Forwards Amends 223 & 227 to Licenses DPR-44 & DPR-56 & Se. Amends Revise Peach Bottom Atomic Power Stations,Units 2 & 3 TSs to Exclude MSIV Leakage from Total Type B & Type C Local Leak Rate Test Results
ML20154G648
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/01/1998
From: Thadani M
NRC (Affiliation Not Assigned)
To: Geoffrey Edwards
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20154G653 List:
References
TAC-M98804, TAC-M98805, NUDOCS 9810130266
Download: ML20154G648 (3)


Text

_. _

)

October 1,1998 Mr. Garrett D. Edwards Director-Licensing, MC 62A-1 PECO Energy Company

/

Nuclear Group Headquarters

.~

Correspondence Control Desk P.O. Box No.195 Wayne, PA 19087-0195

SUBJECT:

PEACH BOTTOM ATOMIC POWEa STATION, UNIT NOS. 2 AND 3; MAIN STEAM ISOLATION VN.VES LEAAAGE EXCLUSION FROM LOCAL LEAK

. RATE TEST RESULTS (TAC NOS. M98804 AND M98805)

Dear Mr. Edwards:

The Commission has issued the enclosed Amendments Nos.223 and 227 to Facility Operating License Nos. DPR-44 and DPR-56 for the Peach Bottom Atomic Power Station (PBAPS), Unit Nos. 2 and 3. These amendments consist of changes to the Technical l

Specifications (TSs) in response to your application dated May 23,1997 as supplemented by letter dated September 11,1998.

These amendments revise the PBAPS TSs to exclude the MSIV leakage from the total Type B and Type C Local Leak Rate Test results.

A copy of the safety evaluation is also enclosed. Notice of Issuance will be included in the Commission's Bi Weekly Federal Reaister Notice.

Sincerely, MMIn C. Thadani, Senior Project Manager l

Project Directorate I-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-277/278 j

Enclosures:

1. Amendment No.223 to DPR 2. Amendment No.227 to DPR-56 I
3. Safety Evaluation cc w/encis: See next page DISTRIBUTION.

Docket File MO'Brien CBerlinger THarris(E-Mail SE)

PUBLIC.

MThadani JPulsipher PDI-2 Reading OGC EThrom JZwolinski GHill(4)

ACRS RCapra M

WBeckner CAnderson,RGN-1 P[lh PDl4/thk SCSB/BC

  • OGC PDI-2/D OFFICE

/ rr o < u uu u

NAME MThadani:mw MO'Brien CBerlinger OM 0 RCapra DATE f /23/98 hidd98 09 /11/98 S fN98 to / i/98 OFFICIAL RECORD COPY O

f DOCUMENT NAME: A:W98804.AMD

  • SE input 9810130266 981001 PDR ADOCK 05000277

.1

pn nnu o

  • 4 UNITED STATES j

NUCLEAR REGULATORY COMMISSION

% * * * * * +o#g WASHINGTON, D.C. 20666 0001 October 1, 1998 Mr. Garrett D. Edwards Director-Licensing, MC 62A-1 PECO Energy Company Nuclear Group Headquarters Correspondence Control Desk P.O. Box No.195 Wayne, PA 19087-0195 l

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATICN, UNIT NOS. 2 AND 3; MAIN STEAM ISOLATION VALVES LEAKAGE EXCLUSION FROM LOCAL LEAK RATE TEST RESULTS (TAC MOS. M98804 AND M98805)

Dear Mr. Edwards:

The Commission has issued the enclosed Amendments Nos. 223 and 227 to Facility Operating License Nos. DPR-44 and DPR-56 for the Peach Bottom Atomic Power Station (PBAPS), Unit Nos. 2 and 3. These amendments consist of changes to the Technical Specifications (TSs) in response to your application dated May 23,1997 as supplemented by letter dated September 11,1998.

These amendments revise the PBAPS TSs to exclude the MSIV leakage from the total Type B and Type C Local Leak Rate Test results.

A copy of the safety evaluation is also enclosed. Notice of issuance will be included in the Commission's Bi-Weekly Federal Reaister Notice.

Sincerely,

.Mohan C. The ani, Senior Project Manager Project Directorate 1-2 Division of Reactor Projects - 1/Il Office of Nuclear Reactor Regulation Docket Nos. 50-277/278

Enclosures:

1. Amendment No. 223 to DPR-44
2. Amendment No. 227 o DPR 56 t
3. Safety Evaluation cc w/encis: See next page

l Mr. Garrett D. Edwards Peach Bottom Atomic Power Station, PECO Energy Company Units 2 and 3 cc:

l l

I J. W. Durham, Sr., Esquire Chief-Division of Nuclear Safety Sr. V.P. & General Counsel PA Dept. of l

PECO Energy Company Environmental Resources l

2301 Market Street, S26-1 P.O. Box 8469 l

Philadelphia, PA 19101 Hanisburg, PA 17105-8469 PECO Energy Company ATTN: Mr. J. Doering, Vice President Board of SupeNisors Peach Bottom Atomic Power Station Peach Bottom Township 1848 Lay Road R. D. #1 Delta, PA 17314 Delta, PA 17314 PECO Energy Company Public Service Commission of Maryland ATTN: Regulatory Engineer, A4-SS Engineering Division Peach Bottom Atomic Power Station Chief Engineer t

1848 Lay Road 6 St. Paul Centre Delta, PA 17314 Baltimore, MD 21202-6806 Resident inspector Mr. Richard McLean U.S. Nuclear Regulatory Commission Power Plant and Environmental Peach Bottom Atomic Power Station Review Division P.O. Box 399 Department of Natural Resources Delta, PA 17314 B-3, Tawes State Office Building Annapolis, MD 21401 Regional Adrainistrator, Region i U.S. Nuclear Regulatory Commission Dr. Judith Johnsrud 475 Allendale Road National Energy Committee King of Prussia, PA 19406 Sierra Club 433 Orlando Avenue Mr. Roland Fletcher State College, PA 16803 Department of Environment 201 West Preston Street Manager Financial Control & Co-Owner Baltimore, MD 21201 Affairs Public Service Electric and Gas A. F. Kirby, lll Company Extemal Operations - Nuclear P.O. Box 236 Delmarva Power & Light Company Hancocks Bridge, NJ 08038-0236 P.O. Box 231 Wilmington, DE 19899 Manager-Peach Bottom Licensing PECO Energy Company PECO Energy Company Nuclear Group Headquarters l

Plant Manager Correspondence Control Desk Peach Bottom Atomic Power Station P.O. Box No.195 l

1848 Lay Road Wayne, PA 19087-0195 Delta, PA 17314 l