Responds to NRC Bulletin 88-005 Re Nonconforming Matl Supplied by Piping Supplies,Inc & West Jersey Mfg Co
ML20154F874
Person / Time
Site: Oyster Creek
Issue date: 09/12/1988
From: Fitzpatrick E
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
IEB-88-005, IEB-88-5, NUDOCS 8809200159
Download: ML20154F874 (4)


Text

_ _ - _ _ _ _ _ _.

GPU Nuclear Corporation NUCI88r RtergSr388 Forked River New Jersey o87310388 609 97?-4000 Wnters Dimet Dot Number:

September 12, 1988 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, DC 20555

Dear Sir:

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 NRC Bulletin 88-05

Reference:

(1) NRC Bulletin No. 88-05, "Nonconforming Materials Supplied By Piping Supplies, Inc. at Folsom, NJ and West Jersey Manufacturing Company at Williamstown, NJ," May 6, 1988 (2) NRC Bulletin No. 88-05, Supplement 1, June 15,1988 (3) NRC Bulletin No. 88-05, Supplement 2, August 3,1988 f

This letter is written to meet the reporting requirements of NRC Bulletin l

88-05 as amended by Supplements 1 and 2.

In accordance with Supplement 2, activities requested by the bulletin have been temporarily suspended until further notice by the NRC.

A records review was conducted as requested to determine whether ani materials manufactured by West Jersey Manufacturing Company (WJM), Pi$g) or Supplies, Inc. (PSI), Chews Landing Metal Manufacturers Incorporated (CLM Philadelphia Steel were purchased for use at the Oyster Creek Nuclear Generating Station. Purchase order 3 and procurement records were reviewed, vendors were queried and accounts payable receipts were used for secondary verifications.

Our findings as of August 16, 1988 are as follows:

1.

No direct purchases from WJM, PSI, CLM or Philadelphia Steel were identified.

rdE3 2.

One (1) purchase order was identified with flanges manufactured by 58' PSI.

Seven (7) purchase orders were Identified with flanges manufactured by WJM.

No materials were found manufactured by CLM or mJ Philadelphia Steel. A total of 15 different flange types were gg identified on these eight (8) purchase orders.

Test results and

.,8 other details are provided in Attachment I.

Additionally, GPU/JCPal oc contracted with an architect / engineer (A/E) to provide the New O<

Radwaste and the Auxiliary Off-Gas Systems.

This included

$m contracting out piping system fabrication.

The subcontractor to the mo A/E has identified the extensive use of WJM flanges in these non-safety related systems.

p GPU Nuclear Corporation is a subsdary cf the General Pubhc Utikt.es Corporation

2 Documentation associated with this effort is being maintained for inspection at Oyster Creek.

If further information is required, please contact Mr. Michael Heller, OC Licensing Engineer at (609)971-4680.

Very truly yours, f6 E. E. Fitz atrick Vice President and Director Oyster Creek Sworn to and Subscribed before me this /8 day o A

/4 4 M88.

N A. A.A&A A Nyg@MMA%f0W NOTAgy 70WC Of n$

My Commission Doi ], y, f EEF/MH/dmd (0543A)

Attachment cc: Mr. William T. Russell, Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 NRC Resident Inspector Oyster Creek Nuclear Generating Station Forked River, NJ 08731 1.

Attachment I Identified Materials Manufactured by WJM and PSI As of September 9, 1988 Item Supplier Mfr Quan Description Rating Specs Heat Code Remarks (psi) 1 Tioga Pipe PSI 2

14" Weld Neck 150 A105 AB3 2 of 2 flanges located. Lab test results show Flange conformance to ASTM requirements. Bought for safety related stock. PO 061452.

2 Guyon Alloys WJM 12 2" Raised Face 150 A105 03017 0 of 12. flanges located. Bought for non-safety Flange related stock. PO 42976.

3 Guyon Alloys WJM 12 1.25" Raised Face 150 A105 E1313 6 of 12 flanges located. Lab test results show Flange

[Mg) and tensile to be below ASTM requirements by.21 wt% and 17ksi respectively. Bought for non-safety related stock. PO 42976.

4 Guyon Alloys WJM 12 4" Raised Face 150 A105 03378 4 of 12 flanges located. Lab test results show Flange only [Mg] to be out of specifcation by.01 wt%.

Bought for non-safety related stock. PO 42976.

5 Guyon Alloys WJM 12 5" Raised Face 150 A105 T415 12 of 12 flanges located. Lab test results show Flange conformance to ASTM requirements. Bought for non-safety related stock. PO 42976.

6 Guyon Alloys WJM 12 6" Raised Face 150 A105 03200 9 of 12 flanges located. Lab test results show Flange only [P) to be out of specification by.01 wt%.

Bought for non-safety related stock. PO 42976.

7 Capitol Pipe WJM 4

8" Weld Neck Flange 150 A105 S21053 0 of 4 flanges located. Bought for Fiae Protection System modification. System walkdown confirmed these flanges not installed. PO 72980.

8 Capitol Pipe WJM 1

8" Weld Neck Flange 600 SA105 4546 1 of 1 flange located. Equotip acceptable, sent to lab for analysis. Bought for Shutdown Cooling System modification but never installed. Turned into stock (ordered AS7M, received ASME). PO 200379.

Pg. 1 of 2

c.

~

l Attachsnent I I

Identified Materials Manufactured by WJM and PSI As of September 9, 1988 Itesa Supplier Mfr g Description Rating Specs Heat Code Resaarks (psi) 9 Capitol Pipe WJM 1

3" Blind Flange 900 SA105 LO768 1 of 1 flange located. Rockwell tested low, sent to lab for analysis. Bought for Shutdown Cooling System but never installed. Turned into stock (ordered ASTM, received ASME). PO 200379.'

10 capitol Pipe WJM 2

8" Spectacle Flange 600 SA515 T08134 1 of 2 flanges located. Equotip 4cceptable, i

rent to lab for analysis. Bought for Shutdown Cooling System snodification. PO 200379.

11 Capitol Pipe WJM 1

4" Weld Neck Flange 300 A105 4631 1 of 1 flange located. Equotip acceptable, sent to lab for analysis. Bought for Alternate Decay Heat Systesa snodification but never installed.

PO 201808.

12 Capitol Pipe WJM 4

0.5" socket Weld 150 A182 B3691 2 of 4 flanges located. Visually noted as Flange stainless steel, sent to lab for analysis.

Bought for Reactor Cavity (Fuel Pool) Water Clarity modification. PO 200673.

13 Capitol Pipe WJM 2

0.5" Socket Weld 150 A105 82D 2 of 2 flanges located. Sent to lab for Flange analysis. Bought for Reactor Cavity Water Clarity snodit'ication but never installed. PO 200673.

14 Capitol Pipe WJM 4

0.5" Socket Weld 300 A105 J14E 4 of 4 flanges located. Sent to lab for Flange analysis. Bought for Reactor Cavity Water Clarity Modification but never installed. PO 200673.

15 Capitol Pipe WJM 1

2" Weld Neck Flange 150 SA105 222A9 0 of 1 flange located. Bought for ASME Code demonstration. PO 202060.

                                      • NorE***********************

Rockwell and Equotip tests were preliminary only, materials were sent to lab for official analysis.

Pg. 2 of 2