ML20154J358

From kanterella
Jump to navigation Jump to search
Forwards Confirmatory Measurements Insp Rept 50-029/88-15 on 880815-18.No Violations Noted.Data from Measurements Obtained in Mobile Lab Will Be Reported in Subsequent Insp Rept
ML20154J358
Person / Time
Site: Yankee Rowe
Issue date: 09/12/1988
From: Bellamy R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Drawbridge B
YANKEE ATOMIC ELECTRIC CO.
Shared Package
ML20154J361 List:
References
NUDOCS 8809230003
Download: ML20154J358 (2)


See also: IR 05000029/1988015

Text

DCf

.' /

-

SEP 1219BB

1

Docket No. 50-29

Yankee Atomic Electric Company

ATTN: Mr. Bruce L. Drawbridge

l Vice President and Manager

I of Operations

l 1671 Worcester Road

l Framingham, Massachusetts 01701

Gentlemen:

Subject: Inspection No. 50-29/88-15

This refers to the routine confirmatory measurements inspection conducted by

Mr. J. J. Kottan of this office on August 15-18, 1988 at the Yankee Nuclear

Power Station, Rowe, Massachusetts of activities authorized by NRC License No.

CRP-3 and to the discussions of our findings held by Mr. J J. Kottan with

Mr. N. St. Laurent and others of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the NRC Region !

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

In addition, our Mobile Laboratory was also brought to your site and used by

the inspector to make certain independent measurements. The basic purpose of

these independent measurements is to verify your capability for analyzing

radioactive effluents, and to achieve and maintain comparable methods of

analyses between your facility and the NRC. The complete data from these

measurements will be reported in a subsequent Inspection Report.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely.

0:i tinal Signed By:

RwMd R. Bdumf

Ronald R. Bellamy. Chief

Facilities Radiological Safety

and Safeguards Branch

Division of Radiation Safety

and Safeguards

OFFICIAL RECORD COPY IR YANKEE 88-15 - 0001.0.0 ..

eso9230003 eso912 08/26/88 p na "j f * ih

PDR A00CK0500gg9 f3 g

a au .

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

. ,' /

Yankee Atomic Electric Company 2 SEP 121939

.

Enclosure: NRC Region ! Inspection Report Number 50-29/88-15

cc w/ encl:

J. E. Tribble, President

, N. N. St. Laurent, Plant Superintendent

G. J. Papanic, Jr., Senior Project Engineer - Licensing

P. W. Agnes, Assistant Secretary of Public Safety, Comonwealth of

Massachusetts

,

Public Document Room (POR)

local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Comonwealth of Massachusetts

] ,

bec w/ encl:

Region I Occket Room (with concurrences)

M. Perkins, Management Assistant, ORMA (w/o encl)

D. Haverkamp, Section Chief, DRP

!,

H. Eichenholz, SRI - Yankee (w/ concurrences)

f G. Grant, SRI - Vermont Yankee

! R. Bores, Technical Assistant, DRSS

I

M. Fairtile, PM, NRR

j K. Abraham, PA0 (8) ($ ALP Reports Only)

!

i

l

,

i l

.;

I L

,

i 1

J

J

!

? .

v4

!

'

RI:0RSS R S RI:0RSS

Kg g /pmb [P $ ak Bellamy

i f8/ t/SS 9/gv/88

9/}/88

0FFICIAL RECORD COPY IR YANKEE 8A-15 - 0001.1.0

j 08/26/88

,

1

l

4