September 15, 1988 Docket No. 50-267
,i i
Ma, R. O. Williams, Jr.
Vice President, Nuclear Operations Public Service Cortpany of Colorado Post Office Box 840 Denver, Colorado 80201-0840
Dear Mr. Williams:
SUBJECT:
CORRECTION 10 AUGUST 30, 1988 LETTER We have noted that Enclosure 1 to cur letter of August 30, 1988 concerning the Fort St. Vrain schedule ccanitment items was incorrect. We r
have enclosed a correct version of Enclosure I with this letter. We apologize-I for problezn caused by this error.
Sincerely,
/s/
Kenneth L. Heitner, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects
Enclosure:
As stated 1
cc w/ enclosure:
See next page l
t DISTRIBUTION bocket. File-NFC PDR Local PDR PD4 Re: ding L. Rubenstein J. Calvo P. Noonan K. Feitner 0GC-Rockville E. Jordan B. Grimes ACRC(10)
PD4 Plant File l
PD4/LA PD4/PM M PD4/D 8 PNoonan l'
KHeitner:sr JCalvo l
09/ 19 88 09/ f/88 09//f/88 l
0@'
8809230055 880915 PDR ADOCK 05000267 P
PDC a
m..
September 15, 1988
\\
Docket No. 50-267 Mr. R. O. Williams, Jr.
Vice President, Nuclear Operations Public Service Company of Colorado Post Office Box 840 Denver, Colorado 80201-0840
Dear Mr. Williams:
I
SUBJECT:
CORREC'.10N TO AUGUST 30, 1988 LETTER l
We have noted that Enclosure 1 to our letter of August 30, 1988 concerning the Fort St. Vrain schedule coninitment items was incorrect. We have enclosed a correct version of Enclosure I with this letter. We apologize 1
for problems caused by this error.
Sincerely, 1
i
/s/
.Kenneth L. Heitner, Project Manager Pro.iect Directorate - IV Division of Reactor Projects - III, i
IV, V and Special Projects l
Enclosure:
As stated cc w/ enclosure:
See next page DISTRIBUTION Docket File NRC PDR
' ocal PDR PD4 Reading L. Rubenstein J. Calvo P. Noonan X. Heitner OGC-Rockville E. Jordan B. Grimes ACRS (10)
PD4 Plant File l
PD4/LA PD4/PM PD4/D M PNoonan M
KHeitner:sr JCalvo 09/ 19 88 09/;f788 09// /88
/
(
a nouq'o, UNITED STATES g',
.g NUCLEAR REGULATORY COMMISSION s
j WASHINGTON, D. C. 20666 kg.....,/
September 15, 1988 1
Docket No. 50-267 Mr. R. G. Williams, Jr.
Vice President, Nuclear Operations Public Service Company of Colorado Post Office Box 840 Denver, Colorado 80201-0840
Dear Mr. Williams:
SUBJECT:
CORRECTION TO AUGUST 30, 1988 LETTER We have noted that Enclosure I to our letter of August 30, 1988 concerning the Fort St. Vrain schedule comitment items was incorrect. Ve have enclosed a correct version of Enclosure I with this letter. We apologize for problems caused by this error.
Sincerely,
% J L,- W Kenneth L. Heitner, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, Y and Special Projects
Enclosure:
As stated cc w/ enclosure:
See next page L
s Mr. R. O. Williams, Jr.
Public Service Cortpany of Colorado Fort St. Vrain cc:
Mr. D. W. Warembourg, Manager Albert J. Hazie, Director Nuclear Engineering Division Radiation Centrol Division Public Service Company
. Department of Health of Colorado 4210 East lith Avenue P. O. Box 840 Denver, Colorado 80220 Denver, Colorado 80201-0840 Mr. David Alberstein, 14/159A Mr. R. O. Williams, Jr., Acting Vanager GA Technologies, Inc.
Nuclear Production Division Post Office Box 85608 Public Service Company of Colorado San Diego, California 92138 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Mr. H. L. Brey, Panager Nuclear Licensing arid Fuel Division Fr. P. F. Tomlinson, Manager Public Service Company of Colorado Cuality Assurance Division P. O. Box Sa0 Public Service Company of Colorado Denver, Colorado 80201-0840 16805 Weld County Road 19-1/?
Platteville, Colorado 80651 Senior Resident Inspector U.S. Nuclear Regulatory Comission Mr. R. F. Walker P. O. Box 640 Public Service Company of Colorado Platteville, Colorado 80651 Post Office Box 840 Denver, Colorado 80201-0840 Kelley, Stansfield & 0' Dor.ne11 Public Service Company Building Comittnent Control Progran Room 900 Coordinator 550 15th Street Public Service Company of Colorado Denver, Colorado 80F02 24?0 W. 26th Ave. Suite 100-0 Denver, Colorado 80211 Regional Administrator, Region IV V.S. Nuclear Regulatory Comission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Chairinan, Board of County Comissioners of Weld County, Colorado Greeley, Colorado 80631 Regional Representative Psdiation Programs Environmental Protection Agency 1 Denver Place 999 18th Street, Suite 1300 Denver, Colorado 80202-2413
Revision 7 PUBLIC SERVICE COMPANY OF COLORADO COMMITMENTS
~
RIl.l M 'TIIE D7thAT10h 0F THE g,R,T,hLRAJLN_UCLEAR GEhlkATThT3TATION
~~-
Item Comitment Dese,r,ip,tio_n],Reguir,emen,t Schedule (Reference) 1.
Provide status reports on the Nuclear Approximately Perform.ahtu Enhancement Program on an annually annual basis.
(P-88031) 2.
Ir.plement the Technical S Upgrade Program (P-85098)pecifications (TS) a.
Frovide a revised final draft proposal Complete of the Upgraded TS for NRC connent.
(P-87063) b.
Submit a license arendment to 90 days after incorporate the Upgraded TS. (P-85?43)
NRC connents on Item 2a c.
In;plement the Upgraded TS. (P-85243)
Approximately ath refueling i
outage (License amendnent will l
define) 3.
Incrcse control red and reserve shutdown (SeeItem2) reliability.
Incorporate the interim Technical Specifications in the Upgrade Program.
4.
Develop a plan to implement approved Annually inodifications to control moisture ingress and submit annual reports on progress.
(P-85022 and F-85082) 5.
Evaluate control of moisture in CRDM purge 4th refueling system.(P-85021) outage 6.
PCRV Tendon Surveillance Requirements:
a.
Incorporate the revised Tendon Surveillance (SeeItem2)
Program into the Technical Surveillance (P-85199).
l b.
Provide the results of the revised Approximately program to the NRC.
anmrally 9
t a
Revision 7 Page 2 7.
Provide an improved CRDM surveillance Five months program which includes consideration of after the start CRDM operational testing.
(P-88012) of 4th refueling outage 8.
Fire Protection Modifications:
a.
Perform emergency lighting Complete by 3/1/68 modifications (P-88030) b.
Perform modifications involving Startup following ACM backf eed. permanent turbine 4th refueling water removal pump, and valve outage operability (P-87013).