Advises That Date of Issuance of Revised Ebasco Walkdown Procedures Changed to 880715 in Response to Notice of Violation Item a
ML20154G765
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/16/1988
From: Beck J, Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
TXX-88460, NUDOCS 8805250079
Download: ML20154G765 (1)


Text

l,

-==

9 Log # TXX-88460

=.

.=

File # 10130 2

C IR 87-31; 87-23 7UELECTRIC b1 Ref. #

C 2 wnuam c. coundi May 16, 1988 Ewarsve Vue Pressdent U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 REVISED DATE OF FULL COMPLIANCE FOR NOTICE OF VIOLATION (NOV) 1 TEM A (445/8731-V-01)

AND NOV (445/8735-V-02)

REF:

TV Electric letter TXX-88367 from W. G. Counsil to NRC dated March 31, 1988 Gentlemen:

The referenced letter provided our updated responses to NOV Item A (445/8731-V-01) and NOV (445/8735-V-02).

In those responses we stated that by May 15, 1988, Ebasco walkdown procedures would be revised to minimize the need for personnel to measure to hypothetical lines such as conduit centerlines.

I Revision of the applicable procedure has taken longer than expected.

i Accordingly, otir date for issuance of this revision is hereby revised to be no i

later than July 15, 1988.

Very truly yours, l

l W. G. Counsil By b A). b Mhn W. Beck Vice President, Nuclear Engineering RDD/grr c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) h 8805250079 880516

'o0 North olive Street LB 81 Dallas. Texas 7H01 i

O PDR ADOCK 05000445

(

Q DCD

- - _ _ -