ML20154G790

From kanterella
Jump to navigation Jump to search
Forwards Manual Tab for EPIP SR/0/B/2000/003
ML20154G790
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 09/30/1998
From: Gordon Peterson
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9810130310
Download: ML20154G790 (3)


Text

3 t., I={i g Duke Energy Corporation

'g*

Catawba Nuclear Station 9

4800 Concord Road York, SC 29745 Gary R. Peterson (803) 831-4251 om

r, y;g,,

(803)831-3426Mx j

g September 30, 1998 U.S.-Nuclear Regulatory Commission Attention:

Document-Control Desk Washington,. DC 20555-0001

Subject:

Duke Energy Corporation Catawba Nuclear Station Units-1 and 2 Docket Nos. 50-413 and 50-414 Emergency. Plan Implementing Procedures Please find enclosed for NRC Staff use the manual tab for Emergency Plan Implementing Procedure SR/0/B/2000/003.

This tab l

should be placed in front of SR/0/B/2000/003 which is located in Emergency Plan Implementing Procedure Volume 2.

1 By copy of this letter, two copies of the tab are being provided to the NRC, Region II.

If there are any questions, please call Steve Christopher atl803-831-4027.

Very truly your Gar Peterson

/

Attachments D

9810130310 9ERS930 ?

PDR ADOCK OSCM413 F

PDR!

y,,

7 U.S.-Nuclear Regulatory. Commission

-Sep,tember 30,.1998 Page 2 xc (w/ attachments):

L. A. Reyes U.S. Nuclear Regulatory Commission Regional Administrator, Region II Atlanta Federal Center 61 Forsyth St.,

SW, Suite 23T85 Atlanta, GA- '30303 (w/o attachments):

P.

S. Tam NRC Senior Project Manager (CNS)

U.S.. Nuclear Regulatory Commission Mail Stop.0-14H25 Washington, DC 20555-0001 D.

J.

Roberts Senior Resident Inspector (CNS)

U.S.

Nuclear. Regulatory Commission Catawba. Nuclear Site