ML20154H183

From kanterella
Jump to navigation Jump to search
Notification of Contract Execution,Mod 12,to Operation of CNWRA - Ffrdc. Contractor:Southwest Research Inst
ML20154H183
Person / Time
Issue date: 09/13/1988
From: Mace M
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
To: Bunting J, Funches J
NRC, Office of Nuclear Reactor Regulation
Shared Package
ML20154H188 List:
References
CON-NRC-02-88-005, CON-NRC-2-88-5 NUDOCS 8809210207
Download: ML20154H183 (3)


Text

- . " .

' Phf tsc eons 256 coNTc Act NUw8I o w ,

"*M' NRC-02-88-005 -

DivittoN 0f CONTRACTS uooit eC Af SON NUW8( A U.S. NUCLE A A ALGUL Atony CCMutS5 TON WA5HINcToN. o.C. 20555

. O New D uoostsCATeo*

OTM(A t h dri NOTIFICATION OF CONTRACT EXECUTION To: Jesse L. Funches, Director g g ,f AUTHORS 2 ATION NUuet a -

  • Program Management, Policy Development and Analysis Staff NMSS oAft to,,a.oso as Fn w Jutw J dub - U Mt'ry ,jl. Mace /

e& der

' '

  • t'l Accelerate Program Architecture Contfact Administrator and revise authorized funding Division of Contracts and Procerty Manacement, ARM CONTAe.CTon (Name d Le. cerea / E x tCVTeoN O ATE Southwest Research Institute 6220 Culebra Road TvPt of coNTm ACT San Antonio, Texas 78284 CPAF PROJECT TITLE P( AICO Of PE Rf ORM ANCE Operation of the Center for Nuclear Waste 5 years '

Regulatory Analyses - FFRDC ra NCiPAL 'Nve5Tsc4 Tom .

N/A NRC AUTHORIZEO M(PR($(NT ATIV(

). Bunting eamNuu8 a FIN NUMBER

  1. 0" AII4Wf0 ATTfD'.CD NEW NRC FUNOS $

FLINDING T O T A t. F Y FUNDING s 4,971,200 TOTAt. NRC O9LIG ATIONS $ 4.971,200 -

Govt 4Nuf 4T PRO *E MTV ,

ATT ACH u( NTISI:

Mo,d 12

  • -8 CONT A ACT DOCUu(NT I naccomu m 2kk GSO913 , g NRC-02-G8-005 PDC i '

I j'

Element /

Milestone Subelement-Number Task No. Damerietion EIRE 12 34c E.C.R,Q,S Input Documents Reviewed and Tech. 1/27/89 8/25/89 Task 2 nical Meeting Reports to tho' ,

Library Management System 35c E.C.R,Q,5 Identify and Evaluate Numerical 1/27/89 8/25/89 Task 2 Model and Computer Databases.

W28 W Task 3 Update and Integrate Inputs to Support 9/01/89 9/01/89 Development of the Concer 5. Year Plan by SP&AE/T Subelement.

W23 W Task 2 Provide Semiannual Listing 3/10/89 9/08/89 and Distribution to the Element Managers of Acquisitions and Reviews of Technical Documents. .

W26 W Task 2 Transmic Revised Staffing Plan to 9/08/89 9/08/89 NRC for Review and Approval. Same Content as Item 25.

17b S Task 2. Analysis of KRC Strategic Plan 9/08/89 9/08/89 W29 W Task 3 Transmit the Center 5 Year rian; this 9/28/89 9/28/89 is a Major Program Deliverable Developed by SF&AE/T and Supported by the WSE&I Subelement.

W37d W Task 2 Identify, Acquire, and Review 8/25/89 1/27/90 Technical Documents, and Provide Input to the Technical Documents Trackins System. -

W38d W Task 2 Identify, svaluate, and Acquire 8/25/89 1/27/90 Models, and Provide Input to the Technical Documents Tracking System.

34d E.C.R,Q,S Input Documents Reviewed and Tech. 8/25/89 1/27/90 Task 2 nical Meeting Reports to the Library Management System 35d E.C.R,Q,S Identify and Evaluate Numerical 8/25/89 1/27/90 Task 2 Model and Computer Databases.

3

, ~t Element /

^ Milestone Subelement-Number Task No. Descrintion EIRE 12 153 -

S Task 5 Identify Policy Options Based on 8/04/89 2/24/90 Development of Program Architecture in conjunction with (12)

W24 W-Task 2 Provide Semiannual Listing 9/08/89 3/10/90 and Distribution to the Element Managers of Acquisitions and Reviews of Technical Documents.

Alb Q Task 2 Letter Report on QA Lessons Learned 9/29/89 4/02/90 from Non Waste NRC Activities Transmitted to the NRC.

18 S Task 2 NRC Strategic Plan (if directed) 2/01/89 When Directed NOTE 1: S - Special Projects and Analytical Evaluation Including Transportation Subelement E - Engineered Barrier System Element C - Coologic Setting Element R - Repository Design, Construction, and Operation Element Q - Quality Assurance Subelement W = Waste Systems Engineering and Integration Subelement NOTE 2: Task 4 for Each Element Does Not Change 4

4