ML20154F638
| ML20154F638 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 09/13/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20154F643 | List: |
| References | |
| NUDOCS 8809200075 | |
| Download: ML20154F638 (2) | |
See also: IR 05000267/1988019
Text
- _ - _ _ _ - _ _
SEP i 31988
, . , , ,
SAFEGUARDS INFORMATION
In Reply Refer To:
Docket:
50-267/88-19
Public Service Company of Colorado
ATTN:
Robert O. Williams, Jr.
Vice President, Nuclear Operations
2420 W. 26th Avenue, Suite 15c
Denver, Colorado 80211
Gentlemen:
lhls refers to the inspection conducted by Mr. A. B. Earnest of this office
during the period August 10-11, 1988, of activities authorized by NRC Operating
License DPR-34 for the Fort St. Vrain Nuclear Generating Station, and to the
discussion of our findings with members of your staff at the conclusion of the
inspection.
The NRC inspector reviewed certain areas of your physical security program.
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the NRC inspector.
The inspection findings are documented in
the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
We iiave also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragtaph 2 of the enclosed report.
The material enclosed herewith contains Safeguards Informatinn as defined by
10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited
by Section 147 of the Atomic Energy Act of 1954, as amended.
Therefore, the
material, with the exception of the report cover page which is an inspection
summary, will not be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely.
09200075 800913
Original Signed By
R
g
ADOCK 05000267
A. B. Hench
PNU
L. J. Callan, Director
Division of Reactor Projects
j
-
,
Enclosures:
(see next page)
-
RIV:
C:
- RPB
C:RPB ,l
DD:0RSS
C:DRP B'
0:DRP4(
ABE
cz
RJE
t
BMurray
REH 1
TWesterman LJCallan
/ Mb/8
T,///88
%/A/88
f/ /88
,K /88
4/12/88
l
ENCL.0SURE CONTAINS
DOCUMENT CONiAINS
SAFEGUARDS IMORMATION
I
SAFEGUARDS INFORMATION
UPON SEPARATION THIS
'\\
PAGE IS DECONTROLLED
, _ _ _ - _ _ _ _ - - _ - _ - _ _
I
.
P
I
i-oi
.
, . .
Public Service Company of Colorado
-2-
Enclosures.
Appendix - NRC Inspection Report
l
50-267/88-19
cc w/ summary page only:
Fort St. Vrain Nuclear Station
Manager, Nuclear Production Division
16805 WCR 19
Platteville, Colorado 80651
Fort St. Vrain Nuclear Station
1
P. Tomlinson, Manager, Quality
!
Assurance Division
L
(same address)
l
Colorado Radiation Control Program Director
l
Colorado Public Utilities Commission
bec copy of entire report:
RIV security File
P. A. Starcher, RSGB/NRR
'
R. D. Martin, RA
,
R. L. Bangart, DRSS
'
l
Chief RPB
'
Section Chief, SEPS:RPB
(
Security Inspector
l
Resident Inspector
,
SEPS:RPB File
G. F. Sanborn, EO
7
D. M. Crutchfield, NRR
i
i
bec copy of letter and inspection summary only w/766-
i
l
MIS
f
RSTS Operator
t
Lisa Shea, RM/ALF
!
Section Chief, DRP/B
i
RIV File
i
R. E. Hall, DRSS
!
Project Engineer DRP/B
[
r
bec copy of letter and inspection summary only w/out 766:
}
DMB IE-04
'
K. Heitner, NRR Project Manager
[
f
ENCLOSURE CONTAINS
SAFIGUARDS INFORil4TN)N
I
UPON SEPARAD0N THIS
I
PAGE IS DECONTROLLED
i
E-
_- - . _ . _ , _ _ _ _ _ _ _ . _ _ . _ . , _ _