ML20154H832
| ML20154H832 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 05/19/1988 |
| From: | NORTHEAST NUCLEAR ENERGY CO. |
| To: | |
| Shared Package | |
| ML20154H808 | List: |
| References | |
| NUDOCS 8805260081 | |
| Download: ML20154H832 (1) | |
Text
.
CONTAINMENT SYSTEMS SVRVEILLANCE RE0VIREMENTS 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:
a.
1)
Within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> following each closing, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying no detectable seal leakage by pressure decay when the volume between the door seals is pressurized to greater than or equal to P, 54.1 psia (39.4 psig), for at a
least 15 minutes; or 2)
Within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> following each closing, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying that the seal leakage is less than 0.01 L
as determined by precision flow measurements when measured f8r at least 30 seconds with the volume beween the seals at a constant pressure of 54.1 psia (39.4 psig);
or 3)
Within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> following each closing, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by completing an overall air lock leakage test per 4.6.1.3.b.
b.
By conducting overall air lock leakage tests at not less than P@e, 54.1 psia (39.4 psig), and verifying the overall air lock leaka rate is within its limit:
1)
At least once per 6 months,* and 2)
Prior to establishing CONTAINMENT INTEGRITY when maintenance has been performed on the air lock that could affect the air lock sealing capability.**
c.
At least once per 6 months by verifying that only one door in each air lock can be opened at a time.
- The provisions of Specification 4.0.2 are not applicable.
- This represents an exemption to Appendix J, paragraph III.D.2.(b)(ii), of 10 CFR Part 50.
un i cmur. IINIT '4 3/4 6-6 8805260081 880519 PDR ADOCK 05000423 P
EqCTal