, Suite 1500

Atlanta, GA 30339

,