ML20154H665

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Aug 1988 for Millstone Unit 2 & Revised Rept for Jul 1988
ML20154H665
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/12/1988
From: Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20154H668 List:
References
MP-12227, NUDOCS 8809220091
Download: ML20154H665 (1)


Text

_

e s

NORTHEAST UTILITIES coner.i Omc.. seio n streei. Bernn. Conne.+ cat 9

2.Y.CIIEe$NUII P.O. BOX 270

.m..i.e

.cw*-

HARTFORD. CONNECTICUT o6141 o.M A6

Zl' iOMC'.'CI.

(203) 66 5 5000 Septater 12, 1988 MP-12227 Re:

10CFR50.71(a)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Reference:

Facility Operating License No. DPR-65 Docket No. 50-336'

Dear Sir:

This letter is forwarded to' provide the report of operating and shutdown experience relating to Millst:ae Unit 2 Monthly Operating Report 88-08 in accordance with Appendix A Technical Specifications, Section 6.9.1.6.

One additional copy of the report is enclosed.

Also attached is a revision for the July 1988 Operating Data Report sheet.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY litj 61t V

/

Step n E. Scace Station Superintendent Millstone Nuclear Power Station SES/JG: lj s cc:

W.T. Russell, Region I Administrator W.J. Raymond, Senior Resident inspec'or, Millstone Unit Nos.1, 2 & 3 u

$9220091 800912 R

ADOCK o*:,0co33$

\\

PDC 8

l t