Text
l,
-==
9 Log # TXX-88460
=.
.=
File # 10130 2
C IR 87-31; 87-23 7UELECTRIC b1 Ref. #
C 2 wnuam c. coundi May 16, 1988 Ewarsve Vue Pressdent U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 REVISED DATE OF FULL COMPLIANCE FOR NOTICE OF VIOLATION (NOV) 1 TEM A (445/8731-V-01)
AND NOV (445/8735-V-02)
REF:
TV Electric letter TXX-88367 from W. G. Counsil to NRC dated March 31, 1988 Gentlemen:
The referenced letter provided our updated responses to NOV Item A (445/8731-V-01) and NOV (445/8735-V-02).
In those responses we stated that by May 15, 1988, Ebasco walkdown procedures would be revised to minimize the need for personnel to measure to hypothetical lines such as conduit centerlines.
I Revision of the applicable procedure has taken longer than expected.
i Accordingly, otir date for issuance of this revision is hereby revised to be no i
later than July 15, 1988.
Very truly yours, l
l W. G. Counsil By b A). b Mhn W. Beck Vice President, Nuclear Engineering RDD/grr c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) h 8805250079 880516