ML20154H462

From kanterella
Jump to navigation Jump to search

Forwards Amends 225 & 229 to Licenses DPR-44 & DPR-56 & Se. Amends Would Revise TSs to Permit Incorporation of EOC-RPT Sys at Plant,Units 2 & 3
ML20154H462
Person / Time
Site: Peach Bottom  
Issue date: 10/05/1998
From: Thadani M
NRC (Affiliation Not Assigned)
To: Geoffrey Edwards
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20154H466 List:
References
TAC-MA1344, TAC-MA1345, NUDOCS 9810140201
Download: ML20154H462 (3)


Text

- -. -.. _ _ _. _. _..... _. _

October 5, 1998 4

y Mr. GErrett D. Edwards Director-Licensing, MC 62A-1 PECO Energy Company Nuclear Group Headquarters Correspondence Control Desk P.O. Box No.195 Wayne, PA 19087-0195

SUBJECT:

LICENSE CHANGE SUPPORTING THE INCORPORATION OF ENDCF-CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) SYSTEMS AT PEACH BOTTOM ATOMIC POWER STATION, UNIT NOS. 2 AND 3 (TAC NOS. MA1344 AND MA1345)

Dear Mr. Edwards:

The Commission has issued the enclosed Amendments Nos. -225 and 229 to Facility Operating License Nos. DPR-44 and DPR-56 for the Peach Bottom Atomic Power Station (PBAPS), Unit Nos. 2 and 3. These amendments consist of changes to the Technical Spec;ficetions (TSs) in response to the PECO Energy Company's (the licensee's) application dated March 20,1998; as revised by the letters dated June 26, August 11, and September 14, 1998. The revised information included an updated no significant hazards consideration determination, which was found by the staff to be weak.

)

)

These amendments would revise the TSs to permit incorporation of EOC-RPT systems at i

l PBAPS, Units 2 and 3.

A copy of the safety evaluation is also enclosed. Notice of Issuance will be included in the

. Commission's Biweekly Federal Reaister Notice.

Sincerely, C. Thadani, Senior Project Manager Project Directorate 1-2 e

9810140201 981005 PDR ADOCK 05000277 Division of Reactor Projects-t/il P

PDR Office of Nuclear Reactor Regulation Docket Nos. 50-277/278

Enclosures:

1. Amendment No. 225 to DPR-44
2. Amendment No. 229 to DPR-56 gg (( {${i][jbf
3. Safety Evaluation I

cc w/encis: See next page DISTRIBUTION:

Docket File MO'Brien GThomas JWermiel PUBLIC ~

MThadani ACRS TCollins PDI-2 Reading OGC CAnderson, RGN-l BBoger GHill(4)

THarris (E-Mail SE)

RCapra afW8eckner FGee

[hM Fh0h HICB/BQ SRXB/BC OG(hd ! PDl-2/D OFFICE ih[n JMfel TCollink MC'/MA R$apra NAME MThadani:mw n

0/rfM98 i/bl/98 9 /d/98

'I $/98 b3/ /98 DATE 4 /2//98

\\

OFFICIAL RECORD COPY

\\~

gg DOCUMENT NAME: a:\\PBMA1344.AMD T

1d?004

l' l.

Mr. Garrett D. Edwards Peach Bottom Atomic Power. Station, PECO Energy Company Units 2 and 3 cc:

J. W. Durham, Sr., Esquire Chief-Division of Nuclear Safety Sr. V.P. & General Counsel PA Dept. of PECO Energy Company Environmental Resources 2301 Market Street, S26-1 P.O. Box 8469 Philadelphia, PA 19101 Harrisburg, PA 17105-8469 PECO Energy Company ATTN: Mr. J. Doering, Vice President Board of Supervisors Peach Bottom Atomic Power Station Peach tsottom Township 1848 Lay Road R.D.#1 Delta, PA 17314 Delta, PA 17314 PECO Energy Company Public Service Commission of Maryland ATTN: Regulatory Engineer, A4 SS Engineering Division Peach Bottom Atomic Power Station Chief Engineer 1848 Lay Road 6 St. Paul Centre Delta, PA 17314 Baltimore, MD 21202-6806 Resident inspector Mr. Richard McLean U.S. Nuclear Regulatory Commission Power Plant and Environmental Peach Bottom Atomic Power Station Review Division P.O. Box 399 Department of Natural Resources Delta, PA 17314 B-3, Tawes State Office Building Annapolis, MD 21401 Regional Administrator, Region i U.S. Nuclear Regulatory Commission Dr. Judith Johnsrud 475 Allendale Road National Energy Committee King of Prussia, PA 19406 Sierra Club.

, 433 Orlando Avenue Mr. Roland Fletcher State College, PA 16803

, Department of Environment 201 West Preston Street Manager-Financial Control & Co-Owner Baltimore, MD 21201 Affairs Public Service Electric and Gas A. F. Kirby,111 Company Extemal Operations - Nuclear P.O. Box 236 Delmarva Power & Light Company Hancocks Bridge, NJ 08038-0236 P.O. Box 231 Wilmington, DE 19899 Manager-Peach Bottom Licensing PECO Energy Company PECO Energy Company Nuclear Group Headquarters Plant Manager Correspondence Control Desk Peach Bottom Atomic Power Station P.O. Box No.195 1848 Lay Road Wayne, PA 19087-0195 Delta, PA 17314

y?

4 i

1 8

i UNITED STATES 5

NUCLEAR REGULATORY COMMisslON 4

f WASHINGTON, D.C. 6

.....f Octber 5, 1998 Mr. Garrett D. Edwards i'

Director-Licensing, MC 62A-1 PECO Energy Company l

Nuclear Group Headquarters Correspondence Control Desk w

. P.O. Box No.195 Wayne, PA 19087-0195 i

SUBJECT:

LICENSE CHANGE SUPPORTING THE INCORPORATION OF ENNF-CYCLE RECIRCUl.ATION PUMP TRIP (EOC-RPT) SYSTEMS AT PEACH BOTTOM ATOMIC POWER STATION, UNIT NOS. 2 AND 3 (TAC NOS. MA1344 AND i

MA1345)

Dear Mr. Edwards:

The Commission has issued the enclosed Amendments Nos. 225 and 229 to Facility Operating License Nos. DPR-44 and DPR-56 for the Peach Bottom Atomic Power Station

~

(PBAPS), Unit Nos. 2 and 3. These amendments consist of changes to the Technical Specifications (TSs) in response to the PECO Energy Company's (the licensee's) application dated March 20,1998; as revised by the letters dated June 26, August 11, and September 14, i

1998. The revised information included an updated no significant hazards consideration determination, which was found by the staff to be weak.

J These amendments would revise the TSs to permit incorporation of EOC-RPT systems at PBAPS, Units 2 and 3.

l A copy of the safety evaluation is also enclosed. Notice of Issuance will be included in the i

Commission's Biweekly Federal Reaister Notice.

Sincerely, ohan C. Thadani, Senior Project Manager Project Directorate 1-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50 277/278

Enclosures:

1. Amendment No. 225 to DPR-44
2. Amendment No. 229 to DPR-56
3. Safety Evaluation c w/encis: See next page