ML20154J727

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-245/88-05 on 880322-0425.No Violation Noted
ML20154J727
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/17/1988
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20154J731 List:
References
NUDOCS 8805270115
Download: ML20154J727 (2)


See also: IR 05000245/1988005

Text

.-

-

.

.

-.

'"

3

..

.-

'

MAY 17 W

.

Docket / License: 50-245/0PR-21

Northeast Nuclear Energy Company

ATTN: 'Mr. Edward J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations Group

P.O. Box 270

Hartford, Connecticut

06101-0270

Gentlemen:

Subject:

Resident Inspection 50-245/88-05 (3/22/88 to 4/25/88)

This forwards the report for the above subject inspection of Millstone 1.

The

results of the inspection were discussed with Mr. J. Stetz of your staff at the

conclusion of the inspection.

No violations were identified and no reply to this

letter is required.

In Report Detail 7, the as-found Containment Integrated Leak Rate Test was noted

to have fsiled.

In such cases, NRC review and approval of the subsequent test

schedule is required by 10 CFR 50 Appendix J.

Please submit, for review, your

CILRT schedule and the rationale therefor.

We have reviewed the responses in your April 14, 1988 letter addressing the re-

portability of inoperable APR check valves, as discussed in the violation forwarded

in our letter dated February 16, 1988. We have no further comment regarding your

corrective actions at this time. However, as discussed during the SALP management

meeting on April 28, 1988, apparent differences in the NRC and NNEC0 positions on

the reporting-criteria warrant further review.

This matter will be discussed fur-

ther with your staff incident to routine evaluations of event reporting.

Your cooperation with us is appreciated.

Sincerely,

crisinal 81saed 33

Lee H. Bettenhausen, Chief

Projects Branch No. 1

Division of Reactor Projects

Enclosure: NRC Region 1 Inspection Report 60-245/88-05

0FFICIAL RECORD COPY

DL50-245/88-05 - 0001.0.0

05/11/88

i

8805270115 880517

g/

PDR

ADOCK 05000245

s

Q

DCD

.- - -_.

_ . . _ .

. _ -

..

.

. . - - - . - .

--

-.

.

- _______

.

,.

.

MAY 171983

-

l

Northeast Nuclear Energy Company

2

-

,

i

I

cc w/ encl:

W. D. Romberg, Vice President, Nuclear Operations

R. M. Kacich, Manager, Generation Facilities Licensing

l

D. O. Nordquist, Manager of Quality Assurance

l

S. E. Scace, Station Superintendent

Public Document Room (PDR)

l

Local Public Document Room (LPOR)

l

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

,

'

State of Connecticut

1

bec w/ encl:

i

Region I Docket Room (with concurrences)

l

Management Assistant, DRMA (w/o enclosures)

DRP Section Chief

l

R. Ferguson, LPM, NRR

W. Raymond, SRI, Millstone 1,2&3

R. Bores, DRSS

J. Golla, DRS

K. Eccleston, N,RR

M. Shanbaky, DRS (.see Detail 3.4)

J. Strosnider, DRS (see Detail 6)

C. Anderson, DRS (see Detail 7)

RI:DRP

RI:DRP

RI:DRP

/

d2

@

040 dF

Raymon#M

d/meo

McCabe

Bet enhausen

5/12/88

57q

s' q

OFFICIAL RECORD COPY

DL50-245/88-05 - 0002.0.0

05/11/88

-

-

- - . _ . _

_

-