ML20154J720

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-245/88-12 on 880719-0829.No Violations Noted.Matl Equipment Parts List Program Discussed in Util 880826 Response to Violation Will Be Discussed During Future Insps
ML20154J720
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/15/1988
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20154J726 List:
References
NUDOCS 8809230121
Download: ML20154J720 (2)


See also: IR 05000245/1988012

Text

'

/. ,

..

SEP 151988

Docket / License:

50-245/DPR 21

Northeast Nuclear Energy Company

ATTN:

Mr. Edward J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations Group

P.O. Box 270

Hartford, Connecticut

06101-0270

Gentlemen:

Subject:

Resident Inspection 50-245/88-12 (7/19/88 to 8/29/88)

The enclosed report documents the aa ve subject inspection of Millstone 1.

The

inspection results have been discussed with Mr. J. Stetz of your staff. No viola-

tions were identified and no reply to this letter is required.

We have received your August 26, 1988 letter responding to the violation involving

nonadherence to th: Administrative Control Procedure (ACP) for the Material Equip-

ment Parts List (MEPL). While reviewing your corrective actions, we noted that

your staff identified a probiem involving timely auditing of the MEPL in accordance

with NEO 6.10.

After subsequent meetings with Millstone 1 management and other

members of your staff, we concluded that no safety concerns are apparent at this

time.

The MEPL program will be given further attention during future inspections.

We have received your July 29, 1988 letter which describes your plan to improve

the Millstone 1 emergency operating procedures. We will continue to evaluate this

e f f o ri. .

Thank you for your cooperation.

Sincerely,

ORGtMt. 51GNED BY

t.Et it. OETTENMUSEN

Lee H. Bettenhausen, Chief

Projects E; ranch No.1

Division of Reactor Projects

Enclosure: NRC Region ! Inspection Report 50-245/88-12

1

$$"M$

7

o

0FFICIAL RECORD COPY

DL50-245/88-12 - 0001.0.0

g(

09/13/83

,

n.

.s,

,.

,

Northeast Nuclear Energy Company

2

cc w/ enc 1:

W. D. Romberg, Vice President, Nuclear Operations

R. M. Kacich, Manager, Generation Facilities Licensing

D. O. Nordquist, Director of Quality Services

S. E. Scace, Station Superintendent

Public Document Room (PDR)

local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enclosures)

DRP Section Chief

M. Boyle LPM, NRR

R. Bores, DPSS

C. VanDenburgh, NRR (Section 6.0)

R. Kiessel, NRR (Section 7.0)

1

i

RI:DRP

RI:DRP

RL RP

(Py

(9

%

'

'

Raymond/meo

McCabe

13ehY$ausen

9/15/88

"M

Q/ff/ff

0FFICIAL RECORD COPY

DL50-245/83-12 - 0002.0.0

09/13/83

-

- - -

- -

-