ML20154G528

From kanterella
Jump to navigation Jump to search
Informs That Rev 2 to Offsite Dose Calculation Manual Acceptable as Interim Ref,Based on Review by Eg&G.Final Rev Should Address Discrepancies,Suggestions & Technical Issues
ML20154G528
Person / Time
Site: Clinton Constellation icon.png
Issue date: 09/06/1988
From: Stevens J
Office of Nuclear Reactor Regulation
To: Holtzcher D
ILLINOIS POWER CO.
Shared Package
ML20153B798 List:
References
NUDOCS 8809200387
Download: ML20154G528 (3)


Text

'

, f

%, UNITED STATES f,  !(# o n LFAR REGULATORY COMMISSION

% ej WASHINGTON, D. C. 20665 8 September 6,1988 '

%, . . . . . p Docket No.: 50-461 Mr. Dale L. Holtzscher Acting Manager - Licensing and Safety Clinton Power Station Post Office Box 678 Mail Code V920 '

Clinton, Illinois 61727

Dear Mr. Holtzscher:

SUBJECT:

CLINTON POWER STATION - ACCEPTANCE OF 0FFSITE DOSE CALCULATION MANUAL, REVISION 2, DATED OCTOBER 1986 (TAC NO. 67771)

REFERENCES:

(a) December 23, 1985 letter from F. A. Cpangenberg to the Director of NRR.

(b) Februa ry 14, 1986 letter from W. R. Butler to F. A. Spangenberg (c) August 28, 1987 letter from F. A. Spangenberg to A. B. Davis.

Per reference (a), Illinois Power Company (IP) provided an Offsite Dose Calcalation Manual (ODCM), Revision 1, dated November 1985, for the Clinton Power Station. Referenct (b) documented the staff's acceptence of this ODCM.

Accompanying reference (c) was the Clinton Semiannual Radioactive Effluent Release Report for Feoruary 27 through June 30, 1987 and a complete Revision 2 to the Clinton ODCM dated October 1986.

The Revisinn 2 ODCM for Clinton has been reviewed for us in its entirety by our contractor, EG&G Idaho, Inc. Their discussion and connents are contained in

. a TER, EGG-PHY-8097 (enclosed). We agree with the contractor that this ODCM uses methods that are, in general, consistent with staff guidelines and is an acceptable interim reference. However, in the TER there are listed a number of discrepancies and suggestions, some typugraphical in nature, others dealing with technical issues. Since these questions involve refinements to a basically sound document, there is no need for innediate action. However, 000 okk 0 N F di q

e .'

r-we request that all of the points raised in the Conclusions Section of the TER be addressed by IP within six months of the date of this letter in a new revision to the ODCM.

& Y.

Janice A. Stevens, Project Manager Project Directorate III-2 Division of Reactor Projects - III, IV,Y and Special Projects

Enclosure:

As Stated cc: W. Meinke I

7 September 6,1988

. s

. we request that all of the points raised in the Conclusions Section of the TER be addressed by IP within six stonths of the date of this letter in a new revision to the ODCM.

Janice A. Stevens, Project Manager Project Directorate III-2 Division of Reactor Projects - III, IV, Y and Special Projects

Enclosure:

As Stated cc: W. Meinke .

DISTRIBUTION  !

5 Docket file- EJordan

NRC & Local PORs PDIII-2 Plant file P0lII-2 r/f ACRS(10) ,

0Crutchfield 0GC GHolahan BMarcus LLuther BGrimes JStevens i

1 PO!!!-h PDIII-2 PD42 ~

JStevensu m LLuthe M $11br 9/ 6 /88 9/.2./88 97g/88 1

(0

,