ML20154H526

From kanterella
Jump to navigation Jump to search
Page 3 of Emergency Plan Implementing Procedure HP/1/B/1009/17
ML20154H526
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 02/28/1986
From:
DUKE POWER CO.
To:
Shared Package
ML20154H512 List:
References
HP-1-B-1009-17, NUDOCS 8603100313
Download: ML20154H526 (2)


Text

.-. _.

j HP/1/B/1009/17 Pagn 3 of 3 5.0 ' ENCLOSURES 5.1 RPPM PACS Checklist 5.2 Post-Accident Containment Air Sampling Set-Up 5.3 Taking Post-Accident Containment Air Samples 5.4 Sample of Post-Accident Containment Air Sample Data Sheet 5.5 Post-Accident Containment Air Sampling Shut-Down 5.6 Post-Accident Containment Air Sampling Control Panel (PACP) Diagram 5.7 Post-Accident Containment Air Sampling Sample Panel (PASP) Diagram 5.8 Location of PACP and PASP O

O 8603100313 86022B ADOCK 0 % g 3 PDH F

HP/1/B/1009/17 Pagn 3 of 3 5.0 ENCLOSURES 5.1 RPPM PACS Checklist 5.2 Post-Accident Containment Air Sampling Set-Up 5.3 Taking Post-Accident Containment Air Samples 5.4 Sample of Post-Accident Containment Air Sample Data Sheet 5.5 Post-Accident Containment Air Sampling Shut-Down 5.6 Post-Accident Containment Air Sampling Control Panel (PACP) Diagram 5.7 Post-Accident Containment Air Sampling Sample Panel (PASP) Diagram 5.8 Location of PACP and PASP O

O c