ML20154F670

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-344/88-31 on 880718-22.No Violations Deviations Noted.Violation Noted During Insp Rept 50-344/87-31 Rescinded,Based on Review of Util
ML20154F670
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 08/31/1988
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20154F675 List:
References
NUDOCS 8809200084
Download: ML20154F670 (2)


See also: IR 05000344/1988031

Text

-

.

.-

,

'

.

'

'

'

,

.

'

'

,.

,s

,

.

AUG s 1 1999 -

'

00cket No. 50-344

Portland General Electric Company

121 S. W. Salmon Street

Portland, Oregon 97224

Attention: Mr. D. W. Cockfield

Vice President, Nuclear

Gentlemen:

Subject

NRC Inspection of Trojan Nuclear Plant

This letter refers to the inspection conducted by Mr. J. F. Melfi of this

office, on July 18 through July 22, 1988, of activities authorized by NRC

License No. NPF-1 and to the discussion of our findings held by Mr. Melfi with

members of your at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

No violations of NRC requirements were identified within the scope of this

inspection.

In your letter dated January 26, 1988, in response to our Notice of Violation

in Inspection Report No. 50-344/87-31, dated December 17, 1988, Trojan denied

the violation cited.

After review of the information provided to the inspector during this

inspection, we believe the the basis for the violation does not exist and the

violation (50-344/87-31, Violation A) is rescinded.

In accordance with 10 CFR 2.790 (a), a copy of this letter and the enclosure

will be placed in the NRC Public Docu.nent Room.

Should you have any questions concerning this inspection, we will be glad to

,

discuss them with you.

Sincerely,

Ori mdSWnec$

Robert'J Pate, ChiefV

Reactor Safety Branch

Enclosure:

1.

Inspection Report No. 50-344/88-31

S809200084 880831

1

[b

DR

ADOCK 05000344

h

PDC

'

Ih

'

v

l

'

,

.

.,

-

s .

.

-2-

AUG 311988

cc w/ enclosure:

C. M. Olmstead, PGE

W. Dixon, DOE

bec w/ enclosure:

Project Inspector

Resident Inspector

docket' file

G. Cook

B. Faulkenberry

J. Martin

T. Foley, NRR-

i

bec w/o enclosure:

LFMB

1

M. Smith

REGION Y

JFMelfi

SARichands

RJPate

)w ,w ,J, , c

1

,

/88

08/gy/88

08/7 /88

S/3 /Tb

ST COPY,'

,'RJEREST COPY'

~ REQUEST

Y'

~SR D TO PDR'l

/X.

LTE57 / X

[YES / NO l

(VE 9 / g

u,5

'

/'

v

v

-

,

,

I

h