ML20154G575
| ML20154G575 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 09/12/1988 |
| From: | Morgan H SOUTHERN CALIFORNIA EDISON CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8809210016 | |
| Download: ML20154G575 (2) | |
Text
_
89 a
d
,.[
l Southem Califomia Ed/ son Company SAN ONCFRE NUCLEAR GENERATING ST Af TON P. O BOX l 28 SAN CLEMENTE. CALIFORNIA 92672 t
- STAT NW NAS 4 0 41 40 l
Septembcr 12, 1988 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 r
i
Subject:
Docket No. 50-362 Report of NPDES Permit Violation San Onofre Nuclear Generating Station, Unit 3 i
Pursuant to Section 3.2 of Appendix B, Environmental Protection Plan, to Operating License No NPF-15 for San Onofre Unit 3, enclosed is a copy of the J-1988 monthly NPDES report summary which includes a description of a vi tion of the San Onofre Unit 3 NPDES permit.
If you require any additional information, please so advise.
Sincerely, Mbb i
l Erclosure F. R. Huey (USNRC Senior Resident Inspector, Units 1, 2, and 3) cc:
J. B. Martin (Regional Administrator, USNRC Region V) d C 001 0e09210016eg912og,62 j,
DR ADOCK o
E..
o Southern California Edison Company
.; % ?
S AN ONof Rt NL Ctt AR Ct%IR Atl%C 51 Atlos P O S oA 1.'8
$4% CitME'.fl. C ALH ORNI A l'6'2 August 29, 1988 Mr. Ladin Delaney, Executive officer California Regional Water Quality Control Board San Diego Region 9771 Clairemont Mesa Boulevcrd, Suite B San Diego, California 92124-1331
Dear Mr. Delaney:
Subject:
NPDES Monitoring Report San Onofre Nuclear Generating Station, Unit 3 The SONGS monitoring report covering the month of July is subnitted in accordance with the requirements of CRWQCB Order 85-13 (NPDES Permit No.
CA0108181). A sumary of the generating unit's status and significant analytical results is provided below.
Le uni) was shutdown for refueling during July. All sag led water sources-were found to be within permit limits, except one chlorination on 7/6/88 which exceeded limits.
We chlorination was stopped when the sagle indicated excessive chlorine. The chemical pemps were reset and testing the following day was within limits.
mis incident occurred with only two of the four circulating ptrnps running.
Procedural changes have been made to prevent future reoccurrence.
Pursuant to Order No. 85-13, Reporting Requirement 12, your letter dated June 25, 1985, authorizes the following representative (s) to sign ard certify all reports required by this order: Arthur Kneisel, Environmental Ergineer.
I certify under penalty of law that I have personally examined and am familiar with the information subnitted in the attached docunent, and based on my inquiry of those individuals imediately responsible for obtaining the information, I believe the submitted information is true, accurate, and conplete.
I am aware that there are significant penalties for subnitting false information, including the possibility of fine and imprisorrnent.
Sincerely, kY B. Katz Manager, operations and Maintenance Support Enclosure Environmental Protection Agency, Region IX cct
-