Text
.-
-
.
.
-.
'"
3
..
.-
'
MAY 17 W
.
Docket / License: 50-245/0PR-21
Northeast Nuclear Energy Company
ATTN: 'Mr. Edward J. Mroczka
Senior Vice President - Nuclear
Engineering and Operations Group
P.O. Box 270
Hartford, Connecticut
06101-0270
Gentlemen:
Subject:
Resident Inspection 50-245/88-05 (3/22/88 to 4/25/88)
This forwards the report for the above subject inspection of Millstone 1.
The
results of the inspection were discussed with Mr. J. Stetz of your staff at the
conclusion of the inspection.
No violations were identified and no reply to this
letter is required.
In Report Detail 7, the as-found Containment Integrated Leak Rate Test was noted
to have fsiled.
In such cases, NRC review and approval of the subsequent test
schedule is required by 10 CFR 50 Appendix J.
Please submit, for review, your
CILRT schedule and the rationale therefor.
We have reviewed the responses in your April 14, 1988 letter addressing the re-
portability of inoperable APR check valves, as discussed in the violation forwarded
in our letter dated February 16, 1988. We have no further comment regarding your
corrective actions at this time. However, as discussed during the SALP management
meeting on April 28, 1988, apparent differences in the NRC and NNEC0 positions on
the reporting-criteria warrant further review.
This matter will be discussed fur-
ther with your staff incident to routine evaluations of event reporting.
Your cooperation with us is appreciated.
Sincerely,
crisinal 81saed 33
Lee H. Bettenhausen, Chief
Projects Branch No. 1
Division of Reactor Projects
Enclosure: NRC Region 1 Inspection Report 60-245/88-05
0FFICIAL RECORD COPY
DL50-245/88-05 - 0001.0.0
05/11/88
i
8805270115 880517
g/
ADOCK 05000245
s
Q
.- - -_.
_ . . _ .
. _ -
..
.
. . - - - . - .
--
-.
.
- _______
.
,.
.
MAY 171983
-
l
Northeast Nuclear Energy Company
2
-
,
i
I
cc w/ encl:
W. D. Romberg, Vice President, Nuclear Operations
R. M. Kacich, Manager, Generation Facilities Licensing
l
D. O. Nordquist, Manager of Quality Assurance
l
S. E. Scace, Station Superintendent
Public Document Room (PDR)
l
Local Public Document Room (LPOR)
l
Nuclear Safety Information Center (NSIC)
NRC Senior Resident Inspector
,
'
State of Connecticut
1
bec w/ encl:
i
Region I Docket Room (with concurrences)
l
Management Assistant, DRMA (w/o enclosures)
DRP Section Chief
l
R. Ferguson, LPM, NRR
W. Raymond, SRI, Millstone 1,2&3
R. Bores, DRSS
J. Golla, DRS
K. Eccleston, N,RR
M. Shanbaky, DRS (.see Detail 3.4)
J. Strosnider, DRS (see Detail 6)
C. Anderson, DRS (see Detail 7)
RI:DRP
RI:DRP
RI:DRP
/
d2
@
040 dF
Raymon#M
d/meo
McCabe
Bet enhausen
5/12/88
57q
s' q
OFFICIAL RECORD COPY
DL50-245/88-05 - 0002.0.0
05/11/88
-
-
- - . _ . _