Forwards Request for Addl Info Re Inservice Testing Program for Pumps & Valves,Including Justification Why Listed Valves Not Be Included in Testing Program.Response Requested within 30 Days
ML20154G823
Person / Time
Site: Clinton 
Issue date: 05/05/1988
From: Stevens J
Office of Nuclear Reactor Regulation
To: Spangenberg F
ILLINOIS POWER CO.
References
TAC-62929, NUDOCS 8805250110
Download: ML20154G823 (4)


Text

,

t.

N May 5.1988 o

Docket No. 50-461 DISTRIBUTION JPartlow e Docket E.11e-NRC/ Local PDRs" ACRS(10)

PDIII-2Rdp.

PDIII-2 Plant File OCrutchfie d Mr. Frank Spangenberg GHolahan Manager - Licensing and Safety LLuther Clinton Power Station JStevens Post Office Box 678 OGC-Rockville Mail Code V920 EJordan Clinton, Illinois 60690

Dear Mr. Spangenberg:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION CONCERNING THE INSERVICE TESTING PROGRAM (TAC NO. 62929)

As a result of the ongoing review of the Inservice Testing (IST) Program for Pumps and Valves for the Clinton Power Station, e list of questions concerning certain velves has been generated (Enclosure 1).

Please respond to these questions within 30 days.

l The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents, therefore, OMB clearance is not required under P.L.96-511.

For further information or clarification please contact tre at (301) 492-1397.

Sincerely.

Original Signed by/

i Janice A. Stevens Project Manager Project Directorate III-2 Divisien of Reactor Projects - III, IV, Y and Special Projects 2

Enclosure:

As stated f

2:PD l

PDIII-2:P PD!II-2:)

PD JStevens:b LLuther LJ bolm Y/ 3 /88

(/ P /88

{/

88 l

i l

l 8805250110 e30505 l

PDR ADOCK 0%O0461 P

PDR i

t

e enc

  1. f vq'o, UNITED STATES 8

P'

,e NUCLEAR REGULATORY COMMISSION y

,n WASHING TO N. D. C, 20555

  • s.,..../

Docket No. 50-461 Mr. Frank Spangenberg Manager - Licensing and Safety Clinton Power Station Post Office Box 678 Mail Code V920 Clinton, Illinois 60690

Dear Mr. Spangenberg:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION CONCERNING THE INSERVICE TESTING PROGRAM (TACNO.62929)

As a result of the ongoing review of the Inservice Testing (IST) Program for Pumps and Yalves for the Clinton Power Station, a list of questions concerning certain valves has been generated (Enclosure 1). Please respond to these questions within 30 days.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents, therefore OMB clearance is not required under P.L.96-511.

For further infonnation or clarification, please contact me at (301) 492-1397.

Sincerely,

$.hw Janice A. Stevens, Project Manager Project Directorate !!!-2 Division of Reactor Projects - III, IV, Y and Special Projects

Enclosure:

As stated CC:

See next page 1

P y

l o

Mr. Frank A. Spangenberg Clinton Power Station Illinois Power Company Unit I cC:

Mr. L. Larson Project Manager Mr. D. P. Hall General Electric Company Vice President 175 Curtner Avenue, N/C 395 Clinton Power Station San Jose, California 95125 P. O. Box 678 Clinton, Illinois, 61727 Regional Administrator, Region III 799 Roosevelt Road Mr. R. D. Freeman Glen Ellyn, Illinois 60137 Manager-Nuclear Station Engineering Dept.

Clinton Power Station Chairman of Dewitt County P. O. Box 678 c/o County Clerk's Office Clinton, Illinois 61727 DeWitt County Courthouse Clinton, Illinois 61727 Sheldon Zabel, Esquire Schiff, Hardin & Waite Illinois Department 7200 Sears Tower of Nuclear Safety 233 Wacker Drive Division of Engineering Chicago, Illinois 60606 1035 Outer Park Drive, 5th Floor Springfield, Illinois, 62704 Resident Inspector U. S. Nuclear Regulatory Comnission Mr. Donald Schopfer RR 3 Box 229 A Project Manager Clinton, Illinois 61727 Sargent & Lundy Engineers 55 East Monroe Street Chicago, Illinois 60603

HECHANICAL ENGINEERING BRANCH IN-SERVICE TESTING PROGRAM i

REQUEST FOR ADDITIONAL INFORMATION CLINTON POWER STATION, UNIT 1 DOCKET NO. 50-461 1.

The staff review indicates that the following valves should be included in the Clinton IST Program, but they are not.

Provide a written justi-fication for every valve, ?s to why it should not be included in the IST Program.

1E12-F051A,B 1FC-020A,B 1FC-96 OVC-002A,B OVC-032A,B 2.

Provide a system functional description and a discussion for each of the valves below indicating why they are not required to be included in the IST Program.

IB21-F098A, B, C, D 1G33-F031 1C41-F007 1G33-F033 10C-065 1G33-F042A,B,C 1C0-067 1G33-F044 10C-068 1G33-F102 1CC-070 IG33-F104 1E12-F40 1G33-F106 1E12-F49 1G33-F107 OVC-003A,B 3.

For the following valves provide a system description, the valve safety-related function, P&ID numbers and valve location on the P&ID. For each valve provide a brief rationale discussing why the valve should not be required to be includedin the IST Progrcn.

1B21-F005 1G36-F001A,B 1G36-F0014A,B 1821-F068 1G36-F002A,B 1G36-F0015A,B 1821-F069 IG36-F003A B 1G36-F0016A,B 1FC-018A,B 1G36-F004A B 1G36-F069A,B 1FC-022A,B 1G36-F005A,B 1G36-F081A,B 1FC-038 1G36-F006A,B 1SX295 1FC039 1G36-F007A,B 1FC-073 1G36-F008A,B 1FC-075A,8 IG36-F009A,B 1FC-077 IG36-F0010A,B 1FC-091 1G36-F0011A,B 1G33-100 1G36-F0012A,8 1G33-101 1G36-F0013A,B i

-