OPERATING DATA REPORT (Revised Data)
DOCKET NO. 50-336-DATE 9/7/88 COMPLETED BY J. Gibson TELEPHONE (203)447-1791 Extension 4431 OPERATING STATUS 1.
Unit Name: Millstone Unit 2 lNetes: Items 21 and 22 cumulative l 2.
Reporting Period: July 1988 (Revised) l are weighted averages.
l 3.
Licensed Thermal Power (MWt): 2700 l'
Unit operated at 2560 MW l 4.
Nameplate Rating (Gross MWe): 909 l
Thermal prior to its l
5.
Design Electrical Rating (Net MWe): 870 l
uprating to the current l
6.
Maximum Dependable Capacity (Gross MWe):893.88; 2700 MWTH power level.**
l 7.
Maximum Dependable Capacity (Net MWe): 862.88 l l
8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A 10.
Reasons For Restrictions, If Any:
N/A This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744 5,111 110,447 12.
Number Of Hours Reactor Was Critical 744 3,306 80,686.3 13.
Reactor Reserve Shutdown Hours 0
0 0
14.
Hours Generator On-Line 744 3,174.5 76,427.5 15.
Unit Reserve Shutdown Hours 0
0 468.2
- 16. Gross Thermal Energy Generated (HWH) 2,008,427 8,306,372 al_2,868,634
- 17. Gross Elec. Energy Generated (MWH) 666,447 2,742,908 63,614.487 18.
Net Electrical Energy Generated (MWH) 643.491 2,629,107 61,005,645 19.
Unit Service Factor 100.0 62.1 69.2 20.
Ur.it Availability Factor 100.0 62.1 69.6 21.
Unit Capacity Factor (Using MDC Net) 100.2
- 59.9 65.2 22.
Unit Capacity Factor (Using DER Net) 99.4
- 59.1 6471 23.
Unit Forced Outage Rate 0.0 18.3 15.3 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Tach):
N/A 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A 26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
- Revised Data
- NOTE:
Item 21 Year-To-Date is a weighted average as a result of the capacity rating change.
8009220095 8E(1912 PDR ADOCK 05000336 R