ML20154G942
| ML20154G942 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 05/13/1988 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20154G946 | List: |
| References | |
| NUDOCS 8805250166 | |
| Download: ML20154G942 (2) | |
See also: IR 05000348/1988013
Text
WAY 131988
fde
j%.
-
.
.
Docket Nos. 50-348, 50-364
Alabama Power Company
ATTN:
Mr. R. P. Mcdonald
Senior Vice President
P. O. Box 2641
Birmingham, AL 35291-0400
Gentlemen:
SUBJECT:
NOTICE OF DEVIATION
(NRC INSPECTION REPORT NOS. 50-348/88-13 AND 50-364/88-13)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
G. R. Wiseman on April 4-8,
1988.
The inspection included a review of
activities authorized for your Farley facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The inspection revealed no violations of NRC requirements.
However, certain
activities having safety significance appeared to deviate from a commitment to
the NRC.
The deviation and elements to be included in your response are
described in the enclosed Notice of Deviation.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by tne
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
')
Alan . b t, Chief
Engineering Branch
Division of Reactor Safety
Enclosures:
(See page 2)
i\\
8805250166 880513
{DR
ADOCK 0500
3rc
' . ,
WAY 181988
.
..
.
Alabama Power Company
2
Enclosures:
1.
Notice of Deviation
2.
NRC Inspection Report
cc w/encis:
B. M. Guthrie, Executive Vice President
J. D. Woodard, General Manager -
Nuclear Plant
W. G. Hairston, III, Vice President -
Nuclear Support
J. W. McGowan, Manager-Safety Audit
and Engineerir2 Review
S. Fulmer, Supervisor-Safety
Audit and Engineering Review
bec w/encis:
D. Kubicki, NRR
A. Krasopoulos, RI
J. Ullie, RIII
J. Singh, RIV
C. Ramsey, RV
NRC Resident Inspector
DRS Technical Assistant
E. Reeves, Project Manager, NRR
Document Control Desk
State of Alabama
RII,.g/
RII
RII
RI
'
'
GWiseman: ser
TConlon
HDance
GJenkins
05/q/88
05/ll/88
05/gi/88
05/ g/88
/