October 2, 1998
o
Mr. John F. Franz, Jr.
'
Vice President, Nuclear
Alliant Tower
'
200 First Street SE
P. O. Box 351
i
Cedar Rapids, IA 52406-0351
j
SUBJECT:
DUANE ARNOLD INSPECTION REPORT 50-331/98012(DRP)
Dear Mr. Franz:
i
On September 4,1998, the NRC completed a routine safety inspection at your Duane Amold
,
Energy Center (DAEC) facility. The enclosed report presents the results of that inspection.
During this 6-week inspection period, your conduct of activities at the DAEC facility was
)
characterized by safety conscious operations. In particular, a smooth transition to the use of
Improved Technical Specifications was noted and a planned power reduction evolution was
conducted in a controlled manner. No violations of NRC requirements were identified during
the course of this inspection.
'
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosures will be placed in the NRC Public Document Room.
Sincerely,
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket No.: 50-331
License No.: DPR-49
Enclosure:
Inspection Report 50-331/98012(DRP)
See Attached Distribution
9810090242 981002
ADOOK 05000331
SEE PREVIOUS CONCURRENCES
!
G
DOCUMENT NAME: DUA98012.DRP
To =eceive a copy of this document. indicate in the bos *C' = Copy without attach /e'el *E' = Copy with attech/enti
- N* * No copy
OFFICE
Rlli
Rill
Rlli
NAME
TVegel:co
RLanksbury
GGrant 8/
./r r
DATE
9/
/98
9/
/98
/98
OFFICIAL RECORD COPY
.
..
.
.
.
- . . . - - . .
..
-
.
~ . . . . . . _ - - - . . -
-
.
I
,7
.;
-
L
l
.
.
-J. Franz
-2-~
'
f
i
. cc w/enci:
E. Protsch, Executive Vice President
l
Energy Delivery Alliant;
i
,
j.
President, IES Utilities, Inc.
G. Van Middlesworth,~ Plant Manager
!
K. Peveler, Manager, Regulatory Performance
Chairperson, Iowa Utilities Board
1
i
Distribution:
,
,
Project Mgr., NRR w/enci
'
J. Caldwell, Rlll w/enci
C. Pederson, Rill w/enci
B. Clayton, Rlll w/enci
!
'
SRI Duane Arnold w/enci
DRP w/enci
'
TSS w/enci
>
DRS (2) w/enci
i
Rill PRR w/enci
,
PUBLIC IE-01 w/enci
,
Docket File w/ encl .
!
GREENS
LEO (E-Mail)
.
'
DOCDESK (E-Mail)
_;
W
f
i
l
3
.
J
C00022
i
4
-
,
-,
. ._ ._ _
_ . . _ - .
.__ _ . _ _ . . _
. _ _ _ . _ . _ . . _ _ . _ . _ _ - _
. . - -
.)
5.
i
j
.
Mr. John F. Franz, Jr.
l
Vice President, Nuclear
Alliant Tower
200 First Street SE
l
P. O. Box 351
l
Cedar Rapids, IA 52406-0351
j
SUBJECT:
DUANE ARNOLD INSPECTION REPORT 50-331/98012(DRP)
Dear Mr. Franz:
On September 4,1998, the NRC completed a routine safety inspection at your Duane Arnold
Energy Center (DAEC) facility. The enclosed report presents the results of that inspection.
During this 6-week inspection period, your conduct of activities at the DAEC facility was
characterized by safety conscious operations. In particular, a smooth transition to utilization of
improved Technical Specifications was noted and a planned power reduction evolution was
performed in a controlled manner.
No violations of NRC requirements were identified during the course of this inspection.
1
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosures will be placed in the NRC Public Document Room.
i
j
Sincerely,
Geoffrey E. Grant, Director
Division of Reactor Projects
l
Docket No.: 50-331
License No.: DPR-49
Enclosure:
Inspection Report 50-331/98012(DRP)
l
See Attached Distribution
l
!
DOCUMENT NAME: DUA98012.DRP
1. . ... . . , ., esi . w . w ..
4. in, w c . c.,,
w .
6,.mi
r . co,x
, .ti.cs,
c3
.
e.,y
OFFICE
Rill
Rill
Rill
,
!
NAME
TVegel:co b
RLanksburh/tL GGrant
DATE
9/ 9 /98
9/ '2f /98
9/
/98
l
OFFICIAL RECORD COPY
l
l
-.