ML20154J610

From kanterella
Jump to navigation Jump to search
Forwards Effluent Semiannual Rept,Jul-Dec 1985. Analysis for Sr-89,Sr-90 & Fe-55 Incomplete for Fourth Quarter 1985. Rept for Isotopes Will Be Submitted When Available
ML20154J610
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 03/01/1986
From: Fey F
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20154J614 List:
References
NUDOCS 8603100680
Download: ML20154J610 (1)


Text

.. g/7 1) Af d e

Northern States Power Company 414 Nicollet Mall Minneapoks, Minnesota 55401 Telephone (612) 330-5500 March 1, 1986 nie m y neutInc

? ~V?S__

9 l1-1g-Regional Administrator Region III ct- t/ C- --Wr 5 en U S Nuclear Regulatory Comission flu M 799 Roosevelt Road Glen Ellyn, Illinois 60137 Prairie Island Nuclear Generating Plant Docket No. 50-282 License No. DPR-42 50-306 DPR-60 Effluent and Waste Disposal Semi-Annual Report for July 1,1985 through December 31, 1985 In accordance with the Prairie Island Technical Specifications, Appendix A to Operating License DPR-42 and DPR-60, we are submitting one copy of the Effluent and Waste Disposal Semi-Annual Report, covering the last half of 1985.

Analyses for isotopes, Sr-89, Sr-90 and Fe-55 were not completed for Quarter 4 in time to be included in this report. A separate submittal will be made when they are available.

I

'M A)

F. L. Fey, Jr., General Superintendent Radiological Protection and Chemistry Nuclear Generation Department Attachment cc: U. S. NRC, Document Control Desk (1)

G. Charnoff (w/o attachment)

MPCA -

Attn: J W Ferman Resident Inspector, U S NRC Project Manager, U S NRC Bert Clark M_

8603100680 860301 zzzi ,

PDH ADOCK 05000282 R PDR BWC022186GDWO3 MAR 5 1986