Monthly Operating Repts for Apr 1988
ML20154F650
Person / Time
Site: Point Beach  
Issue date: 04/30/1988
From: Fay C, Krause C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CON-NRC-88-043, CON-NRC-88-43 VPNPD-88-258, NUDOCS 8805240011
Download: ML20154F650 (9)


Text

..

A$

JUh!

OPERATING DATA REPORT 3S[

DOCKET NO. 50-266 88 o

DATE May 3, 1988 X*

gaj COMPLETED BY C. U. KRAUSE OO ty@l}

TELEPHONE 414 221 2001 go OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1

. NOTES

2. REPORTING PERIOD:

APRIL 1988

3. LICENSED THEREAL POWER (Mul): 1518.
4. NAMEPLATE RATING (GROSS MUE):

523.8

5. DESIGN ELECTRICAL RATING (NET MUE): 497.
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MUE): 509.
7. MAXIMUM DEPENDABLE CAPACITY (NET MUE): 485.
8. IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:

NOT APPLICABLE

9. POUER LEVEL TO UHICH RESTRICTED, IF ANY (NET MUE): NOT APPLICABLE
10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPL" ABLE THIS MONTH YR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 719 2,903 153,263
12. NUMBER OF HOURS REACTOR WAS CRITICAL 195.4 2,379.4 125,147.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 652.7
14. HOURS GENERATOR ON LINE 193.4 2,377.4 122,422.1
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 837.3
16. GROSS THERMAL ENERGY GENERATED (MUH) 270,238 3,580,507 169,207,$61
17. GROSS ELECTRICAL ENERGY GENERATED (MUH) 91,950 1,224,730 57,048,100

'8.

NET ELECTRICAL ENERGY GENERATED (MUH) 86,164 1,172,729 54,326,248

19. UNIT SERVICE FACTOR 26.9 81.9 79.9
20. UNIT AVAILABILITY FACTOR 26.9 81.9 80.4
21. UNIT CAPACITY FACTOR (USING MDC NET) 24.7 83.3 72.6
22. UNIT CAPACITY FACTOR (USING DER NET) 24.1 81.3 71.3
23. UNIT FORCED OUTAGE RATE 0.0 2.0
24. SHUTDOUNS SCHEDULED DVER NEXT 6 MONTHS (TYPE. P iE,,

DU7ATION OF EACH):

NONE s

25. IF SHUTDOUN AT END OF REPORT PERIOD, ESTINATEL DATE OF STARTUP: MAY 21, 1988 e--

DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

DOCKET NO.

50-266 UNIT NAME Point Beach, Unit 1

j DATE May 3, 1988 COMPLETED BY C.

W.

Krause TELEPHONE 414/221-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH APRIL 1988 AVERAGE AVERAGE AVERAGE.

DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL-DAY MWe NET DAY MWe NET DAY MWe NET 1

485 11

-9 21

-2 2

483 12

-2 22

-2 3

441.6 13

-2 23

-2 4

477 14

-1 24

-2 5

464 15

-1 25

-2 6

460 16

-2 26

-2 7

395 17

-2 27

-2 8

427 18

-2 28

-2 9

-7 19

-2 29

-2 10

-14 20

-2 30

-2 EQR-28a (04-86)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-266 UNIT NAME Poi'it Beach Unit 1*

DATE M r.'s 3, 1988 REPORT MONTH APRIL 1988 COMPLETED BY C.

W.

Krause TELEPHONE 414/221-2001

$o Ce ca 14 On C

6 o to C

o 4

0

-c4 4 o

CD o Ev C ao (D

4:3 to tC4 00 oe No.

Date 8y MS Licensee Event

$3

@'3 Cause & Corrective Action Ei j-yyy Report No.

go gO To Prevent Recurrence M

E.C um 1

880409 S

525.6 C

1 N/A ZZ ZZZZZZ Shutdown for annual refueling and maintenance.

2 F:

Forced 2 Reason:

3 Method:

4 Exhibit G-Instructions S:

Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Test 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training &

Previous Shutdown Licensing Exam 5 - Reduced Load SExhibit I-Same Source F - Administrative 6 - Other (explain)

G - Operational Error (explain)

H - Other (explain)

EQR-28B (06-86)

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No.

50-266 Unit Name Point Beach Unit 1 Date May 3, 1988 Completed By C. W.

Kre'Ise Telephone 414/221-2001 On April 4, 1988, the unit surpassed 57 billion KW hours.

At 7:00 p.m. on April 8th, a normal power reduction commenced as scheduled for the annual refueling and maintenance outage.

The generator was taken off line at 2:22 a.m. on April 9th, and cold shutdown was reached at 5:46 p.m. on April loth.

Major outage related work includes the five year inspection of the main electrical generator, the changing of one phase of the main step up transformer, and minor modifications to the steam generators.

Safety related maintenance performed during the period includes replacement of environmentally qualified electrical splicing on solenoid operated valves, and inspection and maintenance of SI accumulator check valve SI-842A.

On April 15, 1988, during type "C" leak rate testing, the "A"

reactor coolant pump component cooling water supply line check valve leak rate exceeded the containment leak rate allowed by Technical Specifications.

As a result, LER 88-004 will be issued.

On April 28, in preparation for rod latching, the containment purge supply and exhaust valves were tested as required by Technical Specifications.

During the test it was discovered that the auto-close on high radiation signal was inoperable.

It was determined that this signal was inoperable for approximately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

As a result, LER 88-005 will be issued.

i l

l

't 1

l l

OPERATING DATA REPORT i

DOCHET NO. 50-301 l

DATE May 3, 1988 i

I COMPLETED BY C. U. KRAUSE TELEPHONE 414 221 2001 OPERATING STATUS 1

l

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2

. NOTES l

2. REPORTING PERIOD:

APRIL 19P8 i

3. LICENSED THERMAL POWER (MUT): 1518.

l

4. NAMEPLATE RATING (GROSS MUE):

523.8 l

5. DESIGN ELECTRICAL RATING (NET MUE): 497.
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MUE): 509.

l

7. MAXIMUM DEPENDABLE CAPACITY (NET NUE):

485.

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NOT APPLICABLE

9. POWER LEVEL TO UHICH RESTRICTED. IF ANY (HET MUE): NOT APPLICABLE
10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE l
11. HOURS IN REPORTING PERIOD 719 2.903 138.048
12. NUMBER OF HOURS REACTOR UAS CRITICAL 699.6 2.883.6 121.278.0
13. REACTOR RESERVE SHUTDOWN HOURS 1.1 1.1 216.1
14. HOURS GENERATOR ON LINE 656.2 2.840.2 119,310.3
15. UNIT RESERVE SHUTDOUN HOURS 5.0 5.0 297.4
16. GROSS THERMAL ENERGY GENERATED (MUH) 949.345 4,255,742 168.826.337
17. GROSS ELECTRICAL ENERGY GENERATED (MUH) 323.700 1,457.430 57.237,650 j
18. NET ELECTRICAL ENERGY GENERATED (MUH) 307.901 1,393,482 54.529.225
19. UNIT SERVICE FACTOR 91.3 97.8 86.4
20. UNIT AVAILABILITY FACTOR 92.0 98.0 84.6
21. UNIT CAPACITY FACTOR (USING rDC NET) 88.3 99.0 80.6
22. UNIT CAPACITY FACTOR (USING DER NET) 86.2 96.6 79.5
23. UNIT FORCED OUTAGE RATE 3.5 0.8 1.2
24. SHUTDOUNS SCHEDULED DVER NEXT 6 MONTHS (TYPE. DATE, AND DURATION OF EACH):

Six-week refueling and maintenance outage scheduled to begin September 30, 1988.

25. IF SHUTDOUN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

r-DOCKET NO.

50-301 UNIT NAME Point Beach, Unit 2 DATE May 3, 1988 COMPLETED BY C. W.

Krause TELEPHONE 414/221-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH APRIL 1988 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1

498 11 19 21 496 2

497 12 406 22 496 3

457 13 495 23 496 4

498 14 495 24 496 5

499 15 496 25 497 6

498 16 496 26 495 7

177 17 497 27 496 8

88 18 496 28 496 9

254 19 496 29 496 10

-9 20 496 30 497 EQR-28a (04-86)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-301 UNIT NAME Point Beach Unit 2' DATE May 3, 1988 REPORT MONTH APRIL 1988 COMPLETED BY C.

W.

Krause TELEPHONE 414/221-2001

$o C^

ce 44 Qo C

om C

o 54 0

ri E4 o

Os o Ev C ao e

4:3 m

oC#

ee oe No.

Date Id O Licensee Event

$3 O*3 Cause & Corrective Action B

y-yyy Report No.

pU 8O To Prevent Recurrence 0

E;.C u) 1 880407 F

23.6 A

3 LER 88-001 ED INSTRU While shifting instrument power supplys, two inverters tempor-arily operated in parallel due to inadequate mechanical linkage.

Immediate corrective action included the posting of an opera-tor aid.

2 880410 S

39.2 B

5 N/A CH VALVEX Separation between the valve stem and disk occurred on a main feed pump discharge valve.

The unit was taken off line while repairs were made.

3 F:

Forced 2 Reason:

3 Method:

4 Exhibit G-Instructions 5:

Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Test 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Trainic_g &

Previous Shutdown Licensing Exam 5 - Reduced Load SExhibit I-Same Source F - Administrative 6 - Other (explain)

G - Operational Error (explain)

H - Other (explain)

EQR-28B (06-86) 1

3*

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No.

50-301 Unit Name Point Beach Unit 2 Date May 3, 1988 Completed By C. W.

Krause Telephone 414/221-2001 Unit 2 operated at approximately 496 MWe net through most of the period.

At 9:04 a.m. on April 7, 1988, a reactor trip occurred.

The trip occurred while shifting instrument power supplies when two inverters temporarily operated in parallel due to inadequate mechanical linkage. As a result, LER 88-001 will be issued.

Unit 2 was brought back to criticality by 8:29 a.m. on April 8.

Unit 2 generator was brought on line at 8:43 a.m.

During return to power, separation between the valve stem and disk was discovered on main feed pump discharge valve 2MOV-2189.

Power was then held at 54% of full power for approximately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> while this condition was investigated, during which time Unit 2 generation surpassed 57 billion kW hours.

At 9:36 p.m. on April 9, Unit 2 load reduction commenced to facilitate repairs to 2MOV-2189.

At 1:52 a.m. on April 10, Unit 2 was taken off line for approximately 39 hours4.513889e-4 days <br />0.0108 hours <br />6.448413e-5 weeks <br />1.48395e-5 months <br /> while 2MOV-2189 was repaired.

Unit 2 was back at full load by 8:16 a.m. on April 12.

l 1

i l

t l

r 6

Wisconsin lElectnc POWER COMPANY 231 w M.chegart PO Box 2046 MJ*cukee,WI 53201 (414)221 2345 VPNPD-88-258 NRC-88-043 May 10, 1988 U. S. NUCLEAR REGULATORY COMMISSION Document Control Desk Washington, D. C.

20555 Gentlemen:

DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 t

Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of April 1988.

Very truly

ours, h

i (f/U.

I C. W. Fay Vice President Nuclear Power t

I t

Attachments

[

I Copies to R.

S. Cullen, PSCW

[

NRC Regional Administrator, Region III NRC Resident Inspector j

i \\

I A.stM1 Leg &HIwwwr fxg Gwymtits