ML20154F303

From kanterella
Jump to navigation Jump to search
Ack Receipt of ,Transmitting Rev 56 to Physical Security Plan for Songs.Nrc Approval Is Not Required for Some Changes.Implementation of Changes Will Be Subject to Insp.Encl Withheld
ML20154F303
Person / Time
Site: San Onofre  
Issue date: 10/01/1998
From: Murray B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
References
NUDOCS 9810090161
Download: ML20154F303 (4)


Text

__

e c,##%

UNITED STA'ES

~*

/

NUCLEAR REGULATORY COMMISSION l

e*

REGloNIV 611 RYAN PLAZA DRIVE,SUrrE 400 4 g*

ARLINGTON, TEXAS 76011-8064 0CT -1 1998 Harold B. Ray, Executive Vice President Southem Califomia Edison Co.

San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, Califomia 92674-0128

SUBJECT:

PHYSICAL SECURITY PLAN REVISION 56

Dear Mr. Ray:

This letter acknowledges receipt of your letter dated August 28,1997, which transmitted Revision 56 to the Physical Security Plan for the San Onofre Nuclear Generating Station, submitted under the provisions of 10 CFR 50.54(p).

Based on your determination that the changes do not decrease the effectiveness of your physical security plan and after limited review of the changes, no NRC approval is required for some of the changes, in accordance with 50.54(p).

implementation of the plan changes will be subject to inspection to confirm that the changes have not decreased the effectiveness of your physical security plan, or to confirm that enforcement action is appropriate.

The enclosures to your letter contain Safeguards Information of a type specified in 10 CFR 73.21 and will be withheld from public disclosure, in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter, less enclosures, will be placed in the NRC Public Document Room.

Sincerely, gl o

/J Lb

\\9 Blaine Murray, Chief Plant Support Branch Division of Reactor Safety Docket Nos.: 50-361;50-362 License Nos.: NPF-10; NPF-15 9810090161 9810015" PDR ADOCK 05000361 F

PDR._

4

)

siouthem Califomia Edison Co. cc:

Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335

' San Diego, Califomia 92101 Alan R. Watts, Esq.

Woodruff 3pradlin & Smart 701 S. Parker St. Suite 7000 Orange, Califomia 92868-4720 1

Sherwin Harris, Resource Project Manager Public Utilities Department Cityof Riverside 3900 Main Street Riverside,Califomia 92522 R. W. Krieger, Vice President

. Southem Califomia Edison Company San Onofre Nuclear Generating Station P.O. Box 128 i

San Clemente, Califomia 92674-0128 i

Stephen A. Woods, Senior Health Physicist.

Division of Drinking Water and j

Environmental Management.

Nuclear Emergency Response Program Califomia Department of Health Services P.O. Box 942732, M/S 396 Sacramento, Califomia 94334-7320 Mr. Gary D. Cotton, Sr. Vice President Energy Supply-San Diego Gas & Electric Company P. O. Box 1831 San Diego, Califomia 02112-4150 Mr. Steve Hsu

. Radiological Health Branch '

State Department of Health Seivices P.O. Box 942732 Sacramento, Califomia 94234

a Southem Califomia Edison Co.' Mayor l

City of San Clemente

-100 Avenida Presidio San Clemente, Califomia 92672 -

Mr. Truman Bums \\Mr. Robert Kinosian Califomia Public Utilities Commission 505 Van Ness, Rm. 4102 San Francisco, Califomia 94102 F

1 I

i i

L l

l

7

~.

i Southem Califomia Edison Co. \\

bec to DCD (lC50) -

l l

bec distrib. by RIV:

Regional Administrator DRS Director DRS Deputy Director

~ Resident inspector DRP Director DRS-PSB Branch Chief (DRP/E)

) MIS System Senior Project inspector (DRP/E)

RIV File Branch Chief (DRP/TSS) i DOCUMENT NAME: g:\\sg.mid\\97SOO25.abe To receive copy of document, Indicate in box: *C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy L

RIV:PSB'

..A C:PSB nc ABEarnest/imph[

BMurray 1)

~

l 10///98 10/\\/98 OFFICIAL RECORD COPY 000007